
Safety training — knowledge saves lives
HSE Training Library
87 HSE Training Modules for UAE Construction Sites
Watch, learn, and certify your team. Each module includes a narrated training video, learning objectives, a knowledge assessment quiz, and a signed acknowledgement form for your HR records.
Platform course-completion record
Platform course-completion record
Complete all 10 required modules below to unlock a printable platform course-completion record (EN + AR).
- Safety LeadershipOpen module
- Stop Work AuthorityOpen module
- PPE Selection & UseOpen module
- Permit to WorkOpen module
- Pre-Task BriefingOpen module
- Fire ProtectionOpen module
- Emergency EvacuationOpen module
- Edge Protection & Working at HeightOpen module
- Confined Space EntryOpen module
- Incident Investigation & RCAOpen module
Jump straight to
Browse by sectionGround works, dewatering, monitoring, SIMOPS, emergency rescue, high-risk construction controls, access & work at height and site handover — grouped in the order you run them on site.All Training Modules
Aligned with UAE Federal Decree-Law No. 33 of 2021, ADOSH-SF (formerly OSHAD), Dubai Municipality, and Trakhees regulations.
The first 3 modules are free. Upgrade to Pro to unlock every video.
Site Operations
Material Handling & Logistics Safety
ProSite stores, loading and unloading, telehandler and crane operations, banksman role, exclusion zones, and pedestrian control.
Site Mobilization Safety
ProEvery step from initial site establishment through to offices, stores, and welfare facilities in place and construction ready to begin.
Site Traffic Management
ProSeparate the people from the plant. Traffic Management Plans, pedestrian-vehicle segregation, banksman controls, reversing rules, delivery management and the 10 km/h site speed limit.
Daily Operational Safety Requirements
ProEvery safe day starts before work begins. The daily safety cycle: morning start-up routine (briefing, PTW activation, pre-task briefings), the 5-step daily safety walk, PTW management throughout the day, subcontractor daily monitoring, incident and near-miss response, and the end-of-day close-out inspection.
Concrete Formwork Safety
ProSafe erection, use and striking of concrete formwork and falsework on UAE construction sites — design checks, propping, pour sequencing, and collapse prevention.
Steel Fixing Safety
ProSafe rebar handling, cutting, bending, fixing and impalement prevention on UAE construction sites — including ergonomics, PPE, and working over open rebar mats.
Enabling Works Safety
ProSafe execution of enabling works on UAE construction projects — site clearance, demolition, service diversions, temporary hoarding, and utility isolations before main works commence.
Crane Operations Safety
ProSafe lifting operations on UAE construction sites — crane selection, lift plans, competencies, exclusion zones, tandem lifts, weather limits and adjacent-crane clash management.
Driving Safety
ProSafe driving of light and heavy vehicles for UAE construction site duties — journey management, fatigue, seat-belts, mobile-phone rules, and site-road speed and priority controls.
Night Work Safety
ProManaging night-shift construction safely on UAE sites — lighting, visibility, fatigue, neighbour impact, security and authority-permit conditions for after-dark works.
Environmental Management on Site
ProSite environmental controls under Federal Law 24 of 1999 and municipality EHS rules — dust, noise, water, waste segregation, spill prevention and biodiversity.
Authority Notification & Industrial / Free-Zone Utility Handover — Final Site Clearance
ProHow to notify Dubai Municipality, Abu Dhabi Municipality / DMT, EAD or a free-zone authority for final site clearance and environmental handover, and how to run the PM-01 to PM-20 permanent utility handover and meter-closure checklist across industrial and free-zone jurisdictions. Includes the editable email template, mandatory attachment schedule and the decision matrix that separates a permanent-meter transfer from a permanent-meter removal.
Final Utility & Environmental Clearance — Demobilisation and Client Handover
ProThe Final Utility & Environmental Clearance gate that sits before temporary services, welfare, equipment or environmental controls are removed: select the utility end state first, then run the conditional Dubai, Abu Dhabi and Sharjah authority controls, the UE-01 to UE-20 clearance checklist and the planning-versus-authority-timing model. A configurable project-control checklist and management teaching aid — not legal advice, and not a substitute for current authority, utility or permit-condition confirmation.
Site Mobilisation, Demobilisation & Client Handover — UAE Authority Readiness
ProJurisdiction-first readiness control for UAE projects: resolve the controlling authority before issuing any checklist, then run the M-01 to M-20 mobilisation gate, the D-01 to D-24 demobilisation, closeout and client-handover register, the timeframe model and the management dashboard. A planning and evidence-management tool — verify requirements, portals, fees and inspection availability with the appointed consultant and responsible authority before formal submission.
Gas Cylinders, Oxy-Fuel Equipment & Compressed Gas Storage
ProCovers the safe handling, transport, storage and use of compressed gas cylinders and oxy-fuel welding/cutting equipment on UAE construction sites, including segregation, flashback arrestors and desert climate hazards.
Lifting Accessories, Slinging, Rigging & Banksman Signalling
ProCovers safe use of lifting accessories, sling angle and load calculations, rigging inspection, exclusion zones, and standard banksman/signaller hand signals required on UAE construction lifting operations.
Mobile Plant, Reversing Operations & Pedestrian Segregation
ProControlling the interface between mobile plant and pedestrians on UAE construction sites — traffic management plans, banksman procedures, reversing controls and segregation infrastructure required under ADOSH-SF (formerly OSHAD) and Dubai Municipality codes.
Demolition, Dismantling & Structural Alteration Safety
ProPlanning and controlling demolition, dismantling and structural alteration works on UAE sites — surveys, method statements, structural stability, exclusion zones and utility isolation under Dubai Municipality and Trakhees CSR requirements.
Work Over Water, Marine Interfaces & Drowning Prevention
ProControls for construction and marine works over or adjacent to water in the UAE — jetties, dredging, marine piling and coastal reclamation — covering lifejackets, rescue craft and Federal Transport Authority / port authority marine rules.
Track training completion in your account
Sign in to log sessions, upload attendance sheets and certificates, and keep an auditable training record for MOIAT, ADOSH-SF (formerly OSHAD) and Trakhees inspections.
Open Training Records →