Free MSRA template pack — method statement, 5×5 risk scoring and review checklist

A ready-to-edit Method Statement & Risk Assessment pack written for UAE construction sites. Every field is a worked example you replace with your own site, method and emirate details — covering MOHRE, ADOSH-SF (formerly OSHAD), Dubai Municipality, Trakhees and Civil Defence requirements. Download everything below as PDF, Word or CSV; no sign-up needed.

Download the full pack

PDFs open cleanly in Adobe Acrobat and other readers. Word and CSV files are editable in Microsoft Office, Google Docs and Excel.

What's in the method statement form

Ten sections, each with guidance and a pre-filled worked example.

  1. 1. Document control

    Every controlled MSRA needs a unique reference, revision number and named approver before work starts.

  2. 2. Scope of works

    Describe exactly what is covered, and state clearly what is NOT covered.

  3. 3. Legal and standard references

    Cite the authority documents that actually apply to the emirate you are working in.

  4. 4. Roles and responsibilities

    Name a person for each duty — not just a job title with nobody behind it.

  5. 5. Plant, equipment, materials and PPE

    List certification and inspection requirements next to each item.

  6. 6. Sequence of works (step by step)

    One row per step: activity, the hazards created by that step, and the controls that remove or reduce them.

  7. 7. Risk assessment register

    Score each hazard before controls (initial) and after controls (residual) using the 5x5 matrix. Anything residual 15 or above must not proceed.

  8. 8. Emergency arrangements

    Cover rescue as well as evacuation — a harness rescue plan is required for work at height.

  9. 9. Training, briefing, monitoring and review

    Prove the team understood the MSRA — a signature sheet in the language they speak.

  10. 10. Approval and briefing sign-off

    No work starts until all three approval signatures and the operative register are complete.

How the 5×5 risk scoring works

Score each hazard before controls (initial) and again after controls (residual): severity × likelihood. Anything residual 15 or above must not proceed.

Severity scale

  • 1Negligible: No injury or minor discomfort, no lost time
  • 2Minor: First aid case, back to work same shift
  • 3Moderate: Medical treatment or lost-time injury, reportable
  • 4Major: Serious injury, permanent disability, major property loss
  • 5Catastrophic: Fatality or multiple serious injuries

Likelihood scale

  • 1Rare: Very unlikely, not known to have happened
  • 2Unlikely: Could happen but not expected
  • 3Possible: Might happen at some time on this site
  • 4Likely: Will probably happen during the works
  • 5Almost certain: Expected to happen, or happens regularly
Risk score action bands
ScoreBandRequired action
14LowAcceptable — monitor and maintain controls
59MediumAdditional controls where reasonably practicable; supervisor monitors
1014HighDo not start until controls reduce the score; HSE Manager approval required
1525ExtremeStop / do not proceed. Redesign the method and re-assess

Example risk register included

The CSV ships with 5 scored UAE examples — working at height, crane lifts, silica dust, summer heat stress and manual handling — under 14 columns covering hazard, people at risk, initial and residual scores, controls, owner and target date.

The 30-point MSRA review checklist

Use it before any MSRA is issued — grouped by document control, scope, legal references, roles, resources, method, risk assessment, emergency, briefing, permits and monitoring.

  • Document control
    Unique document reference and revision number shown on every page
  • Document control
    Prepared, reviewed and approved by named, competent people with dates
  • Document control
    Review date and trigger for re-assessment stated
  • Scope
    Scope describes the actual activity, location and working hours
  • Scope
    Exclusions stated (hot work, confined space, night work, lifting over live areas)
  • Scope
    Interfaces with other contractors (SIMOPS) identified
  • Legal
    Correct emirate authority referenced (MOHRE, ADOSH-SF, DM, Trakhees, Civil Defence)
  • Legal
    Midday break rule addressed for summer works

…plus 22 more points in the PDF and CSV downloads.

Next steps

Template only — edit every field for your own site, method and emirate. Site Safety UAE is not an authority and this pack does not replace approval by the client, consultant or the relevant UAE authority.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.