Working at height inspection checklist
115 checks across 9 areas, each referenced to the UAE authority or standard that requires it — ADOSH-SF CoP 8.0, the Dubai Municipality Code of Construction Safety Practice and the BS/EN standards they call up. Last updated 2 August 2026.
Also running temporary power checks? Open the site electrical inspection checklist.
Planning & Permits
ADOSH-SF CoP 8.0 / DM CoCSP
criticalADOSH-SF CoP 8.0
criticalDM CoCSP / Trakhees EHS
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalMOHRE MR 32/2022
criticalADOSH-SF CoP 8.0
criticalDM CoCSP
criticalADOSH-SF CoP 8.0
criticalMOHRE midday break decision
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
standard
Scaffolding
ADOSH-SF CoP 8.0 / DM CoCSP
criticalBS EN 12811-1 / BS 5975
criticalDM CoCSP
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalDM CoCSP
criticalBS EN 12811-1
criticalBS 5975
criticalBS EN 12811-1
criticalBS EN 12811-1
criticalBS 5975
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
standardBS EN 12811-1
criticalBS 5975
criticalADOSH-SF CoP 15.0
standardBS EN 795
criticalBS 1139
criticalDM CoCSP
standard
Mobile Access Towers
BS EN 1004 / manufacturer
criticalBS EN 1004
standardBS EN 1004
criticalBS EN 1004
criticalBS EN 1004
criticalBS EN 1004
criticalADOSH-SF CoP 8.0
critical
Ladders & Stepladders
ADOSH-SF CoP 8.0
criticalBS EN 131
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 15.0
criticalBS EN 131
criticalBS EN 131
criticalADOSH-SF CoP 8.0
criticalClient/consultant HSE requirement
criticalADOSH-SF CoP 8.0
criticalBS EN 131
criticalDM CoCSP
standard
Edge Protection & Openings
ADOSH-SF CoP 8.0 / BS EN 13374
criticalBS EN 12811-1
criticalBS EN 13374
criticalDM CoCSP
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalDM CoCSP
criticalADOSH-SF CoP 8.0
criticalDM CoCSP
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalBS EN 1263-2
criticalBS EN 1263-2
criticalBS EN 1263-2
critical
Fall Arrest & PPE
BS EN 361
criticalBS 8437
criticalBS 8437
criticalBS 8437
criticalADOSH-SF CoP 23.0 / BS EN 795
criticalBS 8437
criticalBS EN 795 Class C
criticalBS EN 795
criticalBS EN 362
criticalADOSH-SF CoP 8.0
criticalBS 8437
criticalBS 8437
criticalManufacturer / BS 8437
standardBS 8437
criticalBS 8437
criticalManufacturer
standardADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
critical
MEWPs & Suspended Access
BS EN 280 / DM CoCSP
criticalADOSH-SF CoP 8.0
criticalBS EN 280
criticalADOSH-SF CoP 8.0
criticalBS EN 280
criticalADOSH-SF CoP 8.0
criticalBS EN 280
criticalADOSH-SF CoP 15.0
criticalBS EN 280
criticalADOSH-SF CoP 8.0
criticalBS EN 1808
criticalIRATA ICOP
critical
Fragile Surfaces & Roof Work
ADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 9.0 / DM
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalBS EN 13374
criticalDM CoCSP
standardMOHRE / ADOSH-SF CoP 3.0
criticalManufacturer / BS 8437
standard
Rescue & Emergency Response
ADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalDM CoCSP
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
criticalMOHRE MR 32/2022
criticalADOSH-SF CoP 8.0
criticalADOSH-SF CoP 8.0
critical
How to run the inspection
The order below keeps the walk-round safe and makes the printed record defensible in a client or authority audit.
- 1
Record the site details
Enter the site or project name, the emirate and the inspector so the printed record identifies who carried out the inspection and which authority's rules apply — ADOSH-SF in Abu Dhabi, Dubai Municipality, Trakhees, DDA or OSHJ.
- 2
Check the paperwork before the plant
Confirm the task-specific RAMS, the work at height permit for this shift, the rescue plan and the training records for everyone on the crew before you walk the physical works.
- 3
Work top-down through the access equipment
Inspect scaffolds and towers against their tags and design, then ladders against the register and colour code, checking angle, securing and classification as you go.
- 4
Verify collective protection at every edge
Walk every slab edge, stair, lift shaft and floor opening. Guardrail geometry, toe boards, secured and marked covers and capped rebar come before any harness discussion.
- 5
Inspect fall arrest equipment and calculate clearance
Check harnesses, lanyards and connectors against the register and their 6-monthly examination, confirm the anchor certification, and prove there is enough clearance below the anchor to arrest a fall.
- 6
Test the rescue arrangement
Confirm two trained rescuers, the rescue kit or standby MEWP at the work area, and that the last drill was within six months. No rescue capability means no work at height.
- 7
Close out critical items and file the record
Any outstanding critical item stops the work. Assign an owner and a date, export the PDF into your inspection register, and re-inspect once the corrective action is complete.
Frequently asked questions
Is the working at height checklist free?
Yes. Every check is free to use with no sign-up. Progress is saved in your browser on the device you use, and it syncs to your account when you sign in. You can print the whole checklist or export a branded PDF for a paper walk-round at any time.
What does the checklist cover?
Planning and permits, scaffolding, mobile access towers, ladders and stepladders, edge protection and floor openings, fall arrest and PPE, MEWPs and suspended access, fragile surfaces and roof work, and rescue and emergency response — each check referenced to the ADOSH-SF code, Dubai Municipality requirement or BS/EN standard behind it.
What do the critical, standard and advisory labels mean?
Critical items are those where a failure can cause a fatal fall or a dropped-object fatality and should stop the work until closed out. Standard items are mandatory compliance points required by the authority or standard. Advisory items are recognised good practice that UAE inspectors and client auditors commonly look for but which are not strictly mandated.
Can I use the exported PDF as an audit record?
Yes. The export carries the site, emirate, inspector, completion percentage, outstanding critical items and a sign-off block for the competent person and the client representative, which is the format consultants and authority inspectors expect to see in the inspection register.