Ras Al Khaimah Construction HSE checklist

Tasks recorded on this site for Ras Al Khaimah. Tick them off interactively, or print or save as PDF.

Interactive checklistConstruction HSEWorker welfareFire safetyEnvironment

RAKEZ HSE Construction Regulation 2023

  • Construction stage approvals required before each phase commences
  • NOC required for night work from RAKEZ HSE Department
  • HS&E Plan mandatory — risk assessment, reduction, communication, review
  • Permit-to-Work system: hot work, cold work, excavation, confined space, WAH
  • Incident reporting mandatory — near misses, injuries, dangerous occurrences
  • Emergency management plan with muster points and evacuation procedures

Lifting Operations (ENAS/BS 7121)

  • All lifting equipment must be inspected to ENAS ETR 06 / BS 7121 standards
  • Thorough examination by competent person every 12 months (6 months for accessories)
  • Lift plan required for all complex lifts
  • Crane operator competency certificate required
  • Exclusion zones mandatory during all lifting operations

Environmental Controls (EPDA)

  • Annual environmental licence required from EPDA for industrial employers
  • Industrial/domestic wastewater must be segregated
  • No direct discharge to sea without EPDA permit
  • Industrial soakaways prohibited — dewatering permits required from EPDA/PSD
  • No open burning — Cabinet Decree No. 12 of 2006
  • Hazardous materials: import, storage, handling, disposal per EPDA controls

General reference only, not legal advice. Confirm current authority, client and consultant requirements before relying on this list. Where more than one code applies, follow the strongest applicable code (the most protective requirement) and check the current official text.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.