UAE HSE publications, by authority
The actual laws, codes of practice and standards a UAE construction site is audited against — with the evidence each one expects you to produce. Aligned with these frameworks; not certified by any authority.
Last reviewed 2026-09-05
Showing 23 publications
- Federal / CabinetLaw or decree2021, in force 2 February 2022
Regulation of Employment Relations (UAE Labour Law)
Federal Decree-Law No. 33 of 2021
Every private-sector employer in the UAE, including contractors and labour-supply subcontractors.
Evidence an inspector asks for
- Written employment contracts registered with MOHRE for every worker on site
- Working-hours, overtime and rest-day records
- Employer-funded accommodation, transport and medical arrangements where contracted
- Occupational safety obligations under the law reflected in the site HSE plan
Official source: mohre.gov.ae
- Federal / CabinetRegulation2022
Implementing Regulation of the UAE Labour Law
Cabinet Resolution No. 1 of 2022
Detailed rules behind Decree-Law 33/2021 — work models, wage protection, occupational safety duties.
Evidence an inspector asks for
- Wage Protection System (WPS) submissions for the payroll covering site workers
- Records of the safety measures the employer is required to provide free of charge
- Occupational injury and illness notification records
Official source: mohre.gov.ae
- MOHREMinisterial resolutionReissued each year; 12:30–15:00 outdoor work ban
Prohibition of work under the sun, 15 June – 15 September
MOHRE Midday Break Decision (annual)
All open-air and unshaded work between 15 June and 15 September inclusive.
Evidence an inspector asks for
- Midday-break notice displayed in Arabic, English and workers' languages
- Shaded rest area with cooling, seating and drinking water
- Attendance/biometric records showing no outdoor work 12:30–15:00
- Cool water, electrolytes and heat-stress awareness records
- Exemption evidence where continuous-work exemptions apply (e.g. utility emergency works)
Official source: mohre.gov.ae
- MOHREMinisterial resolution2022
Workers' accommodation standards and general services
MOHRE Ministerial Resolution No. 44 of 2022
Employers housing workers in labour accommodation, including contractor-run camps.
Evidence an inspector asks for
- Occupancy per room and floor-area records against the resolution's minima
- Sanitary facility ratios, kitchen and laundry provision
- Fire safety, evacuation drills and first-aid provision in the camp
- Potable water testing, pest control and waste-removal contracts
- Camp boss appointment and welfare complaint log
Official source: mohre.gov.ae
- MOCCAELaw or decree1999, as amended
Protection and Development of the Environment
Federal Law No. 24 of 1999
Discharges to air, land and water; hazardous substances and waste handling nationwide.
Evidence an inspector asks for
- Environmental permits and NOCs for the activity
- Hazardous waste manifests and licensed-carrier records
- Discharge consent monitoring results
- Spill response plan and incident reports
Official source: moccae.gov.ae
- MOCCAELaw or decreeIn force from 30 May 2025
Reduction of Climate Change Effects
Federal Decree-Law No. 11 of 2024
Entities operating in the UAE that emit greenhouse gases, including large construction operations.
Evidence an inspector asks for
- Greenhouse gas inventory for the reporting period
- Emission reduction plan and adaptation measures
- Records submitted through the competent authority's reporting channel
Official source: moccae.gov.ae
- ADOSH-SFRegulationVersion 4.1
Abu Dhabi Occupational Safety and Health System Framework
ADOSH-SF (formerly OSHAD-SF) System Framework
Every entity and contractor operating in the Emirate of Abu Dhabi under a sector regulatory authority.
Evidence an inspector asks for
- Registered OSHMS with documented Elements 1–11
- Competent OSH practitioner registered at the required tier
- Risk register and Codes of Practice applied to the site's activities
- Quarterly and annual performance reporting to the sector authority
- Internal audit and management review records
Official source: adosh.gov.ae
- ADOSH-SFCode of practiceCurrent edition under SF v4.1
Electrical Safety
ADOSH-SF CoP 15.0
Temporary site power, energised work, isolation and lock-out on Abu Dhabi sites.
Evidence an inspector asks for
- Authorised person appointments and competency evidence
- Lock-out/tag-out register and permit records
- RCD test records with measured trip times
- Distribution board inspection and thermography records
Official source: adosh.gov.ae
- ADOSH-SFCode of practiceCurrent edition under SF v4.1
Safety Signage and Signals
ADOSH-SF CoP 11.0
All site signage, barricading and traffic signalling in Abu Dhabi.
Evidence an inspector asks for
- Bilingual signage plan matched to the site layout
- Signage inspection register with condition and replacement records
Official source: adosh.gov.ae
- ADOSH-SFCode of practiceCurrent edition; annual Safety in Heat campaign
Heat stress management in Abu Dhabi
ADOSH-SF CoP 53 / Safety in Heat programme
Outdoor and hot indoor work throughout the Abu Dhabi summer regime.
Evidence an inspector asks for
- Thermal work-limit or WBGT monitoring records
- Work/rest cycles applied and recorded by activity
- Cool water, shade and electrolyte provision evidence
- Heat illness first-aid response and case records
- Worker heat-awareness briefing register
Official source: adosh.gov.ae
- EADGuidelineCurrent edition
Construction dust, PM10 and air-quality controls
EAD Environmental Permitting & Air Quality requirements
Construction, demolition and earthworks in the Emirate of Abu Dhabi.
Evidence an inspector asks for
- Boundary PM10 monitoring data with exceedance triggers and actions
- Dust suppression schedule (bowsers, wheel wash, sheeting, windbreaks)
- Community complaint log and closure records
- Construction Environmental Management Plan approved by EAD
Official source: ead.gov.ae
- Federal / CabinetRegulation2020
Electricity Wiring Regulations for Abu Dhabi
Abu Dhabi DoE Electricity Wiring Regulations (EWR) 2020
Temporary and permanent electrical installations connected in Abu Dhabi.
Evidence an inspector asks for
- Energisation certificates for each temporary supply
- Inspection and test certificates by a registered contractor
- Earthing and bonding test results
Official source: doe.gov.ae
- Dubai MunicipalityCode of practiceCurrent edition
Code of Construction Safety Practice
Dubai Municipality Code of Construction Safety Practice
Building and civil construction sites within Dubai Municipality jurisdiction.
Evidence an inspector asks for
- Approved construction HSE plan and site organisation chart
- Safety officer appointment at the required ratio to workforce
- Scaffolding, excavation and lifting control records
- Monthly safety statistics submitted to the municipality
- Accident notification within the required timeframe
Official source: dm.gov.ae
- Dubai MunicipalityRegulation2021 edition
Dubai Building Code (technical requirements for buildings in Dubai)
Dubai Building Code
Design and construction of buildings in the Emirate of Dubai.
Evidence an inspector asks for
- Design compliance statements against the applicable code chapters
- Site records demonstrating as-built conformity
Official source: dm.gov.ae
- Dubai MunicipalityRegulationCurrent edition
Al Sa'fat green building regulations and specifications
Al Sa'fat Dubai Green Building Evaluation System
New buildings in Dubai, rated Bronze to Platinum sa'fa.
Evidence an inspector asks for
- Al Sa'fat compliance checklist submitted with the building permit
- Construction waste diversion records
- Water and energy efficiency substantiation
Official source: dm.gov.ae
- Dubai Civil DefenceCode of practice2018 edition with subsequent circulars
UAE Fire and Life Safety Code of Practice
UAE Fire and Life Safety Code of Practice
Fire protection design, site fire precautions, hot work and impairment across the UAE, enforced in Dubai by DCD.
Evidence an inspector asks for
- Fire and life safety design approval and inspection sign-offs
- Site fire plan: extinguishers, hydrants, standpipe rising with the structure
- Hot work permit system with fire watch and 30-minute post-work monitoring
- Impairment notice and compensatory measures when protection is out of service
- Evacuation drill records and assembly point control
Official source: dcd.gov.ae
- TrakheesRegulationCurrent edition
Trakhees (Ports, Customs & Free Zone Corporation) EHS management system
Trakhees EHS Regulations and Technical Guidelines
Projects inside Trakhees jurisdiction — Palm Jumeirah, Jebel Ali, Dubai World Central and related areas.
Evidence an inspector asks for
- Trakhees-registered EHS officer and approved EHS plan
- Contractor classification and pre-qualification records
- Monthly EHS statistics and inspection close-out
- Permit-to-work regime matching the Trakhees technical guidelines
Official source: trakhees.ae
- International standardStandard2018
Occupational health and safety management systems — Requirements
ISO 45001:2018
Contractual OHS management system requirements; the backbone of most UAE client HSE specifications.
Evidence an inspector asks for
- Context, interested parties and OHS objectives
- Hazard identification, risk and opportunity assessment
- Worker consultation and participation records
- Internal audit programme, management review and continual improvement
Official source: iso.org
- International standardStandard2015
Environmental management systems — Requirements
ISO 14001:2015
Environmental management systems required by most UAE clients and authorities.
Evidence an inspector asks for
- Aspects and impacts register
- Compliance obligations register with legal register updates
- Environmental monitoring and non-conformance records
Official source: iso.org
- International standardStandard2015
Quality management systems — Requirements
ISO 9001:2015
Integrated management systems where HSE documentation shares document control.
Evidence an inspector asks for
- Document and record control
- Nonconformity and corrective action records
Official source: iso.org
- MOIATRegulationCurrent edition
Emirates Conformity Assessment Scheme (ECAS) and related standards
MOIAT / ESMA conformity and product-safety schemes
PPE, lifting gear, electrical equipment and construction products placed on the UAE market.
Evidence an inspector asks for
- ECAS/EQM certificates for PPE and safety-critical products
- Supplier declarations and traceable batch records
Official source: moiat.gov.ae
- International standardStandardCurrent edition
Low-voltage assemblies for construction sites (ACS)
BS EN 61439-4
Site distribution boards and temporary supply assemblies.
Evidence an inspector asks for
- ACS-rated board certificates
- Board register with inspection dates
Official source: bsigroup.com
- International standardStandardCurrent edition
Code of practice for safe use of cranes
BS 7121 series
Crane operations, lift planning and appointed-person duties on UAE sites.
Evidence an inspector asks for
- Lift plans signed by the appointed person
- Third-party crane and gear certification in date
- Operator, slinger and signaller competency cards
Official source: bsigroup.com
Next step
Turn this into evidence you can hand over
Practical UAE HSE guides, worked examples and authority walkthroughs — written for people who have to produce the evidence.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.