Confined Space Requirements in the UAE: Abu Dhabi, Dubai, Sharjah and the Other Emirates

The published confined space rules for Abu Dhabi (CoP 27.0), Dubai Municipality (Chapter 19) and Sharjah (OSHJ-CoP-06) compared side by side — what they share, where the gas limits, ventilation, attendant and rescue rules differ, and what was not verified.

26 November 2026 8 min readBy Site Safety UAE
Confined Space Requirements in the UAE: Abu Dhabi, Dubai, Sharjah and the Other Emirates

Blank confined space entry permit

A blank entry permit template covering permit details, hazards, gas testing, isolation, the stand-by person, communication, rescue arrangements, authorisation, an entry log and closure. Gas test limits differ between emirates — confirm the limits that apply to your site before use. This template is general awareness material and does not replace your authority's requirements or your own procedures.

The same form is also available in Arabic, with the same fields, for sites whose teams work in Arabic.

Not yet verified

Trakhees: only the two Trakhees documents named in the Trakhees section were checked; its October 2026 Construction Safety Manual was not reviewed. Not verified in this review: confined-space requirements of other Dubai free-zone authorities, and any emirate-specific code for Ajman, Ras Al Khaimah, Umm Al Quwain or Fujairah. Do not apply the Abu Dhabi, Dubai Municipality or Sharjah figures below to those sites; obtain the current requirements from the responsible authority and the client.

Source review: 24 November 2026, against the official Abu Dhabi, Dubai Municipality, Sharjah and Trakhees documents listed at the end. Each document applies in its own jurisdiction; none of them is a UAE-wide rule. This is a dated review, not legal clearance. Confirm current authority, free-zone and client requirements before use.

Confined space work kills in the same way in every emirate — oxygen deficiency, toxic or flammable gas, engulfment, and would-be rescuers who go in after a colleague. The controls in the published Abu Dhabi, Dubai and Sharjah documents are built around the same idea. The details are not: the flammable-gas limit, the ventilation figure, the written programme and who must be on site differ. A permit form copied from a project in another emirate can leave out a requirement that applies where you are working.

Which document applies

  • Abu Dhabi: ADOSH-SF Code of Practice 27.0 — Confined Spaces, Version 4.0 (15 July 2024), issued under the Abu Dhabi Public Health Centre. It applies to all employers in the Emirate of Abu Dhabi and links to CoP 21.0 (Permit to Work) and, for construction, CoP 53.0.
  • Dubai: Dubai Municipality's Safety Guide for Construction Works, Chapter 19 — Confined Spaces, for construction sites under Dubai Municipality. Free zones and other Dubai authorities may set their own requirements.
  • Sharjah: OSHJ-CoP-06 — Management of Confined Spaces, Version 2 Rev 0 (July 2024), part of the Sharjah Occupational Safety and Health System. It sets the minimum acceptable level; entities may go higher, not lower.
  • Trakhees (PCFC areas such as Jebel Ali Free Zone): Regulation IO-4.0 Occupational Health & Safety (PCFC-TRK-EHS-IO-REG-04, Rev. 02, June 2026) and the construction-safety guideline PCFC-TRK-CED-CS-G08 Permit to Work (March 2019). See the Trakhees section below.
  • Other free zones and the northern emirates: not verified in this review — see the notice above.

What all three documents require

  • Identify and list the confined spaces on the site, and keep the list current.
  • Sign them to warn people and prevent unauthorised entry. Abu Dhabi specifies the wording "CONFINED SPACE – PERMIT REQUIRED – DO NOT ENTER" in Arabic, English and any other language the workforce needs.
  • Avoid entry where the purpose can reasonably be achieved without it (stated expressly in the Abu Dhabi and Sharjah codes).
  • A risk assessment and a written safe system of work or procedure before entry.
  • A written permit to work before anyone enters.
  • Oxygen between 19.5% and 23.5% before entry.
  • Isolation of energy, liquids, gases and flowing materials; ventilation; reliable communication; and rescue arrangements in place before work starts.
  • Training for entrants and the people supporting the entry.

Where they differ

Summary of the published documents as reviewed on 24 November 2026. Section numbers refer to each document. Read the full text before relying on any row.
TopicAbu Dhabi (CoP 27.0)Dubai Municipality (Ch. 19)Sharjah (OSHJ-CoP-06)
Written programmeA Permit Required Confined Spaces Program listing spaces, competent entrants, competent rescue persons, equipment and calibration, and every entry (§3.5)A written safety plan for confined spaces and safe working procedures (§19.1.5)A documented, implemented and monitored safe system of work (§5.3)
Risk assessmentFor each entry, specific to the activity, time and date (§3.6)Hazard evaluation before entry, with the permit signed by the contractor's designated competent person (§19.2.1)Suitable and sufficient, covering a listed set of factors including previous contents and rescue (§5.2)
Flammable gasBelow 5% of the Lower Explosion Limit before work (§3.10(e)(vii))"Less than 10%", and 0% where welding will take place, as worded in the guide (§19.2.2)Combustible gases must be tested; the code sets no numeric limit (§5.7)
Toxic gasAssessed through the risk assessment and procedureBelow permissible exposure limits, with reference to DM technical guideline no. 12 (§19.2.2)Below the permissible exposure limit (§5.7)
Where to testNot specifiedBottom, middle and top of the space (§19.2.2)By a competent person before entry; retesting and monitoring defined in the risk assessment (§5.7)
VentilationAppropriate ventilation before work (§3.10(e)(i))Mechanical ventilation giving not less than 20 air changes per hour (§19.2.3.1)Natural or forced; never use oxygen to freshen the air (§5.8)
During the workConstant supervision and a stand-by person (§3.10(e)(ii))Continuous monitoring with alarms; evacuate if the alarm sounds; a trained attendant at the entrance who never enters; an entry supervisor (§19.2.5–19.2.7)Regular monitoring, continuous where forced ventilation is used or the work can change the atmosphere (§5.7)
CommunicationUninterrupted, intrinsically safe, reliable and frequently tested (§3.9)No separate communication section in Chapter 19; check the permit form and project procedureInside, inside-to-outside and to summon help; equipment protected against ignition where needed (§5.6)
RescueNo entry without specific rescue arrangements, including resuscitation equipment where foreseeable (§3.8)Non-entry rescue first; otherwise an equipped rescue team on call (§19.2.6, §19.2.8)Rescue personnel, rescue, firefighting and first-aid equipment, and first-aiders at each location and shift (§7)
TrainingMinimum syllabus and triggers for retraining; records with name and Emirates ID (§2.2)Entrants, attendants, supervisors and rescue members trained (§19.3)Formal training in a language and format workers understand, with periodic refreshers and drills (§6)

Abu Dhabi in practice

The Abu Dhabi code expects a standing programme, not just a permit book. The Permit Required Confined Spaces Program must be available for inspection and hold the list of spaces, the normal activities in each, competent entrants and rescue persons, equipment with calibration requirements, the entry record and a risk assessment and procedure for each space. For construction, confined space management must also appear in the pre-tender safety and health plan and the construction management plan under CoP 53.0.

Before work starts, the permit precautions include ventilation with oxygen between 19.5% and 23.5%, constant supervision and a stand-by person, isolation of the area, safe entry and exit, flammable gas below 5% of the LEL, a fire watcher where the permit specifies one, securing the space overnight and when the permit expires, and signing the permit off when the job is complete.

Dubai Municipality in practice

Chapter 19 is the most prescriptive of the three on testing and ventilation. Test at the bottom, middle and top of the space because gases settle at different heights, keep instruments running throughout with alarms, and evacuate as soon as an alarm sounds. Remove contents and lock out, tag and blank lines before work. If welding is planned, provide local mechanical ventilation and a hot work permit.

The attendant rule is explicit: a trained attendant stays at the entrance and is not authorised to enter under any circumstance. If an entrant is hurt, the attendant attempts non-entry rescue with a lifeline or retrieval system, or summons a rescue team equipped with respirators.

Sharjah in practice

OSHJ-CoP-06 puts the weight on avoiding entry, a competent risk assessor and a documented safe system of work. Atmosphere testing by a competent person must show oxygen between 19.5% and 23.5% and toxic gases below the permissible exposure limit, and the risk assessment decides when to retest — including on re-entry. Electrical isolation must be locked off, not left to a switch or fuse, and pipework isolation should not rely on a single valve; remove a section or fit a blank where possible. Petrol engines must never be used in or near the space.

Openings must be large enough for rescuers wearing breathing apparatus, practice drills are expected, warning signs with emergency instructions must be in Arabic, English and any other relevant language, and first-aiders must be appointed at each location and shift where confined space work takes place.

Trakhees in practice

Trakhees regulates health and safety in the PCFC areas, including Jebel Ali Free Zone. Its Regulation IO-4.0 defines a confined space as one with limited or restricted entry or exit, not designed for continuous occupancy — for example a chamber, tank, vat, silo, pit, trench, pipe, sewer, flue or well (§4.25.1). Confined space entry is listed with deep excavation, work at height and hot work as dangerous operations that must be controlled by a work permit procedure, with the risks evaluated before work begins (§4.25).

The employer must identify and record every activity that needs work inside a confined space (§4.25.1.1), and carry out a risk assessment specific to the activity and the location that also covers emergencies arising from the work (§4.25.1.2). A written safe working procedure must then be built from that assessment (§4.25.1.3). The regulation lists what it should cover: the permit, training and competence, supervision, communication, atmosphere testing, gas purging, ventilation, removing residues, isolating gases, liquids, machinery and electricity, equipment, gas cylinders and engines, access and exit, fire, lighting, static electricity, emergencies and rescue, limited working time, and PPE and breathing protection.

Every type of confined space entry needs a permit-to-work system. Each permit must state the date, time, activity, location and required PPE (§4.25.1.4). For welding and cutting in tanks and confined spaces, ventilation is required — preferably both extraction and supply — with another person outside as a lifeguard (§4.17.3). Paint gases are generally heavier than air, so extraction goes at the bottom of the tank (§4.17.4). Gas hoses must be checked at the start of each shift, and disconnected and vented outside the space, never removed inside it (§4.16.22–4.16.25).

On construction sites, the Trakhees permit guideline G08 says the main contractor is responsible for making sure a permit is issued for confined space entry. A permit is valid only for the day it is issued, must be signed by the area supervisor, needs a risk assessment, is displayed at the work area, and records are kept for at least six months. A cancelled permit cannot be reopened; a new one is needed.

The Trakhees documents reviewed set no numeric oxygen, flammable-gas or ventilation-rate figures for confined spaces. Do not borrow the Abu Dhabi or Dubai Municipality numbers as Trakhees requirements; confirm any figures with Trakhees and the client.

Working across emirates

  • Build the permit and procedure for the jurisdiction the site is in, not the one the template came from.
  • Where a project or client applies more than one document, meet the stricter requirement on each point.
  • Record the document, version and section the permit is based on, so an inspector can see which rules you applied.
  • For other free zones and the northern emirates, record the authority you asked and its answer before work starts.
"Awareness material, not legal advice. Requirements differ by emirate, authority, free zone and client. Confined space entry, atmosphere testing and rescue must be planned and carried out by competent persons with equipment suited to the specific space."
  1. ADOSH-SF CoP 27.0 — Confined Spaces, Version 4.0 (July 2024)
  2. ADPHC — current Code of Practices register
  3. Dubai Municipality — Safety Guide for Construction Works, Chapter 19 (official PDF)
  4. Sharjah OSHJ-CoP-06 — Management of Confined Spaces, Version 2 Rev 0 (July 2024)
  5. Sharjah Police General Command — Code of Practice and Guidelines
  6. Trakhees — Regulation IO-4.0 Occupational Health & Safety, PCFC-TRK-EHS-IO-REG-04 Rev. 02 (June 2026)
  7. Trakhees — PCFC-TRK-CED-CS-G08 Guidelines: Permit to Work (March 2019)

Continue with

  • Confined Space Entry: The Rescue Arrangement Is the Part That Fails — https://sitesafetyuae.com/resources/confined-space-entry-rescue-planning-uae
  • Confined Space Entry checklist — https://sitesafetyuae.com/site-checklists/confined-space-entry
  • Confined Space Entry (awareness module) — https://sitesafetyuae.com/training/confined-space-entry
  • Permits & High-Risk Work module — https://sitesafetyuae.com/modules/permits

Site Safety UAE builds the HSE Operations Dashboard for UAE and GCC construction projects — confined space permits, gas test records, entry logs and rescue plans in one place. Start free, no card required — https://sitesafetyuae.com/get-started.

UAE HSE Legal Guide 2026

The consolidated PDF: federal and emirate-level HSE obligations, authority responsibilities and the evidence each inspection expects. Sent to your inbox.

Get the free guide

Browse everything in the UAE HSE Compliance Hub.

For safety officers

Sign in to the safety officer portal for your daily reports, the hazards whose controls still need verifying, and the authority forms waiting on a decision.

See it in action

Site Safety UAE is a software-only platform. Watch the recorded demo to see the modules covering your project scope and authority mix.

Watch the demo
Confined SpacePermitToWorkGasTestingRescueUAE Regulations

Next step

Turn this into evidence you can hand over

Practical UAE HSE guides, worked examples and authority walkthroughs — written for people who have to produce the evidence.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.