Construction site temporary electrical distribution board with RCDs and armoured cabling

Site electrical inspection checklist

Back to Site Electrical

Site electrical inspection checklist

98 checks across 10 areas, each referenced to the UAE authority or standard that requires it. Last updated 2 August 2026.

Saved on this device only — sign in to save progress to your account

New to temporary power on UAE sites? Read the guide to temporary electrical supply & RCD requirements for the ratings, testing intervals and records behind these checks.

0 of 98 complete91 critical items outstanding

Earthing & Bonding

  • IEC 60364-5-54 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 60364-4-41 / ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 60364-5-54

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 60364-4-41

    critical
  • DoE EWR 2020 / Dubai Building Code

    standard
  • BS 7671 / DoE EWR 2020

    critical

Power Isolation & LOTO

  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 60364 / Manufacturer requirements

    critical
  • ADOSH-SF CoP 15.0

    critical

Distribution Boards (DBs)

  • DoE EWR 2020 / Dubai Building Code 2021

    critical
  • IEC 60529 / BS 4363

    critical
  • DoE EWR 2020 Section 9.5

    critical
  • IEC 60364 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0 / Dubai Building Code

    critical
  • IEC 60364 / ADOSH-SF CoP 15.0

    critical
  • BS 4363 / ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical
  • UAE climate requirement

    critical
  • ADOSH-SF CoP 15.0

    critical

RCDs (Residual Current Devices)

  • DoE EWR 2020 / Dubai Building Code 2021

    critical
  • DoE EWR 2020 / ADOSH-SF CoP 15.0

    critical
  • DoE EWR 2020 / Dubai Building Code 2021

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 61008 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 61008

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical

Breakers, MCBs & LCBs

  • DoE EWR 2020 / Dubai Building Code 2021

    critical
  • IEC 60947-2 / ADDC checklist

    critical
  • ADDC Electrical Drawings Checklist

    critical
  • IEC 60898

    critical
  • BS 4363 / ADOSH-SF CoP 15.0

    critical
  • IEC 60364 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0 / Dubai Building Code

    standard

Generators & Temporary Power

  • IEC 60364-5-54 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • DEWA / ADDC regulations

    critical
  • UAE Fire & Life Safety Code

    critical
  • ADOSH-SF CoP 15.0

    critical
  • UAE Fire & Life Safety Code

    critical
  • UAE Fire & Life Safety Code

    critical
  • UAE Fire & Life Safety Code

    critical
  • DEWA / ADDC regulations

    critical
  • ADOSH-SF CoP 15.0

    critical

Cabling & Wiring

  • IEC 60364-5-52 / DoE EWR 2020

    critical
  • DoE EWR 2020 / Dubai Building Code

    critical
  • ADDC Electrical Drawings Checklist

    critical
  • ADOSH-SF CoP 15.0 / DM CCSP

    critical
  • ADOSH-SF CoP 15.0

    critical
  • UAE climate requirement

    critical
  • IEC 60446 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    critical

Site Offices & Welfare Areas

  • DoE EWR 2020 / ADOSH-SF CoP 15.0

    critical
  • UAE Fire & Life Safety Code / ADOSH-SF CoP 15.0

    critical
  • UAE Fire & Life Safety Code

    critical
  • DoE EWR 2020 / IEC 60364

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 60364-7-701 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0

    standard
  • IEC 60364-4-41 / ADOSH-SF CoP 15.0

    critical

Inspection & Testing

  • DoE EWR 2020 / ADOSH-SF CoP 15.0

    critical
  • IEC 60364-6 / DoE EWR 2020

    critical
  • IEC 60364-6 / DoE EWR 2020

    critical
  • IEC 60364-6 / ADOSH-SF CoP 15.0

    critical
  • IEC 60364-6 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • UAE Electrical Regulations

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0 / DM CCSP

    critical
  • DoE EWR 2020 / Dubai Building Code

    critical

Water Coolers, Pumps & Bathrooms

  • IEC 60364-7-701 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • ADOSH-SF CoP 15.0 / IEC 60364

    critical
  • ADOSH-SF CoP 15.0

    standard
  • IEC 60364-5-53 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical
  • IEC 60364-4-41 / IEC 62423

    critical
  • IEC 60364-7-701 / DoE EWR 2020

    critical
  • Manufacturer / ADOSH-SF CoP 15.0

    standard
  • ADOSH-SF CoP 15.0

    standard
  • IEC 60364-7-701 / DoE EWR 2020

    critical
  • IEC 60364-7-701

    critical
  • IEC 60364-5-54 / DoE EWR 2020

    critical
  • IEC 60364-7-701

    standard
  • ADOSH-SF CoP 15.0 / DoE EWR 2020

    critical
  • ADOSH-SF CoP 15.0

    critical

How to run the inspection

The order below keeps the walk-round safe and makes the printed record defensible in a client or authority audit.

  1. 1

    Record the site details

    Enter the site or project name, the emirate and the inspector so the printed record identifies who carried out the inspection and which supply authority's rules apply.

  2. 2

    Isolate and verify dead before opening enclosures

    Apply lock-out/tag-out at the isolation point, prove the tester, prove dead and prove the tester again before any distribution board or enclosure is opened for inspection.

  3. 3

    Walk the supply from source to final circuit

    Work through the categories in order — earthing and bonding, isolation, distribution boards, RCDs, breakers, generators, cabling — ticking each check as you verify it on site.

  4. 4

    Test RCDs and record instrument readings

    Trip-test every RCD, measure earth electrode and continuity values, and note the instrument serial number and calibration date against the inspection and testing section.

  5. 5

    Close out critical items before energising

    Any outstanding critical item stops energisation. Assign an owner and a date to each open item, then re-inspect once the corrective action is complete.

  6. 6

    Print or save the completed record

    Print the checklist to PDF and file it in your inspection and test register alongside the instrument results and the competent person's certification.

Frequently asked questions

Is the site electrical inspection checklist free?

Yes. All 98 checks are free to use with no sign-up. Progress is saved in your browser on the device you use, and you can print the whole checklist for a paper walk-round at any time.

What does the checklist cover?

Earthing and bonding, isolation and lock-out/tag-out, distribution boards, RCDs, breakers/MCBs/LCBs, generators and temporary power sources, cabling and wiring, site offices and welfare areas, water coolers, water and sewage pumps and site bathrooms, and inspection and testing records — each check referenced to the UAE authority or standard that requires it.

Are water coolers, water pumps and site toilets covered by the checklist?

Yes. A dedicated 16-point section covers drinking water coolers and dispensers, water transfer, booster, dewatering and sewage pumps, electric water heaters, and toilet and ablution blocks — including 30 mA RCD protection, Type B RCDs for inverter-driven pumps, supplementary equipotential bonding, IP/zone ratings under IEC 60364-7-701, and the 3-monthly portable appliance testing interval used on UAE construction sites.

What do the critical, standard and advisory labels mean?

Critical items are those where a failure can cause electrocution, arc flash or fire and should stop energisation until closed. Standard items are mandatory compliance points required by the supply authority or standard. Advisory items are recognised good practice that inspectors commonly look for but which are not strictly mandated.

Can I use the completed checklist as evidence in an authority or client audit?

It is designed for that. Fill in the site, emirate and inspector fields, complete the walk-round, then print to PDF so the record carries the date, the inspector name and the reference for each check. Keep it in your inspection and test register alongside the instrument test results.