Part H — High-Risk Works

Concrete pumping

Workbook section 84
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plans TOC - Part H; H - Concrete Pumping Controls; Plan H84 Concrete Pouring Pumpi
Checkpoints
88
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Pump & Equipment CertificationConcrete pump third-party inspection certificate validCurrent TPI certificate displayed on pump unitHSE OfficerPrior to use, per validity
2Pump & Equipment CertificationBoom pump load chart and slew radius chart availableLoad chart legible and mounted in operator cabHSE OfficerPrior to use
3Pump & Equipment CertificationPipeline, clamps and couplings rated for pumping pressureManufacturer rating verified against pump specification sheetSite EngineerPrior to each setup
4Pump & Equipment CertificationSafety pins and clamps inspected for wear/damageVisual inspection checklist completed before assemblyPump OperatorDaily before pumping
5Pump & Equipment CertificationOutrigger pads and ground bearing capacity verifiedGround bearing pressure calculation matched to outrigger loadSite EngineerPrior to boom set-up
6Pump & Equipment CertificationHydraulic hoses and fittings inspected for leaks/damageVisual inspection log with no leaks/damage recordedPump OperatorDaily
7Pump & Equipment CertificationPump operator competency certificate validCertified operator license copy on fileHSE OfficerPrior to assignment, per validity
8Pre-Pumping Setup & PositioningPump positioned on stable, level ground clear of excavationsGround survey/visual check recorded before setupSite EngineerEach setup
9Pre-Pumping Setup & PositioningOutriggers fully extended and locked as per manufacturer specOutrigger deployment checklist signed by operatorPump OperatorEach setup
10Pre-Pumping Setup & PositioningOverhead power line clearance assessed for boom pumpClearance distance measured against DEWA safe distance tableHSE OfficerPrior to each boom setup
11Pre-Pumping Setup & PositioningExclusion zone established around pump base and boom swing radiusBarricading and signage inspection recordHSE OfficerEach setup
12Pre-Pumping Setup & PositioningPipeline route inspected and secured along placement pathPipeline support/anchoring checklist completedSite SupervisorEach setup
13Pre-Pumping Setup & PositioningCommunication method between operator, banksman and placer confirmedRadio check/hand signal briefing recordPump OperatorBefore each pour
14Concrete Mix & Material QualityApproved concrete mix design verified against pour requirementMix design approval document matched to delivery ticketQA/QC EngineerEach pour
15Concrete Mix & Material QualityDelivery ticket details checked (batch time, mix code, quantity)Delivery ticket cross-checked against approved mixSite EngineerEach truck load
16Concrete Mix & Material QualitySlump test conducted and within specified toleranceSlump test result recorded on QA formQA/QC EngineerEvery truck / per batch
17Concrete Mix & Material QualityConcrete temperature checked against specification limitsTemperature reading logged on QA formQA/QC EngineerEach truck load
18Concrete Mix & Material QualityTest cubes cast for compressive strength verificationCube casting record with sample ID and curing logQA/QC EngineerPer pour, per code requirement
19Concrete Mix & Material QualityConcrete discharged within permissible time from batchingTime log comparing batching time to discharge timeSite EngineerEach truck load
20Pumping Operation ControlsPump primed correctly to prevent blockage/blowbackPriming procedure checklist completed by operatorPump OperatorBefore each pour start
21Pumping Operation ControlsBoom movement restricted to rated working envelopeOperator log confirming boom within rated radius/heightPump OperatorContinuous during pumping
22Pumping Operation ControlsNo personnel positioned under boom or in line of pipe whip zoneExclusion zone monitoring log by supervisorSite SupervisorContinuous during pumping
23Pumping Operation ControlsPump pressure monitored and kept within safe operating limitsPressure gauge readings logged during pumpingPump OperatorEvery 30 minutes during pumping
24Pumping Operation ControlsBlockage clearing procedure followed with pressure released firstDocumented blockage-clearing procedure with sign-offPump OperatorAs required, procedure on file
25Pumping Operation ControlsEnd hose/whip hose secured and controlled by trained placerPlacer competency record and hose control observationSite SupervisorContinuous during pumping
26Pumping Operation ControlsWind speed monitored for boom pump operation limitsWind speed log against manufacturer operating limitHSE OfficerEvery 2 hours during pumping
27Housekeeping & Environmental ControlsConcrete washout area designated and lined to prevent contaminationWashout pit inspection record with containment verifiedHSE OfficerEach pour
28Housekeeping & Environmental ControlsSpilled concrete/slurry cleaned up immediatelyHousekeeping inspection log post-pourSite SupervisorAfter each pour
29Housekeeping & Environmental ControlsWastewater/wash water disposed per environmental permitWaste disposal manifest/record retainedEnvironmental OfficerEach pour
30Housekeeping & Environmental ControlsPump and mixer trucks cleaned in designated wash-down area onlyWash-down area usage logSite SupervisorEach pour
31PPE & Personnel Safety Around PumpingPPE (helmet, boots, gloves, eye protection) worn by all crewPPE compliance spot-check logHSE OfficerContinuous / daily
32PPE & Personnel Safety Around PumpingHigh-visibility vest worn by placer and banksman near pipelineVisual compliance check recordedHSE OfficerDaily
33PPE & Personnel Safety Around PumpingFace shield/goggles used when handling high-pressure end hosePPE issue record and spot checkSite SupervisorDuring pumping
34PPE & Personnel Safety Around PumpingSkin contact with wet concrete minimized with appropriate gloves/PPEToolbox talk record on cement dermatitis preventionHSE OfficerPrior to each pour, refreshed monthly
35Emergency Preparedness for Pumping OperationsEmergency stop function tested and accessible on pump control panelE-stop function test recorded before each pourPump OperatorBefore each pour
36Emergency Preparedness for Pumping OperationsEmergency shutdown/blockage procedure communicated to crewToolbox talk attendance record on emergency procedureHSE OfficerBefore each pour
37Emergency Preparedness for Pumping OperationsFirst aid kit and eye wash station available at pour locationInventory checklist verified against stock listHSE OfficerEach pour day
38Emergency Preparedness for Pumping OperationsFire extinguisher available near pump unitInspection tag checked and extinguisher accessibleHSE OfficerWeekly
39Post-Pour Inspection & DocumentationPump and pipeline decommissioned and cleaned after pour completionPost-pour equipment checklist signed offPump OperatorAfter each pour
40Post-Pour Inspection & DocumentationPour record completed with quantity, time and location detailsConcrete pour record sheet completed and filedSite EngineerEach pour
41Post-Pour Inspection & DocumentationNon-conformances during pumping documented and closed outNCR log with closure evidenceQA/QC EngineerAs required, reviewed weekly
42Post-Pour Inspection & DocumentationCuring method applied immediately after finishing per specificationCuring compound/cover application recordSite SupervisorImmediately after pour
43Line Pump (Trailer/Static) Specific ControlsLine pump hopper grate/safety guard in place and securedVisual inspection confirming grate secured before startPump OperatorBefore each pour
44Line Pump (Trailer/Static) Specific ControlsDelivery pipeline supported at correct intervals to prevent whipPipeline support spacing checked against manufacturer guideSite EngineerEach setup
45Line Pump (Trailer/Static) Specific ControlsReducer/cleaning ball trap fitted and rated for line pressureVisual inspection of ball trap fitting and ratingPump OperatorEach setup
46Line Pump (Trailer/Static) Specific ControlsRemote control unit battery and function checked before useRemote control function test logPump OperatorBefore each pour
47Boom Pump Specific ControlsBoom unfolding sequence followed per manufacturer procedureBoom deployment checklist signed by operatorPump OperatorEach setup
48Boom Pump Specific ControlsBoom tip hose (rubber end hose) length and condition checkedVisual inspection of end hose length and wearPump OperatorBefore each pour
49Boom Pump Specific ControlsAnti-two-block/boom angle limiter functionalFunction test recorded on pre-use checklistPump OperatorBefore each pour
50Boom Pump Specific ControlsTurntable and slewing ring inspected for wear/playMechanical inspection log per maintenance scheduleMaintenance EngineerMonthly
51Traffic & Access Control at Pumping LocationConcrete truck queuing/access route managed to avoid congestionTraffic management diagram for pour day reviewedSite SupervisorEach pour day
52Traffic & Access Control at Pumping LocationBanksman deployed to guide concrete trucks into positionDeployment record and observation logHSE OfficerEach pour
53Traffic & Access Control at Pumping LocationPedestrian access restricted within pump exclusion zoneBarricade and signage inspection recordHSE OfficerEach pour
54Traffic & Access Control at Pumping LocationReversing concrete trucks guided by banksman with clear signalsToolbox talk record on truck reversing signalsHSE OfficerEach pour
55Working at Height Interface (Elevated Pours)Placer working platform/scaffold inspected and tagged before pourScaffold inspection tag valid and displayedScaffold InspectorBefore each pour
56Working at Height Interface (Elevated Pours)Fall protection (harness/guardrails) used by placer at heightPPE/anchor point inspection checklistHSE OfficerBefore each pour
57Working at Height Interface (Elevated Pours)Pipeline securely fixed to structure to prevent dislodgement during pour at heightPipeline anchorage inspection checklistSite EngineerEach setup
58Working at Height Interface (Elevated Pours)Material/tool drop prevention measures in place at elevated pour locationToolbox talk record on dropped object preventionHSE OfficerBefore each pour
59Monitoring, Audit & Continual ImprovementMonthly concrete pumping safety audit conductedCompleted audit report with closed-out findingsHSE ManagerMonthly
60Monitoring, Audit & Continual ImprovementPump maintenance records reviewed for compliance with scheduleMaintenance log reviewed against OEM scheduleMaintenance EngineerMonthly
61Monitoring, Audit & Continual ImprovementIncidents/near-misses during pumping investigated and trendedInvestigation report and trend analysis in HSE meeting minutesHSE ManagerMonthly
62Monitoring, Audit & Continual ImprovementLessons learned from pours shared in toolbox talksToolbox talk record referencing lessons learnedHSE OfficerMonthly
63Pump & Equipment CertificationPump chassis and mounting bolts inspected for structural integrityStructural inspection checklist per maintenance scheduleMaintenance EngineerMonthly
64Pump & Equipment CertificationEmergency stop cables/buttons accessible at multiple pump locationsFunction test log for all e-stop pointsPump OperatorBefore each pour
65Pre-Pumping Setup & PositioningAccess/egress route for pump vehicle to site verified clearSite access route inspection recordSite SupervisorEach setup
66Pre-Pumping Setup & PositioningUnderground services (utilities) location verified before outrigger deploymentUtility survey/permit-to-dig cross-check recordSite EngineerBefore each setup
67Concrete Mix & Material QualityAdmixture dosage verified against approved mix designBatch plant printout cross-checked with mix designQA/QC EngineerEach truck load
68Concrete Mix & Material QualityAmbient/concrete temperature controls applied for hot weather poursHot weather concreting checklist completedQA/QC EngineerEach pour during summer months
69Pumping Operation ControlsConcrete placement rate coordinated with formwork design capacityPour rate log compared against formwork design limitSite EngineerContinuous during pumping
70Pumping Operation ControlsVibration equipment used correctly to avoid segregationToolbox talk record on correct vibration techniqueSite SupervisorEach pour
71Housekeeping & Environmental ControlsDust/noise levels from pump engine monitored within permissible limitsNoise/dust monitoring log for pump operationEnvironmental OfficerEach pour day
72PPE & Personnel Safety Around PumpingHearing protection provided in high-noise zones near pump enginePPE issue record and spot checkHSE OfficerEach pour
73Emergency Preparedness for Pumping OperationsMuster point and evacuation route communicated for pour locationToolbox talk record confirming muster point awarenessHSE OfficerBefore each pour
74Post-Pour Inspection & DocumentationFormwork/falsework inspected for deflection or leakage during and after pourFormwork inspection checklist completedSite EngineerDuring and after each pour
75Line Pump (Trailer/Static) Specific ControlsPump towing hitch and safety chain inspected before road transportPre-transport inspection checklistDriverBefore each transport
76Boom Pump Specific ControlsBoom pump positioned with adequate clearance from excavation edgesGround clearance verification recordSite EngineerEach setup
77Traffic & Access Control at Pumping LocationConcrete truck drivers briefed on site-specific traffic rulesInduction/briefing record for delivery driversHSE OfficerPrior to first delivery, refreshed periodically
78Working at Height Interface (Elevated Pours)Rescue plan established for work at height during elevated poursDocumented rescue plan reviewed and briefed to crewHSE ManagerBefore each elevated pour
79Monitoring, Audit & Continual ImprovementConcrete pump operator refresher training tracked and currentTraining matrix showing refresher completion datesTraining CoordinatorEvery 2 years
80Pump & Equipment CertificationPump engine/power unit fire suppression system inspected where fittedInspection tag verified against current monthHSE OfficerMonthly
81Pre-Pumping Setup & PositioningWeather forecast checked for lightning/high wind risk before setupWeather advisory log reviewed prior to setupHSE OfficerBefore each pour
82Concrete Mix & Material QualityRetarder/accelerator use approved by QA/QC before addition on siteSite addition approval record signed by QA/QCQA/QC EngineerAs required, each occurrence
83Pumping Operation ControlsTwo-way radio communication tested between operator and batching plantRadio check log before pumping startsPump OperatorBefore each pour
84Housekeeping & Environmental ControlsConcrete residue removed from public roads adjacent to siteRoad cleanliness inspection logSite SupervisorAfter each pour
85PPE & Personnel Safety Around PumpingBarrier cream/skin protection provided to placing crewPPE issue record verified against crew listHSE OfficerEach pour
86Emergency Preparedness for Pumping OperationsNearest hospital/medical facility route identified for pour locationEmergency route map displayed at site officeHSE OfficerReviewed monthly
87Post-Pour Inspection & DocumentationPump hire/rental agreement includes valid insurance and liability coverageInsurance certificate reviewed against rental agreementProcurement OfficerPrior to mobilization
88Traffic & Access Control at Pumping LocationDelivery truck turnaround time monitored to minimize idling/congestionTruck turnaround log reviewed for delaysSite SupervisorEach pour day

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.