Skip to main content
Site Safety UAE — construction site safety software logoSite Safety UAE
Login
Part L — Registers & Inspection Forms

Lifting gear pre-use inspection checklist

Workbook section 145
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plan L145 Lifting Gear Register
Checkpoints
88

Writing or reviewing the risk assessment behind this checklist? Read the MSRA meaning in safety — Method Statement Risk Assessment guide for the full definition, UAE regulations, roles and scoring method.

Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Chain SlingsCheck chain links for wear, stretch, nicks or gougesNo visible deformation; wear less than 10% of original diameterLifting SupervisorBefore each use
2Chain SlingsVerify chain sling identification tag legible and attachedTag shows WLL, size, grade, manufacturerLifting SupervisorBefore each use
3Chain SlingsInspect master link and hooks for cracks or distortionNo cracks; hook throat not opened beyond 5%Lifting SupervisorBefore each use
4Chain SlingsConfirm chain sling within current inspection validityThird-party inspection certificate not expiredHSE OfficerMonthly
5Chain SlingsCheck for signs of heat damage or discolorationNo burn marks, no blue or purple discolorationLifting SupervisorBefore each use
6Chain SlingsInspect locking or safety latch on hooksLatch closes fully and springs back freelyLifting SupervisorBefore each use
7Chain SlingsCheck for twisted or kinked chain linksChain lies flat without twistsLifting SupervisorBefore each use
8Chain SlingsVerify WLL marking matches load requirementWLL equal to or greater than load weightLifting SupervisorBefore each use
9Chain SlingsVerify grade 80 or 100 chain used per application requirementChain grade stamped and matches required ratingLifting SupervisorBefore each use
10Wire Rope SlingsInspect wire rope for broken strands or wiresNo more than allowable broken wires per lay lengthLifting SupervisorBefore each use
11Wire Rope SlingsCheck for corrosion, pitting or rustNo significant corrosion affecting strengthLifting SupervisorBefore each use
12Wire Rope SlingsInspect thimbles and swaged end fittingsThimbles seated correctly, no cracks in ferrulesLifting SupervisorBefore each use
13Wire Rope SlingsCheck for birdcaging or core protrusionNo birdcaging, kinking or core poppingLifting SupervisorBefore each use
14Wire Rope SlingsVerify sling tag and colour code currentTag legible, colour code matches inspection periodHSE OfficerMonthly
15Wire Rope SlingsInspect for crushing or flattening of rope diameterDiameter reduction less than 10%Lifting SupervisorBefore each use
16Wire Rope SlingsCheck lubrication condition of wire ropeAdequate lubrication visible, no drynessLifting SupervisorWeekly
17Wire Rope SlingsVerify end termination splice length meets standardSplice tucks meet minimum required lengthLifting SupervisorBefore each use
18Wire Rope SlingsCheck wire rope sling free from oil or grease contamination that hides defectsRope cleaned sufficiently to permit visual inspectionLifting SupervisorBefore each use
19Webbing & Round SlingsInspect webbing for cuts, fraying or tearsNo cuts exceeding 10% of width, no frayingLifting SupervisorBefore each use
20Webbing & Round SlingsCheck for chemical or UV degradation discolorationNo discoloration, stiffness or brittlenessLifting SupervisorBefore each use
21Webbing & Round SlingsVerify stitching intact with no broken threadsAll stitch patterns intact, no pulled threadsLifting SupervisorBefore each use
22Webbing & Round SlingsConfirm label or tag showing WLL and length legibleLabel legible with WLL, length, date of manufactureLifting SupervisorBefore each use
23Webbing & Round SlingsCheck for melting, glazing or heat damageNo glazed or melted fibres presentLifting SupervisorBefore each use
24Webbing & Round SlingsInspect protective sleeves at load-bearing pointsSleeves intact and correctly positionedLifting SupervisorBefore each use
25Webbing & Round SlingsVerify round sling inner core not exposed through outer sleeveOuter sleeve intact, core fibres not visibleLifting SupervisorBefore each use
26Webbing & Round SlingsCheck webbing sling free of knots used to shorten lengthNo knots present anywhere along sling bodyLifting SupervisorBefore each use
27ShacklesInspect shackle body for cracks, distortion or wearNo cracks, bent bow, or elongated pin holesLifting SupervisorBefore each use
28ShacklesCheck pin is correct type and fully seatedCorrect bolt or screw pin, fully threaded and seatedLifting SupervisorBefore each use
29ShacklesVerify WLL and markings stamped and legibleWLL, size and manufacturer stamp legibleLifting SupervisorBefore each use
30ShacklesCheck for thread damage on screw pin shacklesThreads clean, no cross-threading or damageLifting SupervisorBefore each use
31ShacklesConfirm shackle pin secured with mousing wire if requiredMousing wire fitted where vibration risk existsLifting SupervisorBefore each use
32ShacklesVerify shackle not side-loaded beyond rated angleShackle loaded in-line with pin, no side loadingLifting SupervisorBefore each lift
33ShacklesCheck shackle size compatible with sling and hook diameterBow diameter matches sling connection requirementLifting SupervisorBefore each use
34Hooks & Rigging HardwareInspect hooks for throat opening and wearThroat opening within manufacturer toleranceLifting SupervisorBefore each use
35Hooks & Rigging HardwareCheck swivel hooks rotate freely without bindingSmooth 360-degree rotation without seizureLifting SupervisorBefore each use
36Hooks & Rigging HardwareVerify safety latch present and functional on all hooksLatch present, undamaged and spring-loadedLifting SupervisorBefore each use
37Hooks & Rigging HardwareInspect eye bolts and lifting points for deformationNo bending, thread damage or elongationLifting SupervisorBefore each use
38Hooks & Rigging HardwareCheck load rings and turnbuckles for corrosionNo corrosion affecting load-bearing capacityLifting SupervisorWeekly
39Hooks & Rigging HardwareInspect wear indicator on hooks where fittedWear indicator within acceptable range, not triggeredLifting SupervisorBefore each use
40Hooks & Rigging HardwareCheck load block sheaves rotate freely without wobbleSheaves spin smoothly, no lateral playLifting SupervisorWeekly
41Hooks & Rigging HardwareVerify swivel hoist rings torqued to specificationRetaining bolt torque verified per manufacturer specLifting SupervisorMonthly
42Lifting Beams & Spreader BarsInspect lifting beam structure for cracks or bendingNo visible cracks, bends or weld defectsLifting SupervisorBefore each use
43Lifting Beams & Spreader BarsVerify load chart and WLL plate attached and legibleLoad chart visible, matches configuration usedLifting SupervisorBefore each use
44Lifting Beams & Spreader BarsCheck attachment points and pins for wearPins secure, no excessive wear or playLifting SupervisorBefore each use
45Lifting Beams & Spreader BarsConfirm current load test certificate availableValid load test certificate within 12 monthsHSE OfficerAnnually
46Lifting Beams & Spreader BarsInspect paint coating for corrosion indicatorsNo exposed rust compromising structural integrityLifting SupervisorMonthly
47Lifting Beams & Spreader BarsVerify spreader bar sling attachment points rated correctlyAttachment point WLL matches configuration usedLifting SupervisorBefore each use
48Lifting Beams & Spreader BarsCheck beam identification plate matches inspection recordSerial number on plate matches equipment registerHSE OfficerMonthly
49Certification & DocumentationVerify all lifting gear has valid third party inspectionTPI certificate valid, within statutory periodHSE OfficerBefore each use
50Certification & DocumentationCheck colour-coding system implemented for gearCurrent month colour code applied to all gearHSE OfficerMonthly
51Certification & DocumentationConfirm register of lifting equipment updatedEquipment register reflects current inventoryHSE OfficerMonthly
52Certification & DocumentationVerify competent person conducted periodic examinationExamination records signed by competent personHSE ManagerEvery 6 months
53Certification & DocumentationCheck defective gear quarantine and tagging processRejected gear tagged do-not-use and removedLifting SupervisorBefore each use
54Certification & DocumentationConfirm lifting plan references correct gear WLLLifting plan cross-checked against gear certificatesLifting SupervisorBefore each lift
55Certification & DocumentationVerify manufacturer certificate of conformity retained for new gearCertificate of conformity filed for each new itemHSE OfficerOn receipt of new gear
56Certification & DocumentationCheck lifting gear inspection frequency matches risk categoryInspection interval matches usage severity classificationHSE ManagerEvery 6 months
57Storage & HandlingCheck lifting gear stored off ground on racksGear stored on designated racks, not on floorSite StoremanWeekly
58Storage & HandlingVerify storage area protected from weather and chemicalsCovered storage, away from acids and solventsSite StoremanWeekly
59Storage & HandlingInspect gear for proper coiling or hanging to avoid kinksSlings hung or coiled correctly without kinksSite StoremanWeekly
60Storage & HandlingConfirm damaged gear segregated from serviceable gearSegregated quarantine area clearly markedSite StoremanWeekly
61Storage & HandlingCheck transportation of gear avoids dragging on groundGear carried or lifted, not dragged over rough surfacesLifting SupervisorBefore each use
62Storage & HandlingVerify gear issued through controlled checkout systemSign-out log maintained for issued lifting gearSite StoremanBefore each use
63Storage & HandlingCheck returned gear inspected before restockingReturn inspection recorded before gear returned to storeSite StoremanUpon return
64Operator & Rigger CompetencyVerify rigger holds valid rigging competency certificateCertificate valid and matches lift categoryHSE ManagerBefore deployment
65Operator & Rigger CompetencyConfirm banksman or signalman trained and certifiedValid banksman certification availableHSE ManagerBefore deployment
66Operator & Rigger CompetencyCheck toolbox talk conducted before lifting operationTBT record signed by all lifting crew membersLifting SupervisorBefore each lift
67Operator & Rigger CompetencyVerify PPE worn by riggers appropriate for taskHard hat, gloves, safety boots, hi-vis wornHSE OfficerBefore each lift
68Operator & Rigger CompetencyConfirm exclusion zone established under load pathBarricades and signage in place around lift areaLifting SupervisorBefore each lift
69Operator & Rigger CompetencyVerify lifting supervisor holds appointed person qualificationAppointed person certificate valid for lift categoryHSE ManagerBefore deployment
70Operator & Rigger CompetencyCheck refresher training completed within validity periodRefresher training certificate not expiredHSE ManagerEvery 3 years
71Pre-Use Functional ChecksPerform visual check of full sling length under tensionNo irregularities observed under test tensionLifting SupervisorBefore each use
72Pre-Use Functional ChecksConfirm correct sling angle used per lift planSling angle within calculated safe working rangeLifting SupervisorBefore each lift
73Pre-Use Functional ChecksCheck load weight confirmed against gear WLLLoad weight documented and within combined WLLLifting SupervisorBefore each lift
74Pre-Use Functional ChecksVerify tag lines attached for load controlTag lines fitted and used during liftRiggerBefore each lift
75Pre-Use Functional ChecksConfirm ground conditions suitable for crane or lifting equipmentGround bearing capacity verified, outriggers paddedLifting SupervisorBefore each lift
76Pre-Use Functional ChecksCheck weather conditions acceptable for lifting operationWind speed within crane manufacturer limitsLifting SupervisorBefore each lift
77Pre-Use Functional ChecksVerify sling protected from sharp edges with corner protectorsEdge protectors fitted at all sharp load contact pointsLifting SupervisorBefore each lift
78Pre-Use Functional ChecksConfirm sling length and reach suitable for lift geometrySling length matches lift plan calculationsLifting SupervisorBefore each lift
79Pre-Use Functional ChecksCheck for presence of unauthorized personnel under suspended loadArea cleared, no personnel under load at any timeLifting SupervisorDuring lift
80Pre-Use Functional ChecksVerify communication method between rigger and crane operator establishedRadio or hand signals confirmed and understoodLifting SupervisorBefore each lift
81Pre-Use Functional ChecksConfirm lifting gear not modified or repaired informallyNo welding, knots or unauthorized alterations presentLifting SupervisorBefore each use
82Pre-Use Functional ChecksCheck sling capacity de-rated correctly for choke/basket hitch configurationDe-rated WLL calculated and documented for hitch typeLifting SupervisorBefore each lift
83Pre-Use Functional ChecksVerify test lift performed at low height before full liftTrial lift conducted and load stable before proceedingLifting SupervisorBefore each lift
84Pre-Use Functional ChecksCheck crane load chart consulted for configuration usedLoad chart consulted and radius/capacity confirmedCrane OperatorBefore each lift
85Pre-Use Functional ChecksConfirm outrigger pads and mats used on soft groundOutrigger pads sized adequately for ground bearing pressureLifting SupervisorBefore each lift
86Pre-Use Functional ChecksVerify anti-two-block device functional on craneAnti-two-block alarm tested and functioningCrane OperatorBefore each lift
87Pre-Use Functional ChecksCheck taglines used are non-conductive near live servicesNon-conductive tag lines used near overhead power linesRiggerBefore each lift
88Pre-Use Functional ChecksConfirm lift supervisor present and in control throughout liftLift supervisor visible and directing operation continuouslyLifting SupervisorDuring lift

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.