Part H — High-Risk Works
Concrete pumping
Workbook section 84
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plans TOC - Part H; H - Concrete Pumping Controls; Plan H84 Concrete Pouring Pumpi
Checkpoints
88
| # | Area | Checkpoint / Requirement | Evidence / Acceptance Criteria | Responsible | Frequency |
|---|---|---|---|---|---|
| 1 | Pump & Equipment Certification | Concrete pump third-party inspection certificate valid | Current TPI certificate displayed on pump unit | HSE Officer | Prior to use, per validity |
| 2 | Pump & Equipment Certification | Boom pump load chart and slew radius chart available | Load chart legible and mounted in operator cab | HSE Officer | Prior to use |
| 3 | Pump & Equipment Certification | Pipeline, clamps and couplings rated for pumping pressure | Manufacturer rating verified against pump specification sheet | Site Engineer | Prior to each setup |
| 4 | Pump & Equipment Certification | Safety pins and clamps inspected for wear/damage | Visual inspection checklist completed before assembly | Pump Operator | Daily before pumping |
| 5 | Pump & Equipment Certification | Outrigger pads and ground bearing capacity verified | Ground bearing pressure calculation matched to outrigger load | Site Engineer | Prior to boom set-up |
| 6 | Pump & Equipment Certification | Hydraulic hoses and fittings inspected for leaks/damage | Visual inspection log with no leaks/damage recorded | Pump Operator | Daily |
| 7 | Pump & Equipment Certification | Pump operator competency certificate valid | Certified operator license copy on file | HSE Officer | Prior to assignment, per validity |
| 8 | Pre-Pumping Setup & Positioning | Pump positioned on stable, level ground clear of excavations | Ground survey/visual check recorded before setup | Site Engineer | Each setup |
| 9 | Pre-Pumping Setup & Positioning | Outriggers fully extended and locked as per manufacturer spec | Outrigger deployment checklist signed by operator | Pump Operator | Each setup |
| 10 | Pre-Pumping Setup & Positioning | Overhead power line clearance assessed for boom pump | Clearance distance measured against DEWA safe distance table | HSE Officer | Prior to each boom setup |
| 11 | Pre-Pumping Setup & Positioning | Exclusion zone established around pump base and boom swing radius | Barricading and signage inspection record | HSE Officer | Each setup |
| 12 | Pre-Pumping Setup & Positioning | Pipeline route inspected and secured along placement path | Pipeline support/anchoring checklist completed | Site Supervisor | Each setup |
| 13 | Pre-Pumping Setup & Positioning | Communication method between operator, banksman and placer confirmed | Radio check/hand signal briefing record | Pump Operator | Before each pour |
| 14 | Concrete Mix & Material Quality | Approved concrete mix design verified against pour requirement | Mix design approval document matched to delivery ticket | QA/QC Engineer | Each pour |
| 15 | Concrete Mix & Material Quality | Delivery ticket details checked (batch time, mix code, quantity) | Delivery ticket cross-checked against approved mix | Site Engineer | Each truck load |
| 16 | Concrete Mix & Material Quality | Slump test conducted and within specified tolerance | Slump test result recorded on QA form | QA/QC Engineer | Every truck / per batch |
| 17 | Concrete Mix & Material Quality | Concrete temperature checked against specification limits | Temperature reading logged on QA form | QA/QC Engineer | Each truck load |
| 18 | Concrete Mix & Material Quality | Test cubes cast for compressive strength verification | Cube casting record with sample ID and curing log | QA/QC Engineer | Per pour, per code requirement |
| 19 | Concrete Mix & Material Quality | Concrete discharged within permissible time from batching | Time log comparing batching time to discharge time | Site Engineer | Each truck load |
| 20 | Pumping Operation Controls | Pump primed correctly to prevent blockage/blowback | Priming procedure checklist completed by operator | Pump Operator | Before each pour start |
| 21 | Pumping Operation Controls | Boom movement restricted to rated working envelope | Operator log confirming boom within rated radius/height | Pump Operator | Continuous during pumping |
| 22 | Pumping Operation Controls | No personnel positioned under boom or in line of pipe whip zone | Exclusion zone monitoring log by supervisor | Site Supervisor | Continuous during pumping |
| 23 | Pumping Operation Controls | Pump pressure monitored and kept within safe operating limits | Pressure gauge readings logged during pumping | Pump Operator | Every 30 minutes during pumping |
| 24 | Pumping Operation Controls | Blockage clearing procedure followed with pressure released first | Documented blockage-clearing procedure with sign-off | Pump Operator | As required, procedure on file |
| 25 | Pumping Operation Controls | End hose/whip hose secured and controlled by trained placer | Placer competency record and hose control observation | Site Supervisor | Continuous during pumping |
| 26 | Pumping Operation Controls | Wind speed monitored for boom pump operation limits | Wind speed log against manufacturer operating limit | HSE Officer | Every 2 hours during pumping |
| 27 | Housekeeping & Environmental Controls | Concrete washout area designated and lined to prevent contamination | Washout pit inspection record with containment verified | HSE Officer | Each pour |
| 28 | Housekeeping & Environmental Controls | Spilled concrete/slurry cleaned up immediately | Housekeeping inspection log post-pour | Site Supervisor | After each pour |
| 29 | Housekeeping & Environmental Controls | Wastewater/wash water disposed per environmental permit | Waste disposal manifest/record retained | Environmental Officer | Each pour |
| 30 | Housekeeping & Environmental Controls | Pump and mixer trucks cleaned in designated wash-down area only | Wash-down area usage log | Site Supervisor | Each pour |
| 31 | PPE & Personnel Safety Around Pumping | PPE (helmet, boots, gloves, eye protection) worn by all crew | PPE compliance spot-check log | HSE Officer | Continuous / daily |
| 32 | PPE & Personnel Safety Around Pumping | High-visibility vest worn by placer and banksman near pipeline | Visual compliance check recorded | HSE Officer | Daily |
| 33 | PPE & Personnel Safety Around Pumping | Face shield/goggles used when handling high-pressure end hose | PPE issue record and spot check | Site Supervisor | During pumping |
| 34 | PPE & Personnel Safety Around Pumping | Skin contact with wet concrete minimized with appropriate gloves/PPE | Toolbox talk record on cement dermatitis prevention | HSE Officer | Prior to each pour, refreshed monthly |
| 35 | Emergency Preparedness for Pumping Operations | Emergency stop function tested and accessible on pump control panel | E-stop function test recorded before each pour | Pump Operator | Before each pour |
| 36 | Emergency Preparedness for Pumping Operations | Emergency shutdown/blockage procedure communicated to crew | Toolbox talk attendance record on emergency procedure | HSE Officer | Before each pour |
| 37 | Emergency Preparedness for Pumping Operations | First aid kit and eye wash station available at pour location | Inventory checklist verified against stock list | HSE Officer | Each pour day |
| 38 | Emergency Preparedness for Pumping Operations | Fire extinguisher available near pump unit | Inspection tag checked and extinguisher accessible | HSE Officer | Weekly |
| 39 | Post-Pour Inspection & Documentation | Pump and pipeline decommissioned and cleaned after pour completion | Post-pour equipment checklist signed off | Pump Operator | After each pour |
| 40 | Post-Pour Inspection & Documentation | Pour record completed with quantity, time and location details | Concrete pour record sheet completed and filed | Site Engineer | Each pour |
| 41 | Post-Pour Inspection & Documentation | Non-conformances during pumping documented and closed out | NCR log with closure evidence | QA/QC Engineer | As required, reviewed weekly |
| 42 | Post-Pour Inspection & Documentation | Curing method applied immediately after finishing per specification | Curing compound/cover application record | Site Supervisor | Immediately after pour |
| 43 | Line Pump (Trailer/Static) Specific Controls | Line pump hopper grate/safety guard in place and secured | Visual inspection confirming grate secured before start | Pump Operator | Before each pour |
| 44 | Line Pump (Trailer/Static) Specific Controls | Delivery pipeline supported at correct intervals to prevent whip | Pipeline support spacing checked against manufacturer guide | Site Engineer | Each setup |
| 45 | Line Pump (Trailer/Static) Specific Controls | Reducer/cleaning ball trap fitted and rated for line pressure | Visual inspection of ball trap fitting and rating | Pump Operator | Each setup |
| 46 | Line Pump (Trailer/Static) Specific Controls | Remote control unit battery and function checked before use | Remote control function test log | Pump Operator | Before each pour |
| 47 | Boom Pump Specific Controls | Boom unfolding sequence followed per manufacturer procedure | Boom deployment checklist signed by operator | Pump Operator | Each setup |
| 48 | Boom Pump Specific Controls | Boom tip hose (rubber end hose) length and condition checked | Visual inspection of end hose length and wear | Pump Operator | Before each pour |
| 49 | Boom Pump Specific Controls | Anti-two-block/boom angle limiter functional | Function test recorded on pre-use checklist | Pump Operator | Before each pour |
| 50 | Boom Pump Specific Controls | Turntable and slewing ring inspected for wear/play | Mechanical inspection log per maintenance schedule | Maintenance Engineer | Monthly |
| 51 | Traffic & Access Control at Pumping Location | Concrete truck queuing/access route managed to avoid congestion | Traffic management diagram for pour day reviewed | Site Supervisor | Each pour day |
| 52 | Traffic & Access Control at Pumping Location | Banksman deployed to guide concrete trucks into position | Deployment record and observation log | HSE Officer | Each pour |
| 53 | Traffic & Access Control at Pumping Location | Pedestrian access restricted within pump exclusion zone | Barricade and signage inspection record | HSE Officer | Each pour |
| 54 | Traffic & Access Control at Pumping Location | Reversing concrete trucks guided by banksman with clear signals | Toolbox talk record on truck reversing signals | HSE Officer | Each pour |
| 55 | Working at Height Interface (Elevated Pours) | Placer working platform/scaffold inspected and tagged before pour | Scaffold inspection tag valid and displayed | Scaffold Inspector | Before each pour |
| 56 | Working at Height Interface (Elevated Pours) | Fall protection (harness/guardrails) used by placer at height | PPE/anchor point inspection checklist | HSE Officer | Before each pour |
| 57 | Working at Height Interface (Elevated Pours) | Pipeline securely fixed to structure to prevent dislodgement during pour at height | Pipeline anchorage inspection checklist | Site Engineer | Each setup |
| 58 | Working at Height Interface (Elevated Pours) | Material/tool drop prevention measures in place at elevated pour location | Toolbox talk record on dropped object prevention | HSE Officer | Before each pour |
| 59 | Monitoring, Audit & Continual Improvement | Monthly concrete pumping safety audit conducted | Completed audit report with closed-out findings | HSE Manager | Monthly |
| 60 | Monitoring, Audit & Continual Improvement | Pump maintenance records reviewed for compliance with schedule | Maintenance log reviewed against OEM schedule | Maintenance Engineer | Monthly |
| 61 | Monitoring, Audit & Continual Improvement | Incidents/near-misses during pumping investigated and trended | Investigation report and trend analysis in HSE meeting minutes | HSE Manager | Monthly |
| 62 | Monitoring, Audit & Continual Improvement | Lessons learned from pours shared in toolbox talks | Toolbox talk record referencing lessons learned | HSE Officer | Monthly |
| 63 | Pump & Equipment Certification | Pump chassis and mounting bolts inspected for structural integrity | Structural inspection checklist per maintenance schedule | Maintenance Engineer | Monthly |
| 64 | Pump & Equipment Certification | Emergency stop cables/buttons accessible at multiple pump locations | Function test log for all e-stop points | Pump Operator | Before each pour |
| 65 | Pre-Pumping Setup & Positioning | Access/egress route for pump vehicle to site verified clear | Site access route inspection record | Site Supervisor | Each setup |
| 66 | Pre-Pumping Setup & Positioning | Underground services (utilities) location verified before outrigger deployment | Utility survey/permit-to-dig cross-check record | Site Engineer | Before each setup |
| 67 | Concrete Mix & Material Quality | Admixture dosage verified against approved mix design | Batch plant printout cross-checked with mix design | QA/QC Engineer | Each truck load |
| 68 | Concrete Mix & Material Quality | Ambient/concrete temperature controls applied for hot weather pours | Hot weather concreting checklist completed | QA/QC Engineer | Each pour during summer months |
| 69 | Pumping Operation Controls | Concrete placement rate coordinated with formwork design capacity | Pour rate log compared against formwork design limit | Site Engineer | Continuous during pumping |
| 70 | Pumping Operation Controls | Vibration equipment used correctly to avoid segregation | Toolbox talk record on correct vibration technique | Site Supervisor | Each pour |
| 71 | Housekeeping & Environmental Controls | Dust/noise levels from pump engine monitored within permissible limits | Noise/dust monitoring log for pump operation | Environmental Officer | Each pour day |
| 72 | PPE & Personnel Safety Around Pumping | Hearing protection provided in high-noise zones near pump engine | PPE issue record and spot check | HSE Officer | Each pour |
| 73 | Emergency Preparedness for Pumping Operations | Muster point and evacuation route communicated for pour location | Toolbox talk record confirming muster point awareness | HSE Officer | Before each pour |
| 74 | Post-Pour Inspection & Documentation | Formwork/falsework inspected for deflection or leakage during and after pour | Formwork inspection checklist completed | Site Engineer | During and after each pour |
| 75 | Line Pump (Trailer/Static) Specific Controls | Pump towing hitch and safety chain inspected before road transport | Pre-transport inspection checklist | Driver | Before each transport |
| 76 | Boom Pump Specific Controls | Boom pump positioned with adequate clearance from excavation edges | Ground clearance verification record | Site Engineer | Each setup |
| 77 | Traffic & Access Control at Pumping Location | Concrete truck drivers briefed on site-specific traffic rules | Induction/briefing record for delivery drivers | HSE Officer | Prior to first delivery, refreshed periodically |
| 78 | Working at Height Interface (Elevated Pours) | Rescue plan established for work at height during elevated pours | Documented rescue plan reviewed and briefed to crew | HSE Manager | Before each elevated pour |
| 79 | Monitoring, Audit & Continual Improvement | Concrete pump operator refresher training tracked and current | Training matrix showing refresher completion dates | Training Coordinator | Every 2 years |
| 80 | Pump & Equipment Certification | Pump engine/power unit fire suppression system inspected where fitted | Inspection tag verified against current month | HSE Officer | Monthly |
| 81 | Pre-Pumping Setup & Positioning | Weather forecast checked for lightning/high wind risk before setup | Weather advisory log reviewed prior to setup | HSE Officer | Before each pour |
| 82 | Concrete Mix & Material Quality | Retarder/accelerator use approved by QA/QC before addition on site | Site addition approval record signed by QA/QC | QA/QC Engineer | As required, each occurrence |
| 83 | Pumping Operation Controls | Two-way radio communication tested between operator and batching plant | Radio check log before pumping starts | Pump Operator | Before each pour |
| 84 | Housekeeping & Environmental Controls | Concrete residue removed from public roads adjacent to site | Road cleanliness inspection log | Site Supervisor | After each pour |
| 85 | PPE & Personnel Safety Around Pumping | Barrier cream/skin protection provided to placing crew | PPE issue record verified against crew list | HSE Officer | Each pour |
| 86 | Emergency Preparedness for Pumping Operations | Nearest hospital/medical facility route identified for pour location | Emergency route map displayed at site office | HSE Officer | Reviewed monthly |
| 87 | Post-Pour Inspection & Documentation | Pump hire/rental agreement includes valid insurance and liability coverage | Insurance certificate reviewed against rental agreement | Procurement Officer | Prior to mobilization |
| 88 | Traffic & Access Control at Pumping Location | Delivery truck turnaround time monitored to minimize idling/congestion | Truck turnaround log reviewed for delays | Site Supervisor | Each pour day |
Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.