Documentation & permits
- Current HSE plan approved and available on site
- Site-specific risk assessments signed and in date
- Method statements approved for all active activities
- Permit-to-work register up to date, no expired permits active
- Authority NOC / building permit displayed at the gate
- Emergency response plan current and posted
- Subcontractor HSE documents reviewed and approved
- Training and competency records available for all workers
- Inspection registers for plant and tools up to date
- Previous inspection findings reviewed and closed or tracked
Site access, security & traffic
- Perimeter hoarding intact with no gaps or damage
- Gate controlled with sign-in register or access cards
- Visitors inducted and issued PPE before entry
- Traffic management plan in place and followed
- Pedestrian walkways segregated from vehicles
- Banksmen present for reversing and plant movements
- Speed limit signs posted and observed
- Delivery and laydown areas marked and controlled
- Site signage in English, Arabic and relevant worker languages
- Adequate lighting for night or low-light areas
Housekeeping & welfare
- Walkways and access routes clear of materials and debris
- Waste segregated into marked skips and removed regularly
- Materials stacked safely and within height limits
- Drinking water available, cool and clean at all work areas
- Shaded rest areas provided and maintained
- Toilets clean, sufficient in number and stocked
- Hand-washing facilities with soap available
- Eating area separate from work areas and hygienic
- Changing rooms / lockers available where required
- Pest control measures in place
Heat stress & health
- Midday break observed during the summer ban period
- Heat stress index monitored and recorded
- Work-rest cycles adjusted to heat level
- Electrolytes / ORS available to workers
- Workers trained to recognise heat illness symptoms
- Buddy system applied for high-heat tasks
- Noise zones identified and hearing protection used
- Dust suppression in place for cutting and earthworks
- Occupational health surveillance records current
- Fatigue managed — working hours within legal limits
Work at height
- Scaffolds tagged and inspected within the last 7 days
- Guardrails, mid-rails and toe boards on all open edges
- Floor openings covered, secured and marked
- Harnesses inspected and anchored to rated points
- Ladders in good condition, secured and used correctly
- Mobile elevating work platforms certified and operators trained
- Rescue plan in place for work at height
- Exclusion zones below overhead work
- Tools tethered where dropped-object risk exists
- Roof and leading-edge work controlled by permit
Excavation & confined spaces
- Excavation permit issued and valid
- Underground services located and marked before digging
- Sides shored, battered or stepped per depth
- Barriers and signs around all excavations
- Safe access and egress ladders within excavations
- Spoil kept away from excavation edges
- Confined spaces identified, signed and locked
- Gas testing done and recorded before entry
- Standby person and rescue equipment present
- Excavations inspected daily and after rain
Lifting operations & plant
- Lifting plan approved for each lift
- Crane third-party certificate valid
- Lifting accessories colour-coded and in date
- Operators and riggers hold valid certificates
- Outriggers on firm, level ground with pads
- Wind speed monitored and limits respected
- Plant daily pre-use checks completed
- Reversing alarms and beacons working
- Seat belts worn in plant with ROPS
- Plant keys controlled when unattended
Electrical safety
- Distribution boards locked, labelled and IP-rated
- RCD / ELCB protection tested and recorded
- Cables routed overhead or protected, not in water
- Portable tools tested and tagged
- No damaged plugs, sockets or extension leads
- Isolation / LOTO procedures followed
- Generators earthed and fuelled safely
- Only authorised electricians working on live systems
- Temporary lighting adequate and safely installed
- Overhead power lines identified with clearance controls
Fire & emergency
- Fire extinguishers present, accessible and inspected
- Hot work permits and fire watch in place
- Flammables stored in approved cabinets away from ignition
- Emergency exits and routes clear and signed
- Assembly points marked and communicated
- Fire drill conducted within the required interval
- First aid kits stocked and first aiders on each shift
- Emergency contact numbers posted
- Eyewash / safety shower available where chemicals used
- Smoking restricted to designated areas
PPE, chemicals & environment
- All workers wearing hard hats, boots and hi-vis
- Task-specific PPE (gloves, goggles, masks) used
- PPE stock available and damaged PPE replaced
- Chemical inventory and SDS available on site
- Chemicals labelled and stored with secondary containment
- COSHH assessments available for hazardous substances
- Spill kits available and staff trained
- No discharge of contaminated water to drains
- Dust, noise and light nuisance to neighbours controlled
- Toolbox talk delivered and attendance recorded this week
Want these as fillable checklists with photo proof? Browse the checklist library.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.