UAE construction HSE compliance checklists
33 free printable HSE compliance checklists with 2926 checkpoints covering what the authorities look for and what a construction site needs day to day — from welfare and drinking water to working at height, excavation, lifting, fire, plant and the environment. Open one, print it, take it on the walk.
Aligned with MOHRE, ADOSH-SF (formerly OSHAD), Dubai Municipality, Civil Defence, EAD and Trakhees publications — not certified by any authority.
Detailed inspection checklists
Longer point-by-point inspections with saved progress, a branded PDF export and severity ratings.
- Site electrical inspection checklistEarthing and bonding, isolation and LOTO, distribution boards, RCDs, generators, cabling, site offices and welfare power.DoE EWR 2020 · ADOSH-SF CoP 15.0 · Dubai Building Code · BS 4363 · IEC 60364
- Working at height inspection checklistPermits and rescue planning, scaffolds and towers, ladders, edge protection and openings, fall arrest and PPE, MEWPs and suspended access.ADOSH-SF CoP 23.0 / 26.0 / 37.0 · Dubai Municipality CoCSP · BS EN 12811/131/361/795
Authority packs
- MOHRE midday break and heat stressDaily summer check against the MOHRE midday break decision: work stopped 12:30–15:00, shade, cool water, rehydration salts and a heat-illness response.85 checkpoints · Daily, 15 June – 15 September · MOHRE, ADOSH-SF
- MOHRE labour accommodation inspectionCamp walk against Ministerial Resolution 44 of 2022: room occupancy and floor area, sanitation ratios, kitchens, potable water, fire safety and welfare records.86 checkpoints · Monthly, plus before any authority visit · MOHRE, Civil Defence
- ADOSH-SF (formerly OSHAD) site compliance walkAbu Dhabi entity walk against the ADOSH-SF System Framework: management elements, risk assessment, heat stress, height, PPE, signage and reporting.86 checkpoints · Monthly · ADOSH-SF
- Dubai Municipality construction safety inspectionDubai site walk against the Code of Construction Safety Practice: HSE plan and officer ratio, hoarding, height and scaffold, excavation, lifting, power and statistics.85 checkpoints · Monthly · Dubai Municipality, Civil Defence
- Civil Defence fire precautions on a construction siteFire and life safety walk against the UAE Fire and Life Safety Code of Practice: firefighting provision, hot work, flammable storage, escape and drills.85 checkpoints · Monthly, plus before any hot work campaign · Civil Defence
- EAD dust and environmental controlsAbu Dhabi environmental walk against the CEMP requirements: PM10 monitoring against 150 µg/m³, dust suppression, wheel wash, spill control and waste manifests.85 checkpoints · Weekly · EAD
- Trakhees EHS site inspectionTrakhees-jurisdiction walk: registered officers, permit regime, height and confined space controls, equipment colour coding, welfare ratios and reporting.85 checkpoints · Monthly · Trakhees
Site set-up & welfare
- Site set-up and mobilisationEverything that must exist before the first work front opens: approvals, boundary, utilities, logistics and emergency arrangements.82 checkpoints · Once at mobilisation, then reviewed at each phase change · MOHRE, Local municipality, Civil Defence
- Site welfare, sanitation and drinking waterWeekly welfare walk covering toilets, washing, rest and eating areas, drinking water and prayer facilities.84 checkpoints · Weekly · MOHRE, Local municipality
- Induction, training and competencyVerifies every person on site has been inducted, is competent for their task and that high-risk roles hold valid third-party cards.83 checkpoints · Weekly, and on every new crew arrival · MOHRE, ADOSH-SF, Trakhees
- PPE issue, condition and useChecks PPE is issued, recorded, fit for the hazard, in condition and actually being worn.86 checkpoints · Weekly · MOHRE, ADOSH-SF
High-risk activities
- Working at height and edge protectionHeight walk covering access, edge protection, openings, fall arrest, rescue and dropped objects.88 checkpoints · Daily on any height work front · Dubai Municipality, ADOSH-SF, Trakhees
- Scaffolding and temporary accessWeekly scaffold inspection covering foundation, tie-in, platforms, tagging and modifications.84 checkpoints · Weekly and before reuse after wind, rain or any alteration · Dubai Municipality, Trakhees
- Excavation, shoring and utility strike preventionDaily excavation check covering services, support, access, edge loading, water, atmosphere and public protection.87 checkpoints · Daily while the excavation is open · Dubai Municipality, ADOSH-SF
- Lifting operations and cranesLift-day check covering the lift plan, appointed persons, certification, gear, ground conditions and exclusion zones.81 checkpoints · Every lift day; full review for each critical lift · Dubai Municipality, Trakhees, ADOSH-SF
- Confined space entryEntry-day check covering permits, isolation, gas testing, ventilation, attendants, communication and rescue.88 checkpoints · Every entry · Trakhees, ADOSH-SF
- Permit to work auditAudit of the permit system itself: issue, display, cross-checks, suspension, handback and register accuracy.97 checkpoints · Weekly · ADOSH-SF, Trakhees
- Demolition and strip-outPre-start and daily checks for demolition: survey, isolation, structural sequence, exclusion, dust and waste.97 checkpoints · Daily during demolition · Dubai Municipality, EAD, Civil Defence
- Temporary works, formwork and falseworkVerifies temporary works are designed, checked, loaded and struck under control.97 checkpoints · Before each pour and weekly · Dubai Municipality, ADOSH-SF
Plant, power & fire
- Plant, vehicles and site traffic managementTraffic and plant walk covering routes, segregation, reversing, operator competence and daily inspections.97 checkpoints · Weekly, and on every logistics change · Dubai Municipality, ADOSH-SF
- MEWPs, forklifts and telehandlersPre-use checks for mobile elevating work platforms and materials-handling plant, including rescue from height.84 checkpoints · Before each shift · Dubai Municipality, Trakhees
- Temporary electrical installations and toolsElectrical safety walk covering distribution, RCDs, cables, generators, portable tools and isolation.87 checkpoints · Weekly · Dubai Municipality, ADOSH-SF
- Fire prevention and hot workDaily hot work and fire prevention check for a construction site, including cylinders, watch periods and escape.88 checkpoints · Daily where hot work is running · Civil Defence, Dubai Municipality
- Hazardous substances, SDS and silica dustChemical and dust controls: register, SDS, labelling, storage, exposure control and health surveillance.87 checkpoints · Monthly, and on every new substance · ADOSH-SF, EAD, Civil Defence
- Fuel storage and refuellingDiesel tanks, bowsers, drums and generator day tanks: siting, 110% bunding, dispensing rules, fire protection, spill response and the records inspectors ask for.97 checkpoints · Weekly, plus daily visual checks during operations · Civil Defence, EAD, ADOSH-SF, Dubai Municipality, Trakhees
Management & environment
- Emergency preparedness and first aidTests that the site can actually respond: alarm, muster, roll call, first aid, medical route and drills.87 checkpoints · Monthly, plus after every drill · Civil Defence, ADOSH-SF, MOHRE
- Housekeeping, materials and wasteThe walk that prevents most slips, trips, fires and dropped objects: access, storage, waste and cleanliness.87 checkpoints · Daily · Dubai Municipality, EAD
- Environmental controls: dust, noise, water and spillsSite environmental walk usable in any Emirate, covering dust, noise, water, spills, wildlife and complaints.87 checkpoints · Weekly · EAD, Dubai Municipality, Local municipality
- Night work, shift handover and lone workingChecks for night shifts: approvals, lighting, supervision, fatigue, communication and handover.87 checkpoints · Every night shift · Local municipality, MOHRE, ADOSH-SF
- Monthly HSE management system auditOffice-side audit closing the loop: legal register, risk assessments, inspections, incidents, actions and review.87 checkpoints · Monthly · ADOSH-SF, ISO 45001, Dubai Municipality
- Master site inspection — 100 pointsFull-site HSE inspection covering every area a consultant or client audit expects to see.100 checkpoints · Weekly · Dubai Municipality, ADOSH-SF, MOHRE, Civil Defence
- Master hazard identification & review — 100 pointsStructured hazard review so no hazard category is left unassessed on a site.100 checkpoints · Monthly and on change · Dubai Municipality, ADOSH-SF, MOHRE
- Master corrective action close-out — 100 pointsTrack every corrective action from finding to verified close-out with evidence.100 checkpoints · Per finding / weekly review · Dubai Municipality, ADOSH-SF, ISO 45001-aligned
How to use these UAE construction HSE compliance checklists
- Pick the checklist for the activity or area — scaffolding, excavation, lifting, hot work, welfare and more.
- Print it or fill it in on a phone, tick each item and note the location and inspector.
- Raise a corrective action for anything that fails, with an owner and a due date.
- Keep the completed checklist as your record for client, consultant and authority audits.
Which UAE rules these checklists are built around
- Abu Dhabi: the ADOSH-SF Codes of Practice (formerly OSHAD-SF) — inspectors audit scaffolding, excavation, lifting, work at height and welfare against them.
- Dubai: the Dubai Municipality Code of Construction Safety Practice (2026 edition) and Decree No. 19 of 2025 on safety in construction works, with Trakhees EHS rules in PCFC areas and DDA rules in Dubai Development Authority zones.
- Sharjah and the Northern Emirates: municipal building-permit safety conditions, plus free-zone rules such as RAKEZ HS&E.
- Everywhere: MOHRE labour rules, including the summer midday work break (no outdoor work in the sun 12:30–15:00, 15 June to 15 September, with shade, cooling, drinking water and first aid provided) and worker accommodation standards.
What UAE auditors look for most often
- Scaffold tags that match the last inspection date — a green tag with an out-of-date inspection counts as a failure.
- Excavations with no shoring or battering to the approved method statement, or no daily inspection record.
- Lifting gear without a current third-party certificate and a lift plan signed off for the day.
- Hot work carried out without a live permit, fire watch and extinguisher at the point of work.
- Heat stress controls in summer: shaded rest areas, cool drinking water and a record of the midday break.
- Workers on site whose safety induction or trade card has expired.
Why these checks matter: real UAE cases
- Abu Dhabi, 2025: a worker fell from a 7 m scaffold with no adequate protective equipment or supervision and was paralysed — AED 1.5 million compensation, upheld by the Court of Cassation (Gulf News). A daily scaffold and work-at-height checklist is the record that shows these were in place.
- Sharjah, 2025: a worker fell to his death from a scaffold with no helmet, no safety line and no supervisor on site (Emarat Al Youm). PPE and supervision are the first lines on every checklist here.
- Abu Dhabi: a company was fined AED 35,000 and ordered to pay AED 200,000 after an electrician fell to his death on a site with no safety barriers or safety equipment (Gulf News via BHRRC). Edge protection and barriers are checked in the work-at-height list.
Checklists as part of a UAE construction safety plan
These checklists are the inspection records behind a UAE construction safety plan: the plan sets the rules, the checklists show they were followed. MOHRE regulations apply to every emirate, including the summer midday break (12:30–15:00, 15 June to 15 September). Dubai sites should also follow Decree No. 19 of 2025 on safety in construction works; Abu Dhabi sites follow ADOSH-SF. Official sources are listed below.
Official HSE references
- MOHRE — Midday break (15 June to 15 September, 12:30–15:00)
- ADOSH-SF Mechanism 11.0 — Incident Notification, Investigation and Reporting (v4.0, July 2024)
- Dubai Decree No. 19 of 2025 — Safety in Construction Work
- Dubai Municipality — Code of Construction Safety Practice
Always confirm the current version with the authority before relying on it.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.