Material Handling & Logistics Safety
Site stores, loading and unloading, telehandler and crane operations, banksman role, exclusion zones, and pedestrian control.
Learning Objectives
- Plan a safe delivery: route, offload zone, banksman, exclusion zone.
- Identify the correct lifting accessory (slings, shackles, spreader) for a load.
- Understand telehandler and mobile crane pre-use checks.
- Apply the banksman signals per BS 7121.
- Separate pedestrians and plant with hard barriers and dedicated walkways.
Training Video
ProPreview
8-minute video
Unlock this training video
The first 3 modules are free. Upgrade to Pro to watch every module, save progress, and issue certificates.
Upgrade to ProModule Content
1. Delivery Planning
Every delivery starts with a Delivery Management Plan: route from gate to offload point, timing (outside peak), banksman assigned, exclusion zone marked, ground bearing capacity verified. No delivery enters site without pre-approval.
2. Lifting Accessories
Slings, shackles, spreader beams and lifting eyes must be certified by a third party (Trakhees or equivalent), inspected quarterly and colour-coded for the current quarter. Any accessory without a legible tag is quarantined.
3. Telehandler Operations
Operator holds a valid UAE-recognised licence. Pre-use check includes tyres, hydraulics, load chart, seat belt, reversing alarm. Load never exceeds the chart for the boom angle. Loads over 1.5 m are guided by a banksman.
4. Mobile Crane Setup
Ground bearing pressure calculated, outrigger mats sized to the load. Third-party lift plan required for tandem lifts, blind lifts, and loads > 90% of SWL. Wind speed monitored — stop lifting at 32 km/h (or manufacturer limit if lower).
5. Banksman
One banksman per lift, high-vis vest of distinct colour, radio contact with operator, uses BS 7121 hand signals. Only the banksman gives signals except for the emergency STOP, which anyone can give.
6. Pedestrian Segregation
Hard barriers separate walkways from plant zones. Crossings are controlled by banksmen or stop-go signals. Reverse-parking is mandatory for all site vehicles. Reversing without a banksman in a pedestrian area is a Category A violation.
Knowledge Assessment
1. A Delivery Management Plan must be approved:
2. Lifting slings on a UAE site must be inspected at least:
3. Mobile crane operations must stop when wind speed reaches:
4. A third-party lift plan is required for:
5. Banksman hand signals are standardised under:
6. Who may give an emergency STOP signal during a lift?
7. Site vehicles must:
8. A telehandler load exceeding the load chart for the boom angle:
9. Pedestrians and mobile plant must be separated by:
10. A lifting accessory without a legible inspection tag must be: