Plans TOC - Part F; F - Dust Silica Controls; Plan F56 Dust Silica and Airbor
Checkpoints
88
| # | Area | Checkpoint / Requirement | Evidence / Acceptance Criteria | Responsible | Frequency |
|---|---|---|---|---|---|
| 1 | Respirable crystalline silica risk assessment | Silica-containing materials (concrete, sand, sandstone) identified and listed in site material register | Material register with silica content flagged | HSE Officer | Before task start |
| 2 | Respirable crystalline silica risk assessment | Competent person assigned to review and approve silica risk assessments before work commencement | Sign-off record on risk assessment document | HSE Manager | Before task start |
| 3 | Respirable crystalline silica risk assessment | Silica exposure control plan reviewed and updated when task scope or method changes | Revision history of control plan document | HSE Officer | As required |
| 4 | Respirable crystalline silica risk assessment | Occupational hygienist calibrates air sampling pumps before each monitoring campaign per manufacturer spec | Pump calibration certificate | Occupational Hygienist | Per monitoring campaign |
| 5 | Respirable crystalline silica risk assessment | Health surveillance results for silica-exposed workers reviewed by occupational physician with fitness-to-work outcome recorded | Fitness-to-work certificate per worker | Occupational Health Physician | Annually |
| 6 | Respirable crystalline silica risk assessment | Sub-contractors performing dry-cutting works submit their own silica risk assessment for main contractor approval | Approved subcontractor risk assessment on file | HSE Manager | Before task start |
| 7 | Dust suppression - engineering controls | Concrete batching plant fitted with dust extraction/bag filter system on silos and mixing points | Batching plant dust extraction inspection record | Plant Maintenance Team | Monthly |
| 8 | Dust suppression - engineering controls | Water spray system installed at demolition/crushing operations activated continuously during active work | Spray system operational log | Site Engineer | Daily |
| 9 | Dust suppression - engineering controls | Wind direction monitored and dust-generating activities suspended or relocated during high-wind conditions | Weather log cross-referenced with activity stoppage record | Site Supervisor | Daily |
| 10 | Dust suppression - engineering controls | Conveyor transfer points on crushing/screening plant fitted with dust skirts and enclosure panels | Enclosure inspection checklist | Plant Maintenance Team | Monthly |
| 11 | Dust suppression - engineering controls | Sand and cement bag handling/tipping points fitted with local dust capture or performed with minimal drop height | Handling procedure observation record | HSE Officer | Weekly |
| 12 | Administrative controls and work practices | Permit-to-work system includes specific silica control checklist for hot works involving concrete/masonry cutting | Permit-to-work form with silica control section completed | HSE Officer | Before task start |
| 13 | Administrative controls and work practices | Eating, drinking and smoking prohibited in designated dust-exposure zones | Signage and spot-check compliance record | HSE Officer | Daily |
| 14 | Administrative controls and work practices | Contaminated work clothing laundered on-site or bagged separately to prevent take-home silica exposure | Laundry/bagging procedure compliance check | Camp Supervisor | Weekly |
| 15 | Administrative controls and work practices | Silica exposure control plan communicated to workers in their native language during induction | Multilingual induction record with silica module | HSE Officer | Per new joiner |
| 16 | Administrative controls and work practices | Visitors and non-essential personnel excluded from active dust-generating work zones | Access control log for exclusion zones | Security Supervisor | Daily |
| 17 | Respiratory protective equipment (RPE) | RPE issue register maintained recording worker name, RPE type and date of issue | RPE issue register | Storekeeper | Per issue |
| 18 | Respiratory protective equipment (RPE) | Powered air-purifying respirators (PAPR) battery charge verified before each shift for high-exposure tasks | Pre-shift PAPR charge/function check log | Worker | Daily |
| 19 | Respiratory protective equipment (RPE) | RPE training covers correct donning, doffing, seal check and maintenance procedures | RPE training attendance and competency record | HSE Officer | Annually |
| 20 | Respiratory protective equipment (RPE) | Disposable dust masks below required protection factor rejected and removed from site distribution | PPE inspection and non-conforming stock removal record | Storekeeper | Monthly |
| 21 | Vibration exposure - hand-arm vibration (HAV) | Vibration exposure calculator/app used on-site to compute A(8) values for combined tool usage per worker | Exposure calculation printout per worker per shift | HSE Officer | Daily |
| 22 | Vibration exposure - hand-arm vibration (HAV) | Vibration-emitting plant and tools labelled with manufacturer-declared vibration magnitude for reference | Tool label/tag verification during inspection | Plant Maintenance Team | Monthly |
| 23 | Vibration exposure - hand-arm vibration (HAV) | HAVS symptom questionnaire completed by exposed workers as part of periodic health surveillance | Completed questionnaire on file per worker | Occupational Health Physician | Annually |
| 24 | Vibration exposure - hand-arm vibration (HAV) | Whole-body vibration (WBV) risk assessed for operators of compactors, rollers and heavy plant | WBV risk assessment document | HSE Manager | Before task start |
| 25 | Vibration exposure - hand-arm vibration (HAV) | Operator seats on vibration-emitting plant fitted with suspension/damping systems maintained in good condition | Seat suspension inspection record | Plant Maintenance Team | Monthly |
| 26 | HAV control measures and tooling | Records of tool trigger-time exposure retained for minimum statutory period for audit purposes | Archived trigger-time log records | HSE Manager | Ongoing |
| 27 | HAV control measures and tooling | Workers reporting tingling, numbness or finger blanching referred immediately for medical assessment | Incident/referral record for HAVS symptoms | First Aider | As occurs |
| 28 | HAV control measures and tooling | New vibrating tools trialled and vibration data verified before mass deployment on site | Trial evaluation report with vibration data | Procurement/HSE Manager | Before purchase |
| 29 | HAV control measures and tooling | Alternative low-vibration methods (e.g. hydraulic bursting vs pneumatic breaking) evaluated during method statement review | Method statement comparison record | Site Engineer | Before task start |
| 30 | Housekeeping and general dust management | HEPA-filtered vacuum units serviced and filter integrity checked before each use | Vacuum filter inspection log | Plant Maintenance Team | Weekly |
| 31 | Housekeeping and general dust management | Internal building dust levels monitored during finishing works (sanding, grinding) near occupied or handover areas | Internal dust monitoring report | Occupational Hygienist | Monthly |
| 32 | Housekeeping and general dust management | Site perimeter hoarding and windbreak netting maintained to reduce fugitive dust migration off-site | Hoarding/netting condition inspection | Site Supervisor | Weekly |
| 33 | Housekeeping and general dust management | Dust suppression water usage tracked to ensure sustainable water consumption during suppression activities | Water usage log for dust suppression | Environmental Officer | Weekly |
| 34 | Training, records and management review | Toolbox talk log demonstrates recurring coverage of both silica and vibration topics across the workforce | Toolbox talk topic tracker | HSE Officer | Monthly |
| 35 | Training, records and management review | Lessons learned from silica/vibration incidents or near-misses shared across project sites | Lessons learned bulletin distribution record | HSE Manager | As occurs |
| 36 | Training, records and management review | Annual internal audit conducted on silica and vibration exposure control programme effectiveness | Internal audit report with findings and CAPA status | HSE Manager | Annually |
| 37 | Training, records and management review | Occupational exposure and health surveillance data retained in worker medical files for statutory retention period | Medical file retention compliance check | Occupational Health Physician | Ongoing |
| 38 | Training, records and management review | New supervisors and engineers receive silica/vibration control competency briefing during project onboarding | Onboarding competency briefing record | Training Coordinator | Per new joiner |
| 39 | Respirable crystalline silica risk assessment | Silica exposure control plan cross-referenced with project HSE plan and approved by client HSE representative | Client approval signature on control plan | HSE Manager | Before task start |
| 40 | Dust suppression - engineering controls | Dust extraction unit exhaust discharged away from occupied work areas and public walkways | Discharge point layout inspection | HSE Officer | Weekly |
| 41 | Administrative controls and work practices | Dust generating tasks scheduled outside occupied building operating hours where handover areas are adjacent | Work schedule reviewed against occupancy status | Site Engineer | Weekly |
| 42 | Respiratory protective equipment (RPE) | Spare RPE units and filters stocked on-site to prevent workers continuing tasks with defective equipment | Stock inventory record for RPE spares | Storekeeper | Weekly |
| 43 | Vibration exposure - hand-arm vibration (HAV) | Cold weather/AC exposure combined with HAV tool use assessed as compounding risk factor for circulation issues | Combined risk assessment addendum | HSE Officer | Before task start |
| 44 | HAV control measures and tooling | Tool issue counter/hour-meter data reconciled against trigger-time logs for accuracy verification | Reconciliation record between meter data and logs | HSE Officer | Weekly |
| 45 | Housekeeping and general dust management | Dust deposition on fixed plant and structural steel monitored and cleaned to prevent fire loading and slip hazards | Housekeeping inspection checklist for elevated surfaces | Site Supervisor | Weekly |
| 46 | Training, records and management review | Silica and vibration exposure KPIs included in monthly HSE performance report to project management | Monthly HSE report with exposure KPI section | HSE Manager | Monthly |
| 47 | Training, records and management review | External occupational hygiene consultant engaged to independently verify internal exposure monitoring accuracy | Independent verification report | HSE Manager | Annually |
| 48 | Training, records and management review | Corrective actions from silica/vibration audits tracked to closure with verified evidence | CAPA tracker with closure verification | HSE Manager | Monthly |
| 49 | Respirable crystalline silica risk assessment | Silica exposure risk assessment completed for all tasks involving concrete, block, tile or stone cutting/grinding | RCS risk assessment document reference | HSE Manager | Before task start |
| 50 | Respirable crystalline silica risk assessment | Task-specific control measures identified per risk assessment hierarchy: elimination, substitution, engineering, PPE | Control measures section of risk assessment reviewed | HSE Officer | Before task start |
| 51 | Respirable crystalline silica risk assessment | Air monitoring for respirable crystalline silica conducted for high-risk dry-cutting operations | Occupational hygiene monitoring report with RCS results vs OEL | Occupational Hygienist | Quarterly / per campaign |
| 52 | Respirable crystalline silica risk assessment | Exposure results benchmarked against ADOSH-SF occupational exposure limit for RCS (0.025 mg/m3 TWA-8hr) | Monitoring report showing compliance status | HSE Manager | Quarterly / per campaign |
| 53 | Respirable crystalline silica risk assessment | Workers included in health surveillance programme where silica exposure risk identified | Health surveillance enrolment record | Occupational Health Physician | Annually |
| 54 | Dust suppression - engineering controls | Wet cutting method used for concrete, masonry and stone works wherever practicable, with continuous water feed | Method statement specifying wet cutting, water supply verified on site | Site Engineer | Daily |
| 55 | Dust suppression - engineering controls | On-tool local exhaust ventilation (LEV) fitted to grinders and cut-off saws for dry cutting tasks | LEV attachment inspection and airflow check | HSE Officer | Weekly |
| 56 | Dust suppression - engineering controls | LEV/dust extraction units maintained per manufacturer schedule with filter condition checked | Maintenance log and filter replacement record | Plant Maintenance Team | Monthly |
| 57 | Dust suppression - engineering controls | Water bowsers/misting units deployed on haul roads and demolition areas to suppress fugitive dust | Dust suppression deployment log | Site Engineer | Daily |
| 58 | Dust suppression - engineering controls | Enclosed or partially enclosed cutting booths used for repetitive stone/tile cutting operations where feasible | Booth inspection and ventilation check | HSE Officer | Weekly |
| 59 | Dust suppression - engineering controls | Stockpiles of sand, aggregate and spoil covered or sprayed to minimise wind-blown dust | Visual inspection of stockpile covering | Site Supervisor | Daily |
| 60 | Administrative controls and work practices | Dry sweeping of silica-containing dust prohibited; vacuum with HEPA filter or wet methods used instead | Housekeeping method observation | HSE Officer | Daily |
| 61 | Administrative controls and work practices | Job rotation applied to limit individual worker duration of exposure to high-dust tasks | Rotation schedule / task allocation record | Site Supervisor | Daily |
| 62 | Administrative controls and work practices | Exclusion zones established around dry-cutting and demolition dust-generating activities | Barricading and signage inspection | HSE Officer | Daily |
| 63 | Administrative controls and work practices | Silica awareness toolbox talk delivered covering health effects and control measures before task commencement | Toolbox talk attendance record | HSE Officer | Before task start |
| 64 | Administrative controls and work practices | Compressed air blow-down for cleaning dusty surfaces or clothing prohibited on site | Site rule communicated, spot-check compliance | HSE Officer | Weekly |
| 65 | Respiratory protective equipment (RPE) | RPE selected matches assessed exposure level, minimum P2/FFP3 or powered air-purifying respirator for high exposure tasks | RPE selection matrix referenced against exposure assessment | HSE Manager | Before task start |
| 66 | Respiratory protective equipment (RPE) | Face-fit testing conducted for all workers issued tight-fitting RPE, repeated if facial characteristics change | Fit test certificate on file per worker | HSE Officer | Annually / on change |
| 67 | Respiratory protective equipment (RPE) | Workers clean-shaven in RPE seal area to ensure effective face seal | Visual inspection at RPE issue point | Supervisor | Daily |
| 68 | Respiratory protective equipment (RPE) | RPE filters replaced per manufacturer guidance or when breathing resistance increases | Filter change log | Worker / Storekeeper | As required |
| 69 | Respiratory protective equipment (RPE) | RPE stored in clean, sealed containers when not in use, inspected for damage before each use | Pre-use inspection checklist | Worker | Daily |
| 70 | Vibration exposure - hand-arm vibration (HAV) | HAV risk assessment completed for tasks using powered hand tools (breakers, grinders, drills, compactors) | HAV risk assessment document | HSE Manager | Before task start |
| 71 | Vibration exposure - hand-arm vibration (HAV) | Vibration magnitude data obtained from tool manufacturer or measurement used to calculate daily exposure (A(8)) | Tool vibration data sheet / exposure calculation record | HSE Officer | Before task start |
| 72 | Vibration exposure - hand-arm vibration (HAV) | Daily HAV exposure action value (2.5 m/s2 A(8)) and limit value (5.0 m/s2 A(8)) trigger points defined and monitored | Exposure points system (trigger time) tracking sheet | HSE Officer | Daily |
| 73 | Vibration exposure - hand-arm vibration (HAV) | Trigger-time logs maintained per worker to track cumulative daily exposure against limit values | Individual trigger-time log sheet | Site Supervisor | Daily |
| 74 | Vibration exposure - hand-arm vibration (HAV) | Low-vibration tool selection prioritised during procurement for high-frequency-use equipment | Procurement specification referencing vibration limits | Procurement/HSE Manager | Before purchase |
| 75 | HAV control measures and tooling | Anti-vibration gloves and tool handle damping provided for tasks exceeding exposure action value | PPE issue record and glove inspection | Storekeeper | Before task start |
| 76 | HAV control measures and tooling | Job rotation and task time limits applied to keep individual exposure below daily limit value | Rotation roster cross-checked with trigger-time log | Site Supervisor | Daily |
| 77 | HAV control measures and tooling | Powered tools maintained (bearings, mounts, blades) to manufacturer schedule to prevent excess vibration from wear | Tool maintenance/service record | Plant Maintenance Team | Monthly |
| 78 | HAV control measures and tooling | Workers briefed to keep hands warm and avoid excessive grip force to reduce vibration injury risk | Toolbox talk record on HAV mitigation | HSE Officer | Before task start |
| 79 | HAV control measures and tooling | Health surveillance (Tier 1/2 HAVS questionnaire and examination) provided for workers above action value | Health surveillance record | Occupational Health Physician | Annually |
| 80 | Housekeeping and general dust management | Site roads and hard-standing areas swept/vacuumed regularly using dust-suppressing methods | Housekeeping schedule and inspection log | Site Supervisor | Daily |
| 81 | Housekeeping and general dust management | Demolition and cutting waste dampened before loading and transport to prevent dust plumes | Visual check during loading operations | Site Supervisor | Daily |
| 82 | Housekeeping and general dust management | Vehicle wheel washing facility used at site exit to prevent trackout of dust onto public roads | Wheel wash log / photographic record | Environmental Officer | Daily |
| 83 | Housekeeping and general dust management | Dust monitoring at site boundary conducted where works are near sensitive receptors, per EAD/Dubai Municipality requirements | Boundary dust monitoring report (PM10) vs limit | Environmental Consultant | Monthly |
| 84 | Housekeeping and general dust management | Complaints regarding dust nuisance logged, investigated and closed with corrective action | Complaint register and CAPA closure record | Environmental Officer | As occurs |
| 85 | Training, records and management review | Supervisors trained to recognise signs of overexposure to dust and vibration and to escalate concerns | Supervisor training certificate | Training Coordinator | Annually |
| 86 | Training, records and management review | Exposure monitoring records, health surveillance results and control effectiveness reviewed at management level | Management review minutes referencing exposure data | HSE Manager | Quarterly |
| 87 | Training, records and management review | Corrective actions from monitoring results tracked to closure within defined timeframe | CAPA tracker with closure evidence | HSE Manager | As occurs |
| 88 | Training, records and management review | Records of RCS and HAV monitoring retained for minimum statutory period for occupational health records | Document control register showing retention period | Document Controller | Ongoing |
Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.