Formwork, falsework and temporary works

Workbook section 77
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plans TOC - Part H; H - Temporary Works Controls; Plan H77 Formwork Falsework and; L - Formwork Falsework Checklis; Plan L144 Formwork Falsework In
Checkpoints
88
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Design & Engineering ApprovalFormwork and falsework design approved by qualified structural engineerInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
2Design & Engineering ApprovalDesign loading calculations account for concrete pour rate and vibration effectsInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
3Design & Engineering ApprovalTemporary works design register maintained and cross-referenced to drawingsInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
4Design & Engineering ApprovalCategory 3 temporary works independently checked prior to constructionInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
5Design & Engineering ApprovalFormwork drawings issued for construction match approved design revisionInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
6Design & Engineering ApprovalGround bearing capacity assessment completed for falsework foundation loadsInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
7Design & Engineering ApprovalWind loading and lateral stability calculations included in design packageInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
8Design & Engineering ApprovalDesign changes formally reviewed and re-approved before implementationInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
9Design & Engineering ApprovalFormwork pressure calculations reviewed against concrete mix design usedInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
10Design & Engineering ApprovalDesign assumptions validated against actual site ground conditionsInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
11Design & Engineering ApprovalAlternative/proprietary system substitution approved by design engineerInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
12Temporary Works CoordinationTemporary Works Coordinator (TWC) appointed and responsibilities definedInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
13Temporary Works CoordinationTemporary Works Supervisor (TWS) assigned on site for each activityInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
14Temporary Works CoordinationPermit to load/strike issued by TWC before proceeding with next stageInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
15Temporary Works CoordinationTemporary works register updated with status of each element on siteInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
16Temporary Works CoordinationInterface between permanent and temporary works reviewed and agreedInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
17Temporary Works CoordinationDesign brief and check certificate available at point of erectionInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
18Temporary Works CoordinationNon-conformances on temporary works closed out before further loadingInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
19Temporary Works CoordinationTemporary works coordination meeting held at defined project intervalsInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
20Temporary Works CoordinationTemporary works design changes communicated to all affected tradesInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
21Temporary Works CoordinationHandover of temporary works responsibility documented between shiftsInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
22Temporary Works CoordinationTemporary works risk register reviewed and updated periodicallyInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
23Materials & Equipment CertificationFormwork panels and system components inspected for damage before useInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
24Materials & Equipment CertificationFalsework standards, ledgers and jacks certified and load ratedInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
25Materials & Equipment CertificationProprietary system components used only as per manufacturer's certificationInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
26Materials & Equipment CertificationTie rods, wing nuts and waler clamps checked for wear and corrosionInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
27Materials & Equipment CertificationPlywood/steel formwork release agent applied per manufacturer instructionsInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
28Materials & Equipment CertificationScaffold tube and coupler materials verified against test certificatesInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
29Materials & Equipment CertificationBase plates and sole boards used to distribute falsework loads adequatelyInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
30Materials & Equipment CertificationDamaged or non-conforming formwork/falsework components removed from useInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
31Materials & Equipment CertificationFormwork oil/release agent stock checked for expiry and suitabilityInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
32Materials & Equipment CertificationFalsework component traceability maintained via tagging systemInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
33Materials & Equipment CertificationThird-party test certificates available for critical load-bearing componentsInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
34Erection & AssemblyFormwork erected strictly in accordance with approved drawingsInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
35Erection & AssemblyFalsework erected by trained and competent scaffolders/riggersInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
36Erection & AssemblyVertical and horizontal alignment of formwork checked using survey instrumentsInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
37Erection & AssemblyBracing and cross-bracing installed as per design to resist lateral loadsInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
38Erection & AssemblyFormwork joints sealed to prevent grout leakage during concrete pourInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
39Erection & AssemblyFalsework base secured against sliding, settlement and upliftInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
40Erection & AssemblyWorking platforms and access provided for safe formwork erectionInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
41Erection & AssemblyErection sequence follows method statement to maintain stability at all stagesInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
42Erection & AssemblyFormwork edge protection installed concurrently with erectionInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
43Erection & AssemblyAccess ladders and platforms secured before formwork loadingInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
44Erection & AssemblyErection crew briefed on load sequence and stability requirementsInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
45Inspection Before Concrete PourFormwork inspection checklist completed and signed prior to pour approvalInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
46Inspection Before Concrete PourReinforcement cover, spacing and cleanliness verified before formwork closureInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
47Inspection Before Concrete PourFormwork dimensions and levels checked against structural drawingsInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
48Inspection Before Concrete PourAll ties, props and bracing confirmed tight and secure before pourInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
49Inspection Before Concrete PourFalsework foundation and ground conditions re-checked prior to loadingInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
50Inspection Before Concrete PourPermit to pour issued only after independent inspection sign-offInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
51Inspection Before Concrete PourEmbedded services and cast-in items verified in correct positionInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
52Inspection Before Concrete PourFormwork cleanliness confirmed free of debris, water and foreign materialInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
53Inspection Before Concrete PourIndependent temporary works check completed for critical formwork elementsInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
54Inspection Before Concrete PourFormwork tolerance checks conducted against project specificationInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
55Inspection Before Concrete PourSign-off checklist retained as record prior to pour commencementInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
56Concrete Pouring & MonitoringConcrete placement rate controlled to remain within design pressure limitsInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
57Concrete Pouring & MonitoringFormwork and falsework monitored continuously during concrete placementInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
58Concrete Pouring & MonitoringVibration of concrete controlled to avoid overloading formwork panelsInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
59Concrete Pouring & MonitoringMovement or deflection of falsework observed and recorded during pourInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
60Concrete Pouring & MonitoringConcrete pour sequence follows plan to balance loading across falseworkInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
61Concrete Pouring & MonitoringEmergency stop procedure defined if excessive movement detected during pourInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
62Concrete Pouring & MonitoringPour card/checklist completed recording start, finish and observationsInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
63Concrete Pouring & MonitoringTrained banksman present to monitor formwork integrity during pumpingInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
64Concrete Pouring & MonitoringCommunication protocol established between pump operator and formwork monitorInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
65Concrete Pouring & MonitoringConcrete temperature and slump checked to avoid excess formwork pressureInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
66Concrete Pouring & MonitoringPost-pour inspection conducted to confirm no formwork displacement occurredInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
67Striking & DismantlingFormwork striking time complies with concrete strength/curing requirementsInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
68Striking & DismantlingCube test results reviewed and approved before striking soffit formworkInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
69Striking & DismantlingStriking sequence follows approved method to avoid shock loadingInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
70Striking & DismantlingFalsework dismantled progressively under supervision of competent personInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
71Striking & DismantlingBackpropping installed and maintained as per design requirements after strikingInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
72Striking & DismantlingStruck formwork inspected, cleaned and stored for reuse or disposalInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
73Striking & DismantlingPermit to strike signed off by temporary works coordinator before dismantlingInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
74Striking & DismantlingArea below striking works barricaded and access restricted during dismantlingInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
75Striking & DismantlingFalsework strike plan reviewed against actual curing conditions on siteInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
76Striking & DismantlingDismantled components inspected for reuse suitability before storageInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
77Striking & DismantlingRecords of striking times maintained against approved permitInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
78Site Safety & HousekeepingFalsework working areas kept clear of debris and trip hazardsInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
79Site Safety & HousekeepingEdge protection and guardrails installed on elevated formwork platformsInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
80Site Safety & HousekeepingFall arrest systems used where guardrails cannot be providedInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required
81Site Safety & HousekeepingFalsework exclusion zone maintained during erection, pouring and strikingInspection record / checklist / sign-off confirming compliance with the above requirementSite EngineerDaily
82Site Safety & HousekeepingDaily visual inspection of formwork/falsework conducted before shift startInspection record / checklist / sign-off confirming compliance with the above requirementHSE OfficerBefore each use
83Site Safety & HousekeepingPPE compliance verified for all personnel working on formwork operationsInspection record / checklist / sign-off confirming compliance with the above requirementTemporary Works CoordinatorWeekly
84Site Safety & HousekeepingWeather conditions (wind, rain) assessed before high-level formwork activitiesInspection record / checklist / sign-off confirming compliance with the above requirementStructural EngineerPer pour/activity
85Site Safety & HousekeepingToolbox talk delivered on formwork/falsework specific hazards before task startInspection record / checklist / sign-off confirming compliance with the above requirementSite SupervisorOnce (pre-start)
86Site Safety & HousekeepingFalsework storage area organized to prevent trip and stacking hazardsInspection record / checklist / sign-off confirming compliance with the above requirementProject ManagerPer shift
87Site Safety & HousekeepingNoise and vibration exposure of crew monitored during dismantlingInspection record / checklist / sign-off confirming compliance with the above requirementForemanMonthly
88Site Safety & HousekeepingHousekeeping audit conducted after each formwork/falsework activityInspection record / checklist / sign-off confirming compliance with the above requirementSafety OfficerAs required

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.