Part L — Registers & Records

Formwork and Falsework Checklist

Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update on legal, authority, project or client change
Checkpoints
86
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Third-Party VerificationIndependent proof engineer review conducted for complex/high-risk falsework designProof engineering report filed with design packageProof EngineerBefore erection
2Third-Party VerificationFalsework certificate of compliance issued by third-party checker prior to loadingSigned compliance certificate referencing specific structure/pourThird-Party CheckerBefore pour
3System Formwork SpecificsProprietary system formwork (table forms, climbing forms) assembled per manufacturer's erection manualAssembly checklist cross-referenced against manufacturer manualFormwork SupervisorBefore erection
4System Formwork SpecificsClimbing formwork anchors and tie-back points verified for embedment strength before climbAnchor pull-out test or embedment record verifiedSite EngineerBefore each climb
5System Formwork SpecificsTable form/flying form lifting points and slings inspected before crane liftLifting point certification and sling inspection tag checkedRigging SupervisorBefore each lift
6Wind & Environmental LoadingFalsework wind bracing adequate for exposed height and local wind zone per designWind loading calculation referenced in design packageDesign EngineerBefore erection
7Wind & Environmental LoadingErection/striking activities suspended when wind speed exceeds design/method statement thresholdAnemometer reading log compared against threshold limitSite SupervisorDuring activity
8Wind & Environmental LoadingFalsework inspected for movement/settlement after heavy rain or storm eventPost-weather inspection checklist completedSite EngineerAfter adverse weather
9Slab Edge & Cantilever FormworkCantilevered slab edge formwork brackets rated and installed per manufacturer load tableBracket load rating certificate matched to cantilever spanFormwork SupervisorBefore erection
10Slab Edge & Cantilever FormworkEdge formwork counterweight/tie-down system verified stable before concrete placementTie-down inspection recorded on pre-pour checklistSite EngineerBefore pour
11Wall & Column FormworkWall formwork alignment braced with raker props at correct spacing and angleRaker prop spacing measured against design layoutFormwork SupervisorBefore pour
12Wall & Column FormworkColumn formwork clamps/yokes tightened uniformly to prevent bulging under pour pressureClamp torque/spacing checklist completed before pourFormwork SupervisorBefore pour
13Wall & Column FormworkKicker/starter formwork at base of wall/column verified watertight to prevent grout lossVisual seal check at kicker joint before pourFormwork SupervisorBefore pour
14Slab Formwork SpecificsSlab soffit formwork camber applied per design to offset anticipated deflectionCamber measurement recorded against design specificationSite EngineerBefore pour
15Slab Formwork SpecificsSlab formwork edge trims and stop-ends secured to prevent concrete leakageVisual inspection of edge trim fixing before pourFormwork SupervisorBefore pour
16Load Path VerificationFalsework load path traced from formwork through props to foundation with no interruptionLoad path diagram verified against as-erected conditionSite EngineerBefore pour
17Load Path VerificationOpenings/penetrations in falsework platform do not compromise structural load transferOpening layout checked against design load pathSite EngineerBefore pour
18Multi-Storey Falsework StackingFalsework props stacked over multiple floors aligned vertically per design requirementProp alignment verified floor-to-floor using plumb line/surveySite EngineerBefore erection
19Multi-Storey Falsework StackingLower floor slab confirmed to have achieved sufficient strength to support upper floor falsework loadsCube test/back-propping calculation confirms adequate strengthSite EngineerBefore loading
20Multi-Storey Falsework StackingBack-propping/re-shoring schedule maintained showing number of floors propped simultaneouslyBack-propping schedule matches design requirementSite EngineerOngoing
21Formwork Cleanliness & Rebar InterfaceFormwork interior cleaned of debris, sawdust and tie wire offcuts before rebar fixingCleanliness inspection recorded on Stage 1 checklistFormwork CrewBefore rebar fixing
22Formwork Cleanliness & Rebar InterfaceRebar cover spacers installed correctly without displacing or damaging formwork faceCover check confirms spacer type/spacing per drawingSite EngineerBefore pour
23Formwork Cleanliness & Rebar InterfaceEmbedded items (conduits, sleeves, cast-in plates) secured to prevent displacement during pourEmbedded item checklist verified against services drawingSite EngineerBefore pour
24Falsework near Live Traffic/PublicFalsework erected adjacent to public roads/pedestrian areas has protective hoarding and signageHoarding/signage inspection recorded with photosSite SupervisorBefore erection
25Falsework near Live Traffic/PublicOverhead protection (catch fans/nets) installed where falsework overhangs public access areasOverhead protection inspection checklist signed offHSE OfficerBefore erection
26Load TestingFalsework proof-load tested where required by design/regulatory authority prior to full loadingProof load test certificate with recorded deflection valuesThird-Party CheckerBefore first use
27Load TestingDeflection monitoring points established and readings taken during initial pour of new systemDeflection monitoring log with baseline and pour readingsSite EngineerDuring first pour
28Formwork Modification ControlAny field modification to approved falsework design routed through engineer for re-approvalModification request form with engineer approval before implementationSite EngineerAs required
29Formwork Modification ControlUnauthorized cutting/drilling of formwork structural members prohibited and enforcedToolbox talk record addressing modification controlSite SupervisorOngoing
30Curing Interface with FormworkCuring method (membrane/water curing) applied without compromising formwork tie integrityCuring method statement cross-checked with formwork removal planSite EngineerAfter pour
31Curing Interface with FormworkFormwork left in place for curing duration per specification before early striking consideredCuring duration log matched to specification requirementSite EngineerDuring curing
32Weather-Related Concrete ProtectionFormwork insulation/protection provided in hot weather concreting per method statementHot weather concreting checklist confirms insulation installedSite EngineerDuring hot weather pours
33Weather-Related Concrete ProtectionFormwork protected from rain ingress affecting fresh concrete surface finishRain protection cover inspection before/during pourSite SupervisorDuring adverse weather
34Falsework Removal SequencingFalsework/prop removal sequence follows engineer-approved order to prevent asymmetric loadingRemoval sequence checklist signed off per stageSite EngineerDuring dismantling
35Falsework Removal SequencingPartial dismantling operations do not leave adjacent structure unsupported without assessmentEngineer sign-off confirming adjacent support adequacySite EngineerDuring dismantling
36Inspection Frequency & EscalationDaily visual check of loaded falsework conducted during multi-day pour sequencesDaily inspection log with sign-off during pour campaignsSite EngineerDaily during pours
37Inspection Frequency & EscalationAny observed falsework distress triggers immediate work stoppage and engineer assessmentStop-work notice and engineer assessment report on fileSite EngineerImmediate on distress
38Training & Toolbox RecordsCrane operators/riggers involved in table form lifts hold valid lifting competency certificationCertification copies on file matched to assigned personnelHSE ManagerOn assignment
39Training & Toolbox RecordsRefresher training conducted for formwork crew after any near-miss or incident involving falseworkRefresher training record with topic and dateHSE ManagerAs required
40Insurance & Regulatory ComplianceFalsework design and erection comply with insurer's technical requirements where applicableInsurer technical review correspondence filedProject ManagerBefore erection
41Insurance & Regulatory ComplianceMunicipality/Civil Defence temporary structure approval obtained for falsework exceeding threshold heightApproval permit for temporary structure on fileProject ManagerBefore erection
42Handover & Close-outFormwork/falsework equipment demobilized and returned to supplier with condition reportReturn note with condition assessment signed by both partiesSite EngineerProject close-out
43Handover & Close-outLessons learned from formwork/falsework operations documented for future project referenceLessons learned register entry completedProject ManagerProject close-out
44Formwork Storage Between UsesReusable formwork panels stored stacked flat/vertical per manufacturer guidance to avoid warpingStorage yard inspection confirms correct stacking methodStore KeeperOngoing
45Formwork Storage Between UsesFormwork accessories (pins, wedges, clamps) inventoried and stored in labeled bins to prevent lossBin labeling and inventory count matches issue recordsStore KeeperMonthly
46Pour Card SystemConcrete pour card system requires formwork sign-off box completed before pour authorizationPour card retained with all sign-off boxes completedSite EngineerPer pour
47Pour Card SystemPour card discrepancies (missing sign-off) escalated to project manager before pour proceedsEscalation log entry with resolution before pourProject ManagerAs required
48Design & ApprovalFormwork/falsework design prepared and stamped by competent structural engineerApproved design drawings with engineer's stamp and calculations on fileSite EngineerBefore erection
49Design & ApprovalDesign loading accounts for concrete pour rate, wet concrete weight, live load, wind and construction loadsDesign calculation package reviewed against BS 5975/EN 12812 methodologyDesign EngineerBefore erection
50Design & ApprovalMethod statement and risk assessment approved prior to erectionSigned MS/RA with client/consultant approval stampProject ManagerBefore erection
51Design & ApprovalFormwork erection drawings issued to site match approved design revisionDrawing revision number matches issued-for-construction registerSite EngineerBefore erection
52Materials & ComponentsFormwork panels, plywood and timber free of excessive wear, splitting or delaminationVisual inspection log of panel condition prior to reuseFormwork SupervisorBefore each use
53Materials & ComponentsProps/standards free of bends, corrosion, cracked welds or damaged base platesComponent inspection tag attached to each propFormwork SupervisorBefore erection
54Materials & ComponentsAdjustable props extended within manufacturer's maximum permissible extensionProp pin position checked against manufacturer load tableFormwork SupervisorBefore erection
55Materials & ComponentsTie rods, wing nuts and waler clamps of correct rated capacity and free from thread damageComponent check against design specificationFormwork SupervisorBefore erection
56Materials & ComponentsRelease agent applied evenly to formfaces prior to reinforcement fixingApplication record confirming coverage before rebar fixingFormwork CrewBefore each pour
57Foundation & SupportFalsework base supported on firm, level ground or sole plates capable of bearing imposed loadGround bearing capacity assessment and sole plate size verifiedSite EngineerBefore erection
58Foundation & SupportSole plates/base plates sized to distribute prop load without ground settlementSole plate dimension checked against design load calculationFormwork SupervisorBefore erection
59Foundation & SupportNo falsework standing on backfilled/disturbed ground without engineered support verificationGeotechnical or engineer sign-off for ground conditionSite EngineerBefore erection
60Erection & BracingStandards, ledgers and bracing installed as per approved falsework drawing spacingSpacing measured and compared to drawing on inspection checklistFormwork SupervisorDuring erection
61Erection & BracingDiagonal and horizontal bracing installed in both directions to prevent lateral instabilityBracing pattern matches design layout, verified by walk-throughFormwork SupervisorBefore loading
62Erection & BracingProps plumb and vertical within tolerance (max 1:100 out of plumb per BS 5975)Spirit level/plumb bob check recorded per prop lineFormwork SupervisorBefore pour
63Erection & BracingProp pins fully engaged and locking devices secured on all adjustable propsPhysical check of each pin/collar during pre-pour inspectionFormwork SupervisorBefore pour
64Erection & BracingFormwork ties and clamps tightened to design torque/spacing with no missing tiesTie spacing count matches design drawingFormwork SupervisorBefore pour
65Erection & BracingWorking platforms/kickboards provided at formwork edges for crew accessEdge protection inspected as part of erection sign-offSite SupervisorBefore use
66Formwork Inspection Sign-offIndependent formwork/falsework inspection completed and signed prior to reinforcement fixingFormwork inspection checklist Stage 1 signed by competent personSite EngineerBefore rebar fixing
67Formwork Inspection Sign-offFinal pre-pour inspection (Stage 2) confirms formwork geometry, level, alignment and cleanlinessPre-pour checklist signed by site engineer and consultantConsultant EngineerBefore each pour
68Formwork Inspection Sign-offPermit to pour issued only after formwork, falsework and rebar inspections closedConcrete pour permit with all inspection sign-offs attachedSite EngineerBefore each pour
69During ConcretingConcrete placement sequence and pour rate followed as per design to avoid overloading formworkPour rate log compared to design maximum rateSite EngineerDuring pour
70During ConcretingFormwork monitored for deflection, bulging or movement during pourBanksman/engineer observation log during concretingSite EngineerDuring pour
71During ConcretingVibration of concrete does not exceed levels causing formwork joint separationVisual monitoring of joints during vibration activityConcrete ForemanDuring pour
72During ConcretingEmergency stop procedure available if formwork distress observed during pourDocumented emergency stop procedure communicated at toolbox talkSite EngineerBefore pour
73Striking & DismantlingFormwork/falsework striking time complies with minimum concrete strength/curing period per designCube test results confirm required strength before strikingSite EngineerBefore striking
74Striking & DismantlingStriking sequence follows approved method statement to avoid shock loadingStriking sequence checklist signed off per pourFormwork SupervisorAt striking
75Striking & DismantlingBackprops/reshoring installed where required after early strikingReshoring layout matches design and verified by engineerSite EngineerAfter striking
76Striking & DismantlingStruck formwork components inspected, cleaned and stored before reuseComponent condition log updated after each strike cycleFormwork SupervisorAfter striking
77Striking & DismantlingDismantled falsework materials stacked/stored away from edges and traffic routesStorage area inspection confirms safe stackingSite SupervisorAfter dismantling
78Housekeeping & AccessFormwork work area kept free of loose nails, protruding tie wires and debrisHousekeeping inspection checklist completed dailySite SupervisorDaily
79Housekeeping & AccessAccess ladders/stairs to elevated formwork platforms secured and inspectedLadder inspection tag current and secured at top/bottomSite SupervisorWeekly
80Housekeeping & AccessEdge protection/guardrails maintained around formwork perimeter at heightGuardrail height and toe board compliance verified per fall protection standardHSE OfficerDaily
81Competency & SupervisionFormwork erection crew trained and competent for system type in use (e.g., proprietary system formwork)Training/competency certificates on file for crewHSE ManagerOn assignment
82Competency & SupervisionCompetent person assigned to supervise all formwork/falsework erection and striking activitiesSupervisor appointment letter and site presence confirmedProject ManagerOngoing
83Competency & SupervisionToolbox talk conducted before erection/striking of significant/complex formwork systemsToolbox talk attendance sheet with topic recordedSite SupervisorBefore activity
84Documentation & RecordsFormwork/falsework inspection register maintained for each pour with unique reference numberRegister cross-referenced to pour permits and drawingsSite EngineerPer pour
85Documentation & RecordsNon-conformances during formwork inspection tracked to closure before proceedingNCR log with closure verification signed by engineerSite EngineerAs raised
86Documentation & RecordsAs-built formwork records retained for significant/temporary structures for QA/QC auditQA/QC file containing complete inspection trailQA/QC ManagerProject close-out

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.