Choose the emirate, your role and the activities on site. The plan fills in the hazards and controls, the permits those activities need, and the documents the authority expects — each traced back to the UAE Construction Evidence Matrix.
5 hazards from the selected activities. Untick any that do not apply.
Plant and traffic: Struck by plant, crushing between plant and structure, reversing incidents
Mobile plant working alongside people
Segregated pedestrian routes with physical barriers; one-way traffic management plan; trained banksman for reversing; reversing alarms and cameras; high-visibility clothing; site speed limit enforced; daily plant pre-use checks.
Who may be harmed: Operatives on foot, plant operators, visitors · Engineering control · Vehicle & Machinery permit · Initial risk 20 → residual 8
Manual handling: Musculoskeletal injury, crush and trap injuries to hands and feet
Moving materials by hand
Mechanical handling aids (trolleys, pallet trucks, vacuum lifters) provided; loads split and weights marked; team lifts for awkward loads; manual handling training; gloves and safety boots issued.
Who may be harmed: Operatives handling materials · Engineering control · No permit required · Initial risk 8 → residual 4
Health hazards: Noise-induced hearing loss and respirable crystalline silica dust
Cutting, breaking or grinding materials
On-tool water suppression or dust extraction; low-noise equipment; exclusion of other trades from the area; hearing protection to the correct SNR; FFP3 RPE with face-fit testing; health surveillance for exposed workers.
Who may be harmed: Operators, nearby trades · Engineering control · No permit required · Initial risk 12 → residual 4
Interfaces: Uncontrolled interface — one trade's work creates a hazard for another
Simultaneous operations with other contractors
SIMOPS matrix agreed at the daily coordination meeting; permits cross-referenced and de-conflicted; physical segregation or time separation of conflicting activities; single point of coordination named.
Who may be harmed: All trades in the area · Administrative control · No permit required · Initial risk 12 → residual 6
Emergency preparedness: Delayed or disorganised response to injury, fire or rescue
Emergency during the works
Emergency numbers, assembly point and nearest hospital stated in the MSRA and briefed; trained first aiders and stocked first aid kit; fire points and evacuation route kept clear; rescue plan for height and confined space work; drill completed.
Who may be harmed: Everyone on site · Administrative control · No permit required · Initial risk 10 → residual 4
We separate law, authority framework requirements, published codes and industry good practice, and link to the authority source so you can verify every statement yourself. This page is general guidance for UAE construction teams and is not legal advice.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.