Part G — Equipment & Plant

Equipment inspection and colour coding

Workbook section 60
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plans TOC - Part G; Plan K125 Equipment Inspection ; E - Equipment Inspection Regist; Plan G60 Equipment Inspection C
Checkpoints
88
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Colour coding system administrationColour code chart references cross-checked with civil defence and municipality guidance for the emirate of operationReference document attached to colour coding procedureHSE ManagerAnnually
2Colour coding system administrationNewly mobilised equipment tagged with current colour immediately on arrival at site gate before entry to work areasGate inspection log with tag colour recordedSecurity/HSE OfficerOn arrival
3Colour coding system administrationColour coding audit conducted across all equipment yards to detect mismatched or missing tagsAudit checklist with equipment ID and tag statusHSE OfficerMonthly
4Colour coding system administrationHandover of colour coding scheme to incoming shift/subcontractor HSE personnel documentedShift handover log referencing colour schemeHSE OfficerWeekly
5Lifting equipment inspection (LOLER-style regime)Register of lifting equipment includes unique identification number, SWL, manufacture date and last examination dateRegister entry reviewed for completeness per itemHSE ManagerMonthly
6Lifting equipment inspection (LOLER-style regime)Wire rope slings inspected for broken wires, kinking and corrosion against discard criteriaSling inspection checklist with discard criteria referenceRiggerWeekly
7Lifting equipment inspection (LOLER-style regime)Below-the-hook lifting devices (spreader beams, lifting beams) load tested and certified before first useLoad test certificate on fileThird Party InspectorBefore first use
8Lifting equipment inspection (LOLER-style regime)Chain slings inspected for stretch, twisted links and damaged hooks with safety latches intactChain sling inspection checklistRiggerWeekly
9Lifting equipment inspection (LOLER-style regime)Competent person examination reports reviewed by HSE Manager and action items tracked to closureReport review sign-off and action trackerHSE ManagerPer examination
10Mobile and tower crane inspectionCrane foundation/base design and ground bearing capacity verified by structural engineer before erectionFoundation design certificate and ground bearing test resultStructural EngineerBefore erection
11Mobile and tower crane inspectionMobile crane outrigger pads and ground conditions checked and confirmed adequate before each set-upGround bearing check recorded on lift planCrane OperatorBefore each set-up
12Mobile and tower crane inspectionRadio communication between crane operator, banksman and rigger tested functional before lift commencesRadio check logLifting SupervisorBefore each lift
13Mobile and tower crane inspectionTower crane tie-in/collar connections inspected and certified after each climbing operationTie-in inspection certificateLifting EngineerPer climb
14Mobile and tower crane inspectionCrane exclusion zone maintained beneath the slew radius with barricading and signage during operationExclusion zone inspection recordBanksmanDaily
15Mobile and tower crane inspectionMultiple crane operations within overlapping working radii covered by an anti-collision procedureAnti-collision procedure and radio protocol documentLifting SupervisorBefore dual operations
16Excavators, loaders and earthmoving equipmentFire extinguisher mounted, accessible and within inspection date on all mobile plantExtinguisher inspection tag checkPlant OperatorMonthly
17Excavators, loaders and earthmoving equipmentBucket teeth and cutting edges inspected for wear or looseness that could detach during operationInspection checklist item recordedPlant OperatorDaily
18Excavators, loaders and earthmoving equipmentOperator cabin glazing intact and mirrors clean, providing full visibility of work areaVisual inspection checklistPlant OperatorDaily
19Excavators, loaders and earthmoving equipmentAttachment quick-hitch coupler function-tested with visual confirmation of full engagement before each useCoupler engagement test logPlant OperatorBefore each attachment change
20Excavators, loaders and earthmoving equipmentMobile plant excluded from proximity to overhead power lines unless safe clearance distance confirmedProximity permit / clearance distance recordSite EngineerBefore deployment
21Excavators, loaders and earthmoving equipmentRefuelling of mobile plant conducted in designated bunded area with spill kit availableRefuelling area inspection and spill kit checkPlant OperatorDaily
22Power tools and portable electrical equipmentTemporary distribution boards inspected for correct fusing, labelling and enclosure integrityDistribution board inspection checklistElectrical SupervisorWeekly
23Power tools and portable electrical equipmentBattery-operated cordless tools inspected for charger condition and battery casing damage before usePre-use inspection checklistWorkerDaily
24Power tools and portable electrical equipmentCircular saws and cut-off machines fitted with correctly rated blade guards prior to issueIssue checklist with guard verificationTool Store KeeperBefore issue
25Power tools and portable electrical equipmentVoltage of power tools matched to site electrical supply (110V on construction sites where mandated)Tool voltage rating check against site supplyElectrical SupervisorBefore issue
26Scaffolding and access equipmentScaffold base plates, sole boards and standards inspected for correct bearing on stable groundScaffold inspection checklist entryScaffold InspectorWeekly
27Scaffolding and access equipmentWorking platforms fitted with toe boards, guardrails and mid-rails at all open edgesEdge protection inspection recordScaffold InspectorWeekly
28Scaffolding and access equipmentScaffold ties and bracing verified against approved scaffold design drawingDesign drawing cross-check during inspectionScaffold InspectorWeekly
29Scaffolding and access equipmentPodium steps and platform ladders inspected for locking mechanism function and stability before usePre-use inspection checklistUserDaily
30Scaffolding and access equipmentSuspended/rope access equipment inspected and certified by competent person before deploymentSuspended access inspection certificateThird Party InspectorBefore deployment
31Pressure vessels, compressors and gas equipmentCompressor hoses and quick-release couplings secured with whip-check restraintsWhip-check installation inspectionHSE OfficerWeekly
32Pressure vessels, compressors and gas equipmentGas cylinder trolleys used for transport with cylinders chained upright during movementTransport method observationWorkerAs required
33Pressure vessels, compressors and gas equipmentNitrogen and inert gas cylinders stored separately from flammable gas cylinders with clear signageStorage segregation inspectionHSE OfficerWeekly
34Pressure vessels, compressors and gas equipmentCompressor safety valve set pressure verified against vessel design pressure during statutory inspectionStatutory inspection certificate detail checkThird Party InspectorAnnually
35Records, tagging system and equipment registersEquipment inspection KPIs (percentage in-date, overdue items) reported to project management monthlyKPI dashboard/reportHSE ManagerMonthly
36Records, tagging system and equipment registersBarcode/QR-based equipment tracking system, where deployed, reconciled against physical asset countReconciliation reportHSE OfficerMonthly
37Records, tagging system and equipment registersEquipment demobilised from site has final inspection record closed out and archivedDemobilisation checklist and archive confirmationDocument ControllerUpon demobilisation
38Records, tagging system and equipment registersInsurance/third-party liability certificates for major plant items current and filed with equipment registerInsurance certificate copy on fileHSE ManagerAnnually
39Records, tagging system and equipment registersRandom equipment inspection audit conducted jointly with client/consultant representativeJoint audit report with findingsHSE ManagerQuarterly
40Welding, cutting and hot work equipmentWelding machines inspected for earth cable continuity and cable insulation condition before usePre-use inspection checklistWelderDaily
41Welding, cutting and hot work equipmentHot work permit issued and equipment condition verified before commencing welding or grinding activityHot work permit with equipment checklist attachedHSE OfficerBefore hot work
42Welding, cutting and hot work equipmentFire watch equipped with appropriate extinguisher positioned during and after hot work per permit durationFire watch log and extinguisher checkFire WatcherDuring/after hot work
43Concrete and material handling equipmentConcrete pump boom and hopper inspected for structural cracks, hydraulic leaks and pipe clamp integrity before usePre-use inspection checklistPump OperatorDaily
44Concrete and material handling equipmentConcrete mixer trucks inspected for drum condition, chute security and reversing alarm functionPre-use inspection checklistDriver/OperatorDaily
45Concrete and material handling equipmentTower crane and hoist material skips inspected for structural integrity, latch mechanism and load markingsSkip inspection checklistRiggerWeekly
46Concrete and material handling equipmentPassenger/material hoists inspected and certified by competent person with interlocks tested functionalHoist inspection certificate and interlock test recordThird Party InspectorMonthly
47Colour coding system administrationSite-wide colour coding scheme for equipment inspection established on a quarterly rotation basisColour coding procedure document with current quarter colour identifiedHSE ManagerQuarterly
48Colour coding system administrationCurrent inspection colour prominently displayed on notice boards and equipment yardsPhotograph of posted colour code chartHSE OfficerQuarterly
49Colour coding system administrationColour tags/tape applied to equipment matches the current valid quarter colour onlySpot check of tag colour vs published schemeHSE OfficerWeekly
50Colour coding system administrationEquipment bearing expired colour code removed from service until re-inspected and re-taggedRemoval from service log / tag replacement recordSite SupervisorWeekly
51Colour coding system administrationColour code inspection register cross-referenced with third-party inspection certificates for lifting equipmentRegister reconciled against LOLER-equivalent certificationHSE OfficerMonthly
52Lifting equipment inspection (LOLER-style regime)All lifting equipment and accessories (slings, shackles, chains) thoroughly examined by competent person at required intervals (6 months for lifting accessories, 12 months for lifting equipment not carrying persons)Thorough examination certificate on file, in-dateThird Party InspectorPer certificate interval
53Lifting equipment inspection (LOLER-style regime)Lifting equipment carrying persons (man-baskets, personnel platforms) examined at 6-monthly intervals minimumExamination certificate specific to personnel-carrying equipmentThird Party Inspector6-Monthly
54Lifting equipment inspection (LOLER-style regime)Safe working load (SWL) or working load limit (WLL) clearly marked and legible on all lifting gearVisual inspection of markingsHSE OfficerWeekly
55Lifting equipment inspection (LOLER-style regime)Lifting accessories with damage (cuts, corrosion, deformation) removed from service immediately and quarantinedQuarantine/scrap log with photographic evidenceRigger/BanksmanDaily
56Lifting equipment inspection (LOLER-style regime)Pre-use visual inspection of slings and shackles conducted by rigger before each liftPre-use inspection checklist signed by riggerRiggerDaily / Before each lift
57Lifting equipment inspection (LOLER-style regime)Lifting plan prepared and approved for critical/tandem lifts, referencing examined equipment certificatesApproved lifting plan documentLifting SupervisorBefore critical lift
58Lifting equipment inspection (LOLER-style regime)Crane and lifting appliance load charts available at the equipment and referenced during lift planningLoad chart present in cab / lift plan attachmentCrane OperatorDaily
59Mobile and tower crane inspectionTower cranes hold valid Dubai Municipality / Trakhees (as applicable) operating permit displayed on sitePermit certificate copy on file and displayed at crane baseHSE ManagerAnnually / per permit validity
60Mobile and tower crane inspectionMobile and tower cranes undergo daily pre-operational checks by operator using OEM checklistDaily pre-use inspection checklist signed by operatorCrane OperatorDaily
61Mobile and tower crane inspectionCrane operators hold valid, applicable competency licence/certificate for equipment class operatedLicence copy verified against equipment typeHSE OfficerBefore deployment
62Mobile and tower crane inspectionAnemometer fitted and functional on tower cranes with wind speed cut-off limits enforcedAnemometer calibration/function check logCrane OperatorDaily
63Mobile and tower crane inspectionCrane erection, climbing and dismantling supervised by competent engineer with method statement in placeMethod statement and supervision sign-offLifting EngineerPer erection/climb
64Mobile and tower crane inspectionLoad moment indicator (LMI) and anti-two-block device tested functional before each shiftFunctional test logCrane OperatorDaily
65Excavators, loaders and earthmoving equipmentHeavy equipment (excavators, loaders, dozers) undergo daily pre-start inspection using OEM checklistPre-start inspection checklist signed by operatorPlant OperatorDaily
66Excavators, loaders and earthmoving equipmentReverse alarms, horns and rotating beacons functional on all mobile plantFunctional check recorded on daily checklistPlant OperatorDaily
67Excavators, loaders and earthmoving equipmentEquipment operators hold valid competency card/licence appropriate to plant typeOperator competency card verificationHSE OfficerBefore deployment
68Excavators, loaders and earthmoving equipmentEquipment colour tag verified current before mobilisation to work frontVisual check by banksman/supervisor before useSite SupervisorDaily
69Excavators, loaders and earthmoving equipmentHydraulic hoses, buckets and attachments inspected for leaks, cracks and wearInspection checklist item recordedPlant OperatorDaily
70Excavators, loaders and earthmoving equipmentSeatbelt and ROPS/FOPS structure present and undamaged on all mobile plantVisual inspection logPlant OperatorDaily
71Power tools and portable electrical equipmentPortable Appliance Testing (PAT) conducted on all portable electrical tools and equipment at scheduled intervalsPAT test label with pass date and next-due date visibleElectrical SupervisorQuarterly
72Power tools and portable electrical equipmentDamaged or untested electrical equipment removed from site immediately and tagged out of serviceTag-out record and equipment removal logHSE OfficerAs found
73Power tools and portable electrical equipmentPower tool guards intact and functional, no bypassing of interlocks or guards observedVisual inspection during site walkHSE OfficerWeekly
74Power tools and portable electrical equipmentExtension cables and reels inspected for insulation damage and correct earthing before usePre-use visual inspectionWorkerDaily
75Power tools and portable electrical equipmentResidual current devices (RCDs) fitted to all temporary power supplies and tested functionalRCD test button check logElectrical SupervisorWeekly
76Scaffolding and access equipmentScaffold inspected and tagged by competent scaffold inspector before first use, weekly thereafter and after adverse weatherScafftag inspection record with date and inspector signatureScaffold InspectorWeekly
77Scaffolding and access equipmentScaffold tag colour system matches current site colour code and indicates safe/incomplete/do-not-use status clearlyScafftag colour and status verified against registerHSE OfficerWeekly
78Scaffolding and access equipmentMobile scaffold towers fitted with outriggers and locked castors before use, inspected before each shiftPre-use checklist for mobile towersUser/SupervisorDaily
79Scaffolding and access equipmentLadders inspected for damage, colour-coded/tagged and free from paint that could hide defectsLadder inspection tag recordHSE OfficerMonthly
80Pressure vessels, compressors and gas equipmentAir compressors and pressure vessels hold valid statutory inspection certificate per local authority requirementPressure vessel certificate on file, in-dateThird Party InspectorAnnually
81Pressure vessels, compressors and gas equipmentGas cylinders (oxygen/acetylene/LPG) stored upright, secured, segregated by type with colour-coded caps intactStorage area inspection checklistHSE OfficerWeekly
82Pressure vessels, compressors and gas equipmentPressure relief valves and gauges on compressed equipment tested functional per maintenance scheduleMaintenance test recordPlant Maintenance TeamQuarterly
83Pressure vessels, compressors and gas equipmentWelding and cutting gas hoses inspected for leaks, cracks and correct flashback arrestors fittedPre-use hose inspection checklistWelderDaily
84Records, tagging system and equipment registersMaster equipment register maintained listing all plant, inspection due dates and current colour code statusEquipment register reviewed and updatedHSE ManagerMonthly
85Records, tagging system and equipment registersThird-party inspection certificates for statutory equipment filed and accessible for audit within 24 hoursDocument control retrieval testDocument ControllerQuarterly
86Records, tagging system and equipment registersNon-conformances from equipment inspections tracked in CAPA log with defined closure timelineCAPA tracker with equipment ID cross-referenceHSE ManagerAs occurs
87Records, tagging system and equipment registersEquipment found without valid colour tag or certificate immediately isolated with danger tag appliedDanger tag/lock-out recordHSE OfficerAs found
88Records, tagging system and equipment registersSubcontractor-owned equipment mobilised to site subject to same colour coding and inspection verification before useMobilisation inspection checklist for subcontractor plantHSE OfficerBefore mobilisation

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.