Plant Inspection & Maintenance

Plant register requirements, inspection schedules, third-party examination, defect reporting, and maintenance documentation requirements under ADOSH-SF CoP 36.0 and CoP 53.0 for UAE construction sites.

Plant Register

ADOSH-SF CoP 53.0 (OSH Construction Management Plan) requires that a plant register is maintained on every construction site. The plant register must list all plant and equipment on site, including the type, make, model, serial number, date of last inspection, date of next inspection, and the name of the responsible person. The plant register must be available for inspection by the authority at all times.

  • Plant register

    Mandatory — all plant listed with inspection dates

    critical
  • Register content

    Type, make, model, serial number, inspection dates, responsible person

    critical
  • Availability

    Available for authority inspection at all times

    critical
  • Update frequency

    Updated whenever plant arrives on or leaves site

    critical

Inspection Documentation

All plant inspection records must be maintained on site and available for inspection. ADOSH-SF CoP 36.0 requires that inspection records are kept for a minimum of 2 years. For lifting equipment, ADOSH-SF CoP 34.0 requires that thorough examination certificates are kept for the life of the equipment. Defect reports and repair records must also be maintained.

  • Inspection records retention

    Minimum 2 years (CoP 36.0) / Life of equipment for lifting (CoP 34.0)

    critical
  • Daily inspection records

    Retained for minimum 3 months

    critical
  • Defect reports

    Written defect report for every defect found — retained with plant records

    critical
  • Repair records

    Written record of all repairs — retained with plant records

    critical
  • Third-party certificates

    Kept on site — available for authority inspection

    critical

Colour Coding System

Many UAE construction sites use a quarterly colour coding system for plant and equipment inspection. Each quarter is assigned a colour (typically red, yellow, blue, green) and inspected plant is tagged with the current quarter's colour. This provides a quick visual indication of whether plant has been inspected in the current period. While not a specific ADOSH-SF requirement, this system is widely used and accepted by UAE authorities.

QuarterMonthsColour
Q1January – MarchRed
Q2April – JuneYellow
Q3July – SeptemberBlue
Q4October – DecemberGreen

The colour coding system is a site management tool and does not replace the formal inspection documentation requirements of ADOSH-SF CoP 36.0 and CoP 34.0. All plant must have both a current colour tag AND documented inspection records.