Skip to main content
Got a site safety question? Ask UAE HSE practitioners in the community Q&A.Ask the community
Site Safety UAE — construction site safety software logoSite Safety UAE
Login
ISO 45001:2018 · 9. Performance evaluation

9.1.1 Monitoring, measurement, analysis and performance evaluation

Determine what needs to be monitored and measured, the methods, and when results are analysed and evaluated.

What this clause is about

Decide what to measure, how and when, then monitor and analyse safety performance with calibrated equipment where relevant.

Questions auditors ask

  • What do you measure and why?
  • How often are results analysed?
  • Is monitoring equipment calibrated?

Evidence to keep on a UAE site

  • KPI dashboard and monthly reports
  • Inspection and audit schedules with results
  • Calibration certificates (gas detectors, noise meters)

Written in plain language by Site Safety UAE — not the official wording of the standard.

How Site Safety UAE covers this clause

Audit evidence to have ready

  • KPI reports
  • Inspection scores
  • Trend analysis
Performance monitoring evidence
  • KPI report for the period (leading and lagging indicators)
  • Objectives and targets with progress against each
  • Trend analysis or rollup export used at the review

Where to find it: Dashboard → Trends tab → set the date range, then Export to CSV/Excel to file the exact figures reviewed.

Open HSE Operations dashboard

Guidance only — clause text is paraphrased and certification decisions rest with your certification body.

Next step

Turn this into evidence you can hand over

Map every ISO 45001 clause to the record that proves it, and close the gaps before your certification body arrives.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.