87 HSE Training Modules for UAE Construction Sites
Watch, learn, and certify your team. Each module includes a narrated training video, learning objectives, a knowledge assessment quiz, and a signed acknowledgement form for your HR records.
Platform course-completion record
Platform course-completion record
Complete all 10 required modules below to unlock a printable platform course-completion record (EN + AR).
- Safety LeadershipOpen module
- Stop Work AuthorityOpen module
- PPE Selection & UseOpen module
- Permit to WorkOpen module
- Pre-Task BriefingOpen module
- Fire ProtectionOpen module
- Emergency EvacuationOpen module
- Edge Protection & Working at HeightOpen module
- Confined Space EntryOpen module
- Incident Investigation & RCAOpen module
Jump straight to
Browse by sectionGround works, dewatering, monitoring, SIMOPS, emergency rescue, high-risk construction controls, access & work at height and site handover — grouped in the order you run them on site.All Training Modules
Aligned with UAE Federal Decree-Law No. 33 of 2021, ADOSH-SF (formerly OSHAD), Dubai Municipality, and Trakhees regulations.
The first 3 modules are free. Upgrade to Pro to unlock every video.
Ground Works
Excavation & Trenching Safety
ProUAE excavation hazards, NOCs, GPR scanning, shoring and battering, confined space considerations, and the competent person inspection regime.
Deep Excavation & Temporary Works
ProThe parent work package for deep excavation: geotechnical and groundwater investigation, temporary-works design and independent check, excavation sequencing, stability, access and emergency controls.
Sheet Piling, Shoring & Propping
ProInstallation and extraction of sheet piles, pile-driving hazards, lifting and rigging, walings, struts, tie rods and anchors, monitoring and alteration control.
Construction Dewatering & Groundwater Control
ProDewatering design, wellpoints, deep wells and sump pumping, standby pumps, temporary electrical supply, drawdown and settlement control, monitoring, shutdown and system removal.
Underground Services, Adjacent Structures & Monitoring
ProNOCs and utility protection, pre-condition surveys, inclinometers and settlement markers, vibration and noise monitoring, exclusion zones, public protection and traffic management.
Deep Excavation & Sheet Piling: High-Risk Interfaces and PTW
ProHow the primary excavation permit-to-work links to utility NOCs, isolation certificates, confined-space entry, hot work, critical lifts, dewatering discharge approvals and road/traffic permits under ADOSH-SF CoP 21.0 and CoP 29.0.
Continuous Deep Excavation & Dewatering: Handover and Rescue Readiness
ProShift-change and contractor handover for continuous deep excavation and dewatering, plus the emergency-response and rescue prerequisites that must be verified before the controlling PTW is issued.
Excavation Monitoring Framework & Contractor Audit
ProSoil and groundwater monitoring requirements for the excavation safety plan — instruments, baselines, trigger-action-response — and a contractor audit checklist with critical audit-fail conditions.
Municipal Dewatering & Groundwater-Discharge Approvals (UAE)
ProJurisdiction-by-jurisdiction approval routes for construction dewatering and groundwater discharge in Abu Dhabi, Dubai (DDA and municipal/waterway areas) and Sharjah, plus the permit register and site compliance controls.
Flooded Excavation Collapse: Emergency Response & Rescue
ProActivation thresholds, command structure, timed immediate actions, rescue prerequisites and no-go conditions, stabilisation tactics, notifications and PTW restoration for a flooded or collapsed deep excavation.
Excavation Monitoring Trigger Levels (Alert–Action–Alarm)
ProBuild a defensible Alert–Action–Alarm trigger register for inclinometers and piezometers on deep excavations — formula rules, stage-specific alarm values, reading validity and the PTW response at each level.
Electrical Dewatering-Pump PTW & LOTO Isolation
ProIsolate an electrical dewatering pump safely under a controlling permit — energy source identification, standby resilience, lock-out execution, voltage proving, try-start verification and controlled return to service.
Intermediate Shoring Stage Release & Authority Submission (Dubai / Abu Dhabi DMT)
ProDecide correctly what must be produced, signed and submitted before releasing an intermediate shoring level — Dubai Municipality and DDA third-party review rules, Abu Dhabi DMT permit classification, the 11-record stage release pack and the authority submission decision logic.
Work Inside an Active Excavation (Foundations, Walls, Scaffold, Pours)
ProExcavation controls do not end when foundations, basement walls, formwork or scaffolding begin — they layer. Covers retained excavation controls, activity-specific release controls, SIMOPS coordination, the cumulative permit/release stack and the formal tests for reducing or withdrawing excavation controls.
Shoring & Strut Removal: Strength Verification, Consultant Sign-off and SIMOPS
ProThere is no universal UAE percentage that authorises strut or temporary-shoring removal. Covers the seven release gates, the auditable strength-verification and consultant sign-off pack, Dubai's written-consent rule for anchor removal, and the SIMOPS control matrix for earthmoving, crane lifting, formwork and dewatering inside a retained excavation.
In-Situ Concrete Verification & Crane-Above-Formwork SIMOPS
ProHow to qualify a third-party testing laboratory to ISO/IEC 17025:2017 for the exact test method, where rebound hammer and UPV legitimately sit in a shoring-release decision, when cores are required, and how to run crane lifting above active internal formwork floors without putting anyone under a suspended load.
Lower-Basement Emergency Evacuation & Rescue During Lifting and Concreting
ProEmergency evacuation and rescue for congested internal lower-basement workfaces where heavy lifting, concrete pumping, formwork and reinforcement, dewatering and retained-excavation controls run at the same time — pre-start rescue release gate, SIMOPS emergency zoning, the all-stop sequence, controlled casualty transfer and the drill that proves it.
SIMOPS Incident Reporting & Crane–Formwork Exclusion-Zone Audit
ProWorking compliance procedure for notifying and investigating a major SIMOPS incident in the UAE — emergency services, MOHRE, Abu Dhabi Form G / Form G1 and municipal permit routes — together with the crane-above-formwork exclusion-zone audit that keeps crews out of the lift and fall envelope. Working compliance analysis, not legal advice: verify live permit conditions and authority routing with a qualified UAE legal/HSE professional.
Multi-Casualty Lower-Basement Medical Response, Evacuation & SIMOPS Enforcement
ProProject-adaptation procedure for a congested lower-basement workface where a collapse, crane incident, falling object, formwork failure, fire or flood produces multiple actual or potential casualties: readiness gate, alarm and zoning clock, triage and casualty movement, command roles, and an NC-1 to NC-5 enforcement matrix that separates authority sanction from contractual remedy. Not a substitute for emergency-service instruction, the approved emergency plan, fire/life-safety design or contract review.
CoP 46.0 Worker Extraction & Rescue Equipment for Confined Lower-Basement Conditions
ProWhat ADPHC CoP 46.0 actually mandates for first aid, casualty movement, evacuation, rescue capability and extraction equipment underground — plus the scope-applicability question for a conventional lower basement, the 25-person rescue-team trigger, workforce scaling, and the NC severity / enforcement split. Reports the Code's stated provisions; it does not add generic standards the Code does not state, and it is not a substitute for the approved emergency plan or authority confirmation.
Track training completion in your account
Sign in to log sessions, upload attendance sheets and certificates, and keep an auditable training record for MOIAT, ADOSH-SF (formerly OSHAD) and Trakhees inspections.
Open Training Records →