Part H — High-Risk Works
Excavation and shoring permit checklist
Workbook section 78
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plan H78 Excavations Trenching Shoring; Utility strike prevention
Checkpoints
88
Writing or reviewing the risk assessment behind this checklist? Read the MSRA meaning in safety — Method Statement Risk Assessment guide for the full definition, UAE regulations, roles and scoring method.
| # | Area | Checkpoint / Requirement | Evidence / Acceptance Criteria | Responsible | Frequency |
|---|---|---|---|---|---|
| 1 | Permit & Planning | Verify excavation permit to work issued and signed | PTW valid, signed by authorized person | HSE Officer | Before excavation starts |
| 2 | Permit & Planning | Confirm underground utility survey and mapping completed | Utility drawings reviewed, cable and pipe locations marked | Site Engineer | Before excavation starts |
| 3 | Permit & Planning | Check utility locating scan carried out | Utility scan report available and signed off | Site Engineer | Before excavation starts |
| 4 | Permit & Planning | Verify method statement and risk assessment approved | MS and RA approved by HSE Manager | HSE Manager | Before excavation starts |
| 5 | Permit & Planning | Confirm competent person assigned for excavation supervision | Named competent person listed on permit | Project Manager | Before excavation starts |
| 6 | Permit & Planning | Check adjacent structures assessed for impact | Structural assessment report available if applicable | Site Engineer | Before excavation starts |
| 7 | Permit & Planning | Verify emergency rescue plan established for excavation | Rescue plan documented and equipment on site | HSE Manager | Before excavation starts |
| 8 | Permit & Planning | Verify excavation depth does not exceed permit approved limit without revalidation | Depth logged and compared against approved permit limit | Site Engineer | Continuous |
| 9 | Permit & Planning | Confirm traffic management plan in place near excavation on roadways | TMP approved and signage/diversions implemented | Site Engineer | Before excavation starts |
| 10 | Shoring & Support System | Verify shoring system design approved by engineer | Approved shoring design drawings on site | Site Engineer | Before installation |
| 11 | Shoring & Support System | Inspect trench boxes and shields for structural integrity | No cracks, bends or corrosion on shoring panels | HSE Officer | Daily |
| 12 | Shoring & Support System | Check hydraulic or screw jacks properly tensioned | Struts tight, no visible slack or movement | Site Engineer | Daily |
| 13 | Shoring & Support System | Verify shoring extends above top of excavation edge | Shoring protrudes minimum 300mm above grade | HSE Officer | Daily |
| 14 | Shoring & Support System | Confirm spacing of shoring struts as per design | Strut spacing matches approved design spacing | Site Engineer | Daily |
| 15 | Shoring & Support System | Check timber or steel sheeting condition for shoring | No splitting, warping or corrosion damage | HSE Officer | Daily |
| 16 | Shoring & Support System | Verify shoring installed progressively with excavation depth | Shoring installed before workers enter deeper sections | Site Supervisor | Continuous |
| 17 | Shoring & Support System | Confirm removal of shoring done in reverse sequence of installation | Shoring removed from bottom up as backfill proceeds | Site Supervisor | During backfilling |
| 18 | Shoring & Support System | Verify walers and struts inspected for corrosion and bending | No corrosion or bending compromising strut strength | Site Engineer | Daily |
| 19 | Shoring & Support System | Check shoring system compatible with soil and water table conditions | Shoring type suitable per geotechnical report | Site Engineer | Before installation |
| 20 | Sloping & Benching | Verify slope angle complies with soil classification | Slope ratio matches soil type per standard | Site Engineer | Before entry |
| 21 | Sloping & Benching | Inspect benching steps for stability and dimensions | Bench height and width per approved design | Site Engineer | Daily |
| 22 | Sloping & Benching | Check for signs of soil slippage or cracking at edges | No tension cracks or bulging observed | HSE Officer | Daily |
| 23 | Sloping & Benching | Verify spoil piles kept at safe distance from edge | Spoil stored minimum 1m or per design from edge | Site Supervisor | Continuous |
| 24 | Sloping & Benching | Confirm surface water diverted away from excavation | Drainage channels and berms directing water away | Site Supervisor | Daily |
| 25 | Sloping & Benching | Check soil classification test results available | Soil classification report on file matching site conditions | Site Engineer | Before excavation starts |
| 26 | Sloping & Benching | Verify additional support provided where slope interrupted by utilities | Local shoring or support installed around utility crossings | Site Engineer | Before excavation starts |
| 27 | Sloping & Benching | Check vibration from nearby plant does not destabilize slope | Vibration monitoring shows no adverse impact on slope | Site Engineer | Continuous |
| 28 | Access & Egress | Verify ladder or ramp access provided in excavation | Access within 7.5m of any worker location | Site Supervisor | Before entry |
| 29 | Access & Egress | Inspect ladder condition and secure footing | Ladder tied off, extends 1m above edge | HSE Officer | Daily |
| 30 | Access & Egress | Check number of access points adequate for excavation size | Minimum access points per excavation length | Site Supervisor | Before entry |
| 31 | Access & Egress | Verify egress route unobstructed at all times | Clear path free of materials and equipment | Site Supervisor | Continuous |
| 32 | Access & Egress | Confirm access ramps for vehicles constructed at safe gradient | Ramp gradient complies with vehicle manufacturer limits | Site Engineer | Before use |
| 33 | Access & Egress | Check ladder rungs free of mud, oil or debris creating slip hazard | Ladder rungs clean and slip-free before use | HSE Officer | Daily |
| 34 | Access & Egress | Confirm access equipment inspected for damage before each use | Ladder or steps inspected, no damage or defects found | HSE Officer | Before each use |
| 35 | Access & Egress | Verify separate access maintained for pedestrians and vehicles | Pedestrian and vehicle access routes clearly segregated | Site Supervisor | Continuous |
| 36 | Edge Protection & Barricading | Verify guardrails or barricades installed around excavation | Barricade minimum 1m from edge, all sides enclosed | Site Supervisor | Before excavation starts |
| 37 | Edge Protection & Barricading | Check warning signage posted at excavation perimeter | Signage visible indicating excavation hazard | HSE Officer | Before excavation starts |
| 38 | Edge Protection & Barricading | Inspect toe boards installed to prevent material falling in | Toe boards fitted where required along edges | Site Supervisor | Daily |
| 39 | Edge Protection & Barricading | Verify night-time lighting and warning lights in place | Barricade lights functioning after dark | Site Supervisor | Daily |
| 40 | Edge Protection & Barricading | Confirm covers provided for unattended excavations | Excavation covered or fully barricaded when unattended | Site Supervisor | End of each shift |
| 41 | Edge Protection & Barricading | Verify barricade tape or fencing replaced immediately if damaged | Damaged barricading repaired or replaced within same shift | Site Supervisor | Continuous |
| 42 | Edge Protection & Barricading | Verify edge protection maintained during material handling operations | Barricades remain intact while materials lifted near edge | Site Supervisor | Continuous |
| 43 | Edge Protection & Barricading | Check excavation adjacent to public areas fully hoarded | Hoarding erected where excavation borders public access | Site Supervisor | Before excavation starts |
| 44 | Atmospheric & Gas Monitoring | Verify gas testing conducted before entry into deep excavation | Gas test results within safe limits before entry | HSE Officer | Before entry |
| 45 | Atmospheric & Gas Monitoring | Check continuous gas monitoring for excavations over 1.5m deep | Gas detector in operation during occupied work | HSE Officer | Continuous |
| 46 | Atmospheric & Gas Monitoring | Confirm ventilation provided in confined excavation areas | Forced ventilation equipment operating as required | Site Supervisor | During occupancy |
| 47 | Atmospheric & Gas Monitoring | Verify calibration of gas detection equipment current | Calibration certificate valid and within date | HSE Officer | Monthly |
| 48 | Atmospheric & Gas Monitoring | Check gas monitoring log reviewed daily by HSE officer | Daily gas monitoring log reviewed and signed off | HSE Officer | Daily |
| 49 | Atmospheric & Gas Monitoring | Verify oxygen levels tested in excavations near contaminated ground | Oxygen level within 19.5% to 23.5% range confirmed | HSE Officer | Before entry |
| 50 | Atmospheric & Gas Monitoring | Check emergency evacuation alarm audible at excavation location | Alarm test confirms audibility at excavation depth | HSE Officer | Weekly |
| 51 | Loads & Adjacent Structures | Check vehicles and equipment kept minimum safe distance from edge | Plant kept at least 2m or per design from excavation edge | Site Supervisor | Continuous |
| 52 | Loads & Adjacent Structures | Verify surcharge loads accounted for in shoring design | Design accounts for stored materials and equipment loads | Site Engineer | Before excavation starts |
| 53 | Loads & Adjacent Structures | Inspect adjacent structures for signs of settlement or cracking | No new cracks or movement detected during monitoring | Site Engineer | Daily |
| 54 | Loads & Adjacent Structures | Confirm underpinning or protection measures for nearby foundations | Underpinning installed per engineering design where required | Site Engineer | Before excavation starts |
| 55 | Loads & Adjacent Structures | Check exposed utilities identified and protected | Exposed cables and pipes supported and marked | Site Engineer | Continuous |
| 56 | Loads & Adjacent Structures | Check spoil and materials segregated to prevent overloading excavation edge | Materials stacked at safe distance and within load limits | Site Supervisor | Continuous |
| 57 | Loads & Adjacent Structures | Verify crane or excavator positioned outside influence zone of trench | Equipment positioned per geotechnical influence zone calculation | Site Engineer | Before excavation starts |
| 58 | Loads & Adjacent Structures | Check dewatering system operating to control groundwater ingress | Dewatering pumps functioning, water table controlled | Site Engineer | Continuous |
| 59 | Loads & Adjacent Structures | Confirm retaining wall or sheet piling monitored for deflection | Deflection readings within design tolerance limits | Site Engineer | Weekly |
| 60 | Excavation Inspection & Monitoring | Verify daily excavation inspection conducted and logged | Inspection checklist completed and signed daily | Competent Person | Daily |
| 61 | Excavation Inspection & Monitoring | Check inspection carried out after rainfall or ground disturbance | Additional inspection recorded after weather events | Competent Person | After rain event |
| 62 | Excavation Inspection & Monitoring | Confirm re-inspection after any blasting or vibration nearby | Inspection record after vibration-inducing activity | Competent Person | As required |
| 63 | Excavation Inspection & Monitoring | Verify movement monitoring instruments installed if required | Survey pins or inclinometers installed and monitored | Site Engineer | Weekly |
| 64 | Excavation Inspection & Monitoring | Check inspection records retained on site | Inspection log accessible for review on site | HSE Officer | Continuous |
| 65 | Excavation Inspection & Monitoring | Verify inspection conducted before each shift start | Pre-shift inspection log completed and signed | Competent Person | Before each shift |
| 66 | Excavation Inspection & Monitoring | Check third-party independent inspection scheduled for deep excavations | Independent inspection report available for excavations over 6m | HSE Manager | Monthly |
| 67 | Excavation Inspection & Monitoring | Confirm photographic records maintained of excavation progress | Photo log updated showing shoring and slope condition | Site Engineer | Weekly |
| 68 | Worker Safety & PPE | Verify workers trained on excavation hazards before entry | Training records available for all workers entering | HSE Manager | Before deployment |
| 69 | Worker Safety & PPE | Check PPE worn appropriate for excavation work | Hard hat, safety boots, hi-vis vest worn at all times | HSE Officer | Continuous |
| 70 | Worker Safety & PPE | Confirm no lone working permitted in excavation | Minimum two persons present during excavation entry | Site Supervisor | Continuous |
| 71 | Worker Safety & PPE | Verify emergency rescue equipment available at excavation | Rescue tripod or retrieval equipment on standby | HSE Officer | Continuous |
| 72 | Worker Safety & PPE | Check toolbox talk conducted before excavation work begins | TBT record signed by all workers involved | Site Supervisor | Before excavation starts |
| 73 | Worker Safety & PPE | Confirm workers instructed not to work under suspended loads near excavation | Exclusion zone maintained under any suspended load | Site Supervisor | Continuous |
| 74 | Worker Safety & PPE | Confirm safe distance maintained between workers and mechanical excavator bucket swing | Exclusion zone marked around excavator operating radius | Site Supervisor | Continuous |
| 75 | Worker Safety & PPE | Verify hand signals or spotter used when excavator operates near workers | Spotter positioned with clear line of sight to operator | Site Supervisor | Continuous |
| 76 | Worker Safety & PPE | Verify fall protection provided at excavation edges over 2m | Guardrails or harness system used where applicable | HSE Officer | Continuous |
| 77 | Worker Safety & PPE | Check first aid kit and trained first aider available on site | First aid kit stocked, first aider present during works | HSE Officer | Continuous |
| 78 | Worker Safety & PPE | Confirm communication device available for workers inside excavation | Radio or phone available for emergency communication | Site Supervisor | Continuous |
| 79 | Worker Safety & PPE | Verify rescue tripod and harness tested and ready for use | Rescue equipment inspected and certified for use | HSE Officer | Monthly |
| 80 | Worker Safety & PPE | Check excavation work stopped during adverse weather conditions | Work halted during heavy rain, lightning or high wind | Site Supervisor | As required |
| 81 | Backfilling & Reinstatement | Verify backfill material approved and compacted in layers | Compaction test results meet specification per layer | Site Engineer | During backfilling |
| 82 | Backfilling & Reinstatement | Check shoring removed safely during backfilling sequence | Shoring removal sequence matches approved method statement | Site Supervisor | During backfilling |
| 83 | Backfilling & Reinstatement | Confirm reinstated surface inspected for settlement risk | Surface level and compaction verified before handover | Site Engineer | After backfilling |
| 84 | Backfilling & Reinstatement | Verify barricades removed only after area confirmed safe | Barricades removed after final inspection sign-off | Site Supervisor | After backfilling |
| 85 | Backfilling & Reinstatement | Confirm surrounding pavement or landscaping restored to original condition | Reinstatement matches original surface finish and levels | Site Engineer | After backfilling |
| 86 | Backfilling & Reinstatement | Verify utilities reinstated and protected before backfilling | Utility protection tape and marker installed before backfill | Site Engineer | During backfilling |
| 87 | Backfilling & Reinstatement | Check backfilling method statement followed for layer thickness | Layer thickness matches approved method statement | Site Engineer | During backfilling |
| 88 | Backfilling & Reinstatement | Confirm final compaction test results meet design requirement | Compaction density test results pass specification | Site Engineer | After backfilling |
Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.