8.1.1 Operational planning and control
What this clause is about
Plan and control day-to-day work so it is done safely, following set criteria, and adapt work to workers where needed.
Questions auditors ask
- What controls apply to high-risk work?
- Show me the method statement for today's task.
- How is work adapted in summer heat?
Evidence to keep on a UAE site
- Approved RAMS / method statements
- Permit-to-work records
- Heat stress plan and midday break compliance
Where it lives in the system: Permits to work, Inspections, Scaffolding register
Clause 8.1.1 in detail8.1.2 Eliminating hazards and reducing OH&S risks
What this clause is about
Remove hazards and reduce risks using the hierarchy: eliminate, substitute, engineer, administer, then PPE.
Questions auditors ask
- Give an example where a hazard was eliminated.
- Why is PPE the chosen control here?
- How were controls selected?
Evidence to keep on a UAE site
- Risk assessments showing control ranking
- Design reviews removing hazards
- Records of substitutions (e.g. safer materials or methods)
Where it lives in the system: Risk register, PPE matrix
Clause 8.1.2 in detail8.1.3 Management of change
What this clause is about
Manage planned changes — new methods, equipment, laws, people — so they don't create new unassessed risks.
Questions auditors ask
- How is a change assessed before it happens?
- Who approves it?
- Show a recent example.
Evidence to keep on a UAE site
- Management of change forms with risk review
- Updated RAMS after the change
- Approval signatures
Where it lives in the system: Management of change, Design change control
Clause 8.1.3 in detail8.1.4 Procurement, contractors and outsourcing
What this clause is about
Control buying, contractors and outsourced work so they meet your safety requirements.
Questions auditors ask
- How are subcontractors pre-qualified?
- How do you monitor their safety on site?
- How are purchased items checked for safety?
Evidence to keep on a UAE site
- Subcontractor pre-qualification records
- Subcontractor inspection and performance records
- Equipment inspection certificates on arrival
Where it lives in the system: Subcontractor prequalification, Contractor scorecard, Subcontractor dashboard
Clause 8.1.4 in detail8.2 Emergency preparedness and response
What this clause is about
Prepare for and respond to emergencies — plan, train, test through drills and improve after each one.
Questions auditors ask
- What emergencies could happen here?
- When was the last drill and what did it show?
- Are first aid and rescue arrangements in place?
Evidence to keep on a UAE site
- Emergency response plan per site
- Drill reports with lessons learned
- First aider and fire warden lists
- Rescue plans for work at height and confined spaces
Where it lives in the system: Emergency response scenarios, Emergency drills, Emergency contacts
Clause 8.2 in detail