Part L — Registers & Records

Scaffold Inspection Checklist

Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update on legal, authority, project or client change
Checkpoints
87

Writing or reviewing the risk assessment behind this checklist? Read the MSRA meaning in safety — Method Statement Risk Assessment guide for the full definition, UAE regulations, roles and scoring method.

Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Erection Sequence ControlErection sequence follows step-by-step method statement lift-by-lift without skipping bracing stagesErection sequence log signed off per lift completedScaffold SupervisorDuring erection
2Erection Sequence ControlPartially erected scaffold left overnight is secured and stabilized against unauthorized useEnd-of-shift stabilization check recordedScaffold SupervisorDaily during erection
3Scaffold Type Specific - Tube & FittingTube and fitting scaffold couplers checked for correct torque using calibrated torque wrenchTorque wrench calibration certificate and sample readings loggedScaffold InspectorWeekly
4Scaffold Type Specific - System ScaffoldSystem scaffold (cuplock/kwikstage) locking pins/wedges fully engaged at every node pointNode point sample check confirms full engagementScaffold InspectorWeekly
5Scaffold Type Specific - Mobile TowerMobile tower scaffold outriggers deployed and locked when height-to-base ratio requires stabilizationOutrigger deployment verified against manufacturer height chartScaffold InspectorBefore each use
6Scaffold Type Specific - Suspended ScaffoldSuspended/swing stage scaffold wire ropes, hoists and counterweights inspected and load-tested before useLoad test certificate and wire rope inspection recordScaffold InspectorBefore use and monthly
7Scaffold Type Specific - Cantilever/BracketCantilever or bracket scaffold anchorage into structure verified by engineer for load capacityEngineer sign-off on bracket anchorage design and installationSite EngineerBefore erection
8Proximity HazardsScaffold erected near overhead power lines maintains statutory safe clearance distanceClearance distance measured and documented against DEWA/utility regulationsHSE OfficerBefore erection
9Proximity HazardsScaffold adjacent to public roadway/walkway fitted with fan/hoarding to protect pedestriansProtective fan/hoarding installation inspected and signed offSite SupervisorBefore erection
10Proximity HazardsScaffold near excavation maintains stable setback distance from excavation edge per geotechnical adviceSetback distance verified against excavation support drawingSite EngineerBefore erection
11Material Handling on ScaffoldMaterial hoist/gin wheel attachment point independently rated and not attached to working platform structureHoist attachment design verified separate from scaffold structureSite EngineerBefore use
12Material Handling on ScaffoldMaterials raised/lowered on scaffold via designated loading bay only, not thrown or droppedLoading bay location signed and used per observationSite SupervisorDaily
13Public & Third-Party ProtectionScaffold sheeting/debris netting inspected for wear from wind/UV exposure over extended project durationNetting condition assessed against degradation checklistScaffold InspectorMonthly
14Public & Third-Party ProtectionWarning lights/beacons installed on scaffold sections adjacent to vehicular traffic routes at nightBeacon function check confirmed operational after duskSite SupervisorDaily during night works
15Independent Scaffold SectionsIndependent scaffold (not tied to structure) has adequate base width-to-height ratio or additional ties/outriggersStability calculation or outrigger provision verified against heightSite EngineerBefore erection
16Birdcage & Internal ScaffoldBirdcage scaffold internal bracing provides stability in all directions without external tie relianceInternal bracing pattern matches design for enclosed scaffold typeScaffold InspectorWeekly
17Scaffold Modification ControlAny request to remove/alter scaffold components routed through permit-to-modify processScaffold modification permit signed by scaffold supervisor and engineer if structuralScaffold SupervisorPer modification request
18Scaffold Modification ControlUnauthorized modifications discovered during inspection immediately reported and rectifiedIncident/observation report with rectification confirmationScaffold InspectorAs discovered
19Tag System DetailScaffold tag holder legible, weatherproof and positioned at eye level at each access pointTag holder condition and placement checked during walk-roundScaffold SupervisorWeekly
20Tag System DetailScaffold tag reflects current inspector name, date of inspection and next due date without alterationTag entries compared against master inspection register for consistencyHSE ManagerWeekly
21Statutory & Regulatory ComplianceScaffold erection notified to relevant municipality/authority where required by local regulationNotification/permit copy retained on site fileHSE ManagerBefore erection
22Statutory & Regulatory ComplianceScaffold complies with OSHAD/Dubai Municipality temporary structure requirements applicable to emirateCompliance checklist cross-referenced to local authority codeHSE ManagerBefore erection
23Interface with Other TradesScaffold access coordinated with concurrent works (e.g., crane lifts, façade works) to avoid conflictInterface coordination meeting minutes documenting scaffold access windowsSite SupervisorWeekly
24Interface with Other TradesScaffold platform kept clear of unrelated trade materials not authorized for that work areaHousekeeping check confirms only authorized materials presentSite SupervisorDaily
25Scaffold at Height - Additional ControlsScaffold above 6m fitted with additional intermediate tie level per design requirementTie level spacing verified against height-based design tableScaffold InspectorWeekly
26Scaffold at Height - Additional ControlsAnemometer or wind monitoring device installed for scaffolds above defined height thresholdWind speed data log reviewed against suspension thresholdSite SupervisorDaily
27Emergency PreparednessEmergency evacuation route from elevated scaffold platform identified and kept clearEvacuation route signage and clearance verifiedHSE OfficerWeekly
28Emergency PreparednessFirst aid and rescue arrangements available for personnel working at scaffold heightRescue plan specific to scaffold work posted at siteHSE ManagerBefore work commencement
29Photographic EvidencePhotographic record taken at each formal inspection showing overall scaffold condition and key detailsPhoto log attached to inspection register entryScaffold InspectorWeekly
30Photographic EvidenceBefore/after photos retained for any scaffold alteration or repairPhoto comparison filed with modification permitScaffold SupervisorPer modification
31Training & Toolbox TalksToolbox talk delivered to all scaffold users on safe use, load limits and reporting defectsToolbox talk attendance register with topic and dateSite SupervisorMonthly
32Training & Toolbox TalksScaffold inspectors hold current CISRS (or equivalent) inspection qualificationQualification certificate verified and renewal date trackedHSE ManagerOn appointment and renewal
33Subcontractor Scaffold ControlSubcontractor-erected scaffold subject to same inspection regime as main contractor scaffoldSubcontractor scaffold register reviewed during site auditHSE ManagerWeekly
34Subcontractor Scaffold ControlScaffold handover between erecting contractor and using trades documented with joint walk-downJoint handover checklist signed by both partiesScaffold SupervisorOn handover
35Weather-Specific Additional ChecksScaffold inspected for ice/frost hazard on platforms and ladders in cold conditionsCold weather inspection checklist completed where applicableScaffold InspectorAs required in cold weather
36Weather-Specific Additional ChecksScaffold checked for sand/dust accumulation on platforms affecting footing traction in desert conditionsPlatform cleaning log confirms sand removal after dust eventsSite SupervisorAfter sandstorm event
37Load Test & VerificationLoading class capacity verified by sample load calculation matching maximum anticipated material storageLoad calculation cross-checked against site material delivery planSite EngineerBefore heavy loading activity
38Load Test & VerificationConcentrated point loads (e.g., stacked block pallets) assessed separately from uniform load ratingPoint load assessment documented for specific heavy itemsSite EngineerBefore placing point loads
39Non-Conformance & EscalationCritical scaffold non-conformance (structural instability) triggers immediate stop-work and evacuationStop-work notice issued and area evacuated with log entryHSE ManagerImmediate on discovery
40Non-Conformance & EscalationRecurring non-conformances trigger review of scaffolding contractor's competency and retrainingContractor performance review record with corrective action planHSE ManagerAs trend identified
41Digital Inspection RecordsScaffold inspection conducted using digital checklist app with GPS/photo timestamp verificationDigital inspection record with timestamp and geolocation metadataScaffold InspectorWeekly
42Digital Inspection RecordsDigital scaffold inspection data synced to central HSE dashboard for real-time status visibilityDashboard record matches field inspection within 24 hoursHSE ManagerWeekly
43Final Handback & DemobilizationScaffold materials counted and reconciled against delivery record upon demobilizationMaterial reconciliation report with variance explanationScaffold SupervisorOn demobilization
44Final Handback & DemobilizationArea beneath and around dismantled scaffold inspected and reinstated (ground reinstatement, debris removal)Area handover inspection checklist confirms reinstatement completeSite SupervisorAfter dismantling
45Insurance & Liability DocumentationScaffold contractor's insurance/liability coverage verified as current before erection commencesInsurance certificate validity checked against project datesProcurement OfficerBefore mobilization
46Insurance & Liability DocumentationIncident involving scaffold reported to insurer within required notification periodIncident notification correspondence with insurer on fileHSE ManagerAs occurs
47Bird Nesting & Pest ControlScaffold sheeting/cavities checked for bird nesting or pest infestation affecting structural cleanlinessPest inspection checklist completed for long-duration scaffoldsScaffold InspectorMonthly
48Design & CompetencyScaffold erected/altered/dismantled only by trained and certified scaffoldersScaffolder training/competency cards checked and verifiedScaffold SupervisorBefore assignment
49Design & CompetencyComplex or non-standard scaffold design approved by competent engineer per TG20/BS EN 12811Engineered design drawing on file matching erected configurationSite EngineerBefore erection
50Design & CompetencyScaffold design accounts for wind loading, loading class and working platform configurationDesign calculation includes wind load and platform load classDesign EngineerBefore erection
51Design & CompetencyMethod statement and risk assessment specific to scaffold erection/dismantling approvedSigned MS/RA on site with supervisor briefing recordScaffold SupervisorBefore erection
52Foundation & Base SupportBase plates and sole boards used on all standards to distribute load evenlySole board size/thickness checked against ground bearing capacityScaffold SupervisorBefore erection
53Foundation & Base SupportScaffold founded on firm, level ground free of voids, ice or excessive slopeGround condition inspected and recorded before erectionScaffold SupervisorBefore erection
54Foundation & Base SupportAdjustable base jacks extended within permissible limit per manufacturer instructionsJack extension measured against maximum allowable thread exposureScaffold InspectorBefore erection
55Structural IntegrityStandards vertical within tolerance and spaced per design/loading classStandard spacing and verticality measured with level/plumb lineScaffold InspectorWeekly
56Structural IntegrityLedgers and transoms level and correctly coupled at every liftCoupler check confirms correct type and torque at each junctionScaffold InspectorWeekly
57Structural IntegrityBracing (facade, ledger and plan bracing) installed per design pattern for structural stabilityBracing configuration matches approved scaffold drawingScaffold InspectorWeekly
58Structural IntegrityTies to permanent structure installed at required vertical/horizontal spacing and rated capacityTie pattern and pull/push test results recordedScaffold InspectorWeekly
59Structural IntegrityCouplers (right-angle, swivel, sleeve) are load-rated, undamaged and correctly tightenedTorque check log for sample of couplersScaffold InspectorWeekly
60Structural IntegrityNo unauthorized alterations, tube removal or overloading of scaffold structure since last inspectionComparison against last inspection tag/photo recordScaffold InspectorWeekly
61Working PlatformsPlatform boards fully boarded (no gaps) and free of splits, warping or excessive deflectionBoard condition and coverage visually verified across full platform widthScaffold InspectorWeekly
62Working PlatformsPlatform boards secured against uplift/movement with board clips or tied downBoard clip/tie inspection confirms no loose boardsScaffold InspectorWeekly
63Working PlatformsWorking platform width adequate for task and material storage per loading classPlatform width measured against design/loading class requirementScaffold InspectorWeekly
64Working PlatformsPlatform load not exceeding designated loading class rating (light/medium/heavy duty)Load estimation checked against posted loading class signageSite SupervisorDaily
65Edge Protection & AccessGuardrails installed at minimum 950mm (top rail) with mid-rail at all open edgesGuardrail height measured and confirmed at all platform edgesScaffold InspectorWeekly
66Edge Protection & AccessToe boards minimum 150mm installed at all platform edges to prevent falling objectsToe board height and continuity verified around platform perimeterScaffold InspectorWeekly
67Edge Protection & AccessAccess ladders/stair towers secured, extending min 1m above landing point with safe accessLadder tie-off and extension height measuredScaffold InspectorWeekly
68Edge Protection & AccessInternal access points (ladder bay) fitted with trapdoor/hatch or staggered access to prevent fallsAccess hatch mechanism functional and self-closing where requiredScaffold InspectorWeekly
69Edge Protection & AccessDebris netting/sheeting installed and secured where required to prevent falling material hazardsNetting fixed at all edges with no gaps or tearsScaffold InspectorWeekly
70Tagging & SignageScaffold tag (Scafftag/equivalent) displayed at all access points showing inspection statusGreen tag current within 7-day validity, or red tag for do-not-use statusScaffold InspectorWeekly
71Tagging & SignageIncomplete scaffold clearly identified with red/do-not-use tag and physical barrier at accessBarrier tape/physical block installed with incomplete scaffold signageScaffold SupervisorDuring erection
72Tagging & SignageLoading class signage posted and visible at scaffold access pointsSignage matches design loading class in kN/m2Scaffold SupervisorOn completion
73Formal Inspection RegimeScaffold formally inspected by competent person before first use after erectionHandover inspection certificate signed before useScaffold InspectorBefore first use
74Formal Inspection RegimeScaffold re-inspected after any alteration, adverse weather event or incidentRe-inspection record dated to event triggerScaffold InspectorAfter alteration/weather event
75Formal Inspection RegimeRoutine scaffold inspection conducted and documented at maximum 7-day intervalsWeekly inspection register with signature and findingsScaffold InspectorEvery 7 days
76Formal Inspection RegimeInspection findings/non-conformances closed out before scaffold returned to serviceNCR closure record referenced on inspection tagScaffold InspectorAs raised
77Weather & EnvironmentalScaffold use suspended during high wind conditions exceeding manufacturer/design limitsWind speed monitoring log with suspension recordSite SupervisorDuring adverse weather
78Weather & EnvironmentalSheeting/netting removed or secured additionally ahead of forecast high wind eventsWeather forecast review and preventive action logScaffold SupervisorBefore forecast event
79Weather & EnvironmentalScaffold inspected for ground settlement/washout after heavy rainfallPost-rain inspection checklist completedScaffold InspectorAfter rainfall event
80Loading & Usage ControlMaterials on platform distributed evenly and not stacked against guardrailsMaterial placement observed during daily walk-roundSite SupervisorDaily
81Loading & Usage ControlMobile/tower scaffold castors locked before use and never moved while occupiedCastor lock check before each work sessionUser / Site SupervisorBefore each use
82Loading & Usage ControlScaffold not used to support hoists, rubbish chutes or external loads unless specifically designedDesign verification for any attached equipmentSite EngineerBefore attachment
83DismantlingDismantling sequence follows reverse erection method statement to maintain stabilityDismantling sequence checklist signed off by supervisorScaffold SupervisorDuring dismantling
84DismantlingExclusion zone and barricading established below dismantling areaBarricade/signage inspected before dismantling startsSite SupervisorBefore dismantling
85DismantlingDismantled components inspected, sorted and stored for reuse or condemned if damagedComponent condition log updated post-dismantlingScaffold SupervisorAfter dismantling
86Documentation & RecordsScaffold inspection register maintained on site covering full erection-to-dismantling lifecycleRegister available for audit with continuous entriesScaffold SupervisorOngoing
87Documentation & RecordsHandover certificate issued to end user/trade confirming scaffold fit for intended useSigned handover certificate referencing loading class and configurationScaffold SupervisorOn handover

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.