Checkpoints
88
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Respirable crystalline silica risk assessmentSilica-containing materials (concrete, sand, sandstone) identified and listed in site material registerMaterial register with silica content flaggedHSE OfficerBefore task start
2Respirable crystalline silica risk assessmentCompetent person assigned to review and approve silica risk assessments before work commencementSign-off record on risk assessment documentHSE ManagerBefore task start
3Respirable crystalline silica risk assessmentSilica exposure control plan reviewed and updated when task scope or method changesRevision history of control plan documentHSE OfficerAs required
4Respirable crystalline silica risk assessmentOccupational hygienist calibrates air sampling pumps before each monitoring campaign per manufacturer specPump calibration certificateOccupational HygienistPer monitoring campaign
5Respirable crystalline silica risk assessmentHealth surveillance results for silica-exposed workers reviewed by occupational physician with fitness-to-work outcome recordedFitness-to-work certificate per workerOccupational Health PhysicianAnnually
6Respirable crystalline silica risk assessmentSub-contractors performing dry-cutting works submit their own silica risk assessment for main contractor approvalApproved subcontractor risk assessment on fileHSE ManagerBefore task start
7Dust suppression - engineering controlsConcrete batching plant fitted with dust extraction/bag filter system on silos and mixing pointsBatching plant dust extraction inspection recordPlant Maintenance TeamMonthly
8Dust suppression - engineering controlsWater spray system installed at demolition/crushing operations activated continuously during active workSpray system operational logSite EngineerDaily
9Dust suppression - engineering controlsWind direction monitored and dust-generating activities suspended or relocated during high-wind conditionsWeather log cross-referenced with activity stoppage recordSite SupervisorDaily
10Dust suppression - engineering controlsConveyor transfer points on crushing/screening plant fitted with dust skirts and enclosure panelsEnclosure inspection checklistPlant Maintenance TeamMonthly
11Dust suppression - engineering controlsSand and cement bag handling/tipping points fitted with local dust capture or performed with minimal drop heightHandling procedure observation recordHSE OfficerWeekly
12Administrative controls and work practicesPermit-to-work system includes specific silica control checklist for hot works involving concrete/masonry cuttingPermit-to-work form with silica control section completedHSE OfficerBefore task start
13Administrative controls and work practicesEating, drinking and smoking prohibited in designated dust-exposure zonesSignage and spot-check compliance recordHSE OfficerDaily
14Administrative controls and work practicesContaminated work clothing laundered on-site or bagged separately to prevent take-home silica exposureLaundry/bagging procedure compliance checkCamp SupervisorWeekly
15Administrative controls and work practicesSilica exposure control plan communicated to workers in their native language during inductionMultilingual induction record with silica moduleHSE OfficerPer new joiner
16Administrative controls and work practicesVisitors and non-essential personnel excluded from active dust-generating work zonesAccess control log for exclusion zonesSecurity SupervisorDaily
17Respiratory protective equipment (RPE)RPE issue register maintained recording worker name, RPE type and date of issueRPE issue registerStorekeeperPer issue
18Respiratory protective equipment (RPE)Powered air-purifying respirators (PAPR) battery charge verified before each shift for high-exposure tasksPre-shift PAPR charge/function check logWorkerDaily
19Respiratory protective equipment (RPE)RPE training covers correct donning, doffing, seal check and maintenance proceduresRPE training attendance and competency recordHSE OfficerAnnually
20Respiratory protective equipment (RPE)Disposable dust masks below required protection factor rejected and removed from site distributionPPE inspection and non-conforming stock removal recordStorekeeperMonthly
21Vibration exposure - hand-arm vibration (HAV)Vibration exposure calculator/app used on-site to compute A(8) values for combined tool usage per workerExposure calculation printout per worker per shiftHSE OfficerDaily
22Vibration exposure - hand-arm vibration (HAV)Vibration-emitting plant and tools labelled with manufacturer-declared vibration magnitude for referenceTool label/tag verification during inspectionPlant Maintenance TeamMonthly
23Vibration exposure - hand-arm vibration (HAV)HAVS symptom questionnaire completed by exposed workers as part of periodic health surveillanceCompleted questionnaire on file per workerOccupational Health PhysicianAnnually
24Vibration exposure - hand-arm vibration (HAV)Whole-body vibration (WBV) risk assessed for operators of compactors, rollers and heavy plantWBV risk assessment documentHSE ManagerBefore task start
25Vibration exposure - hand-arm vibration (HAV)Operator seats on vibration-emitting plant fitted with suspension/damping systems maintained in good conditionSeat suspension inspection recordPlant Maintenance TeamMonthly
26HAV control measures and toolingRecords of tool trigger-time exposure retained for minimum statutory period for audit purposesArchived trigger-time log recordsHSE ManagerOngoing
27HAV control measures and toolingWorkers reporting tingling, numbness or finger blanching referred immediately for medical assessmentIncident/referral record for HAVS symptomsFirst AiderAs occurs
28HAV control measures and toolingNew vibrating tools trialled and vibration data verified before mass deployment on siteTrial evaluation report with vibration dataProcurement/HSE ManagerBefore purchase
29HAV control measures and toolingAlternative low-vibration methods (e.g. hydraulic bursting vs pneumatic breaking) evaluated during method statement reviewMethod statement comparison recordSite EngineerBefore task start
30Housekeeping and general dust managementHEPA-filtered vacuum units serviced and filter integrity checked before each useVacuum filter inspection logPlant Maintenance TeamWeekly
31Housekeeping and general dust managementInternal building dust levels monitored during finishing works (sanding, grinding) near occupied or handover areasInternal dust monitoring reportOccupational HygienistMonthly
32Housekeeping and general dust managementSite perimeter hoarding and windbreak netting maintained to reduce fugitive dust migration off-siteHoarding/netting condition inspectionSite SupervisorWeekly
33Housekeeping and general dust managementDust suppression water usage tracked to ensure sustainable water consumption during suppression activitiesWater usage log for dust suppressionEnvironmental OfficerWeekly
34Training, records and management reviewToolbox talk log demonstrates recurring coverage of both silica and vibration topics across the workforceToolbox talk topic trackerHSE OfficerMonthly
35Training, records and management reviewLessons learned from silica/vibration incidents or near-misses shared across project sitesLessons learned bulletin distribution recordHSE ManagerAs occurs
36Training, records and management reviewAnnual internal audit conducted on silica and vibration exposure control programme effectivenessInternal audit report with findings and CAPA statusHSE ManagerAnnually
37Training, records and management reviewOccupational exposure and health surveillance data retained in worker medical files for statutory retention periodMedical file retention compliance checkOccupational Health PhysicianOngoing
38Training, records and management reviewNew supervisors and engineers receive silica/vibration control competency briefing during project onboardingOnboarding competency briefing recordTraining CoordinatorPer new joiner
39Respirable crystalline silica risk assessmentSilica exposure control plan cross-referenced with project HSE plan and approved by client HSE representativeClient approval signature on control planHSE ManagerBefore task start
40Dust suppression - engineering controlsDust extraction unit exhaust discharged away from occupied work areas and public walkwaysDischarge point layout inspectionHSE OfficerWeekly
41Administrative controls and work practicesDust generating tasks scheduled outside occupied building operating hours where handover areas are adjacentWork schedule reviewed against occupancy statusSite EngineerWeekly
42Respiratory protective equipment (RPE)Spare RPE units and filters stocked on-site to prevent workers continuing tasks with defective equipmentStock inventory record for RPE sparesStorekeeperWeekly
43Vibration exposure - hand-arm vibration (HAV)Cold weather/AC exposure combined with HAV tool use assessed as compounding risk factor for circulation issuesCombined risk assessment addendumHSE OfficerBefore task start
44HAV control measures and toolingTool issue counter/hour-meter data reconciled against trigger-time logs for accuracy verificationReconciliation record between meter data and logsHSE OfficerWeekly
45Housekeeping and general dust managementDust deposition on fixed plant and structural steel monitored and cleaned to prevent fire loading and slip hazardsHousekeeping inspection checklist for elevated surfacesSite SupervisorWeekly
46Training, records and management reviewSilica and vibration exposure KPIs included in monthly HSE performance report to project managementMonthly HSE report with exposure KPI sectionHSE ManagerMonthly
47Training, records and management reviewExternal occupational hygiene consultant engaged to independently verify internal exposure monitoring accuracyIndependent verification reportHSE ManagerAnnually
48Training, records and management reviewCorrective actions from silica/vibration audits tracked to closure with verified evidenceCAPA tracker with closure verificationHSE ManagerMonthly
49Respirable crystalline silica risk assessmentSilica exposure risk assessment completed for all tasks involving concrete, block, tile or stone cutting/grindingRCS risk assessment document referenceHSE ManagerBefore task start
50Respirable crystalline silica risk assessmentTask-specific control measures identified per risk assessment hierarchy: elimination, substitution, engineering, PPEControl measures section of risk assessment reviewedHSE OfficerBefore task start
51Respirable crystalline silica risk assessmentAir monitoring for respirable crystalline silica conducted for high-risk dry-cutting operationsOccupational hygiene monitoring report with RCS results vs OELOccupational HygienistQuarterly / per campaign
52Respirable crystalline silica risk assessmentExposure results benchmarked against ADOSH-SF occupational exposure limit for RCS (0.025 mg/m3 TWA-8hr)Monitoring report showing compliance statusHSE ManagerQuarterly / per campaign
53Respirable crystalline silica risk assessmentWorkers included in health surveillance programme where silica exposure risk identifiedHealth surveillance enrolment recordOccupational Health PhysicianAnnually
54Dust suppression - engineering controlsWet cutting method used for concrete, masonry and stone works wherever practicable, with continuous water feedMethod statement specifying wet cutting, water supply verified on siteSite EngineerDaily
55Dust suppression - engineering controlsOn-tool local exhaust ventilation (LEV) fitted to grinders and cut-off saws for dry cutting tasksLEV attachment inspection and airflow checkHSE OfficerWeekly
56Dust suppression - engineering controlsLEV/dust extraction units maintained per manufacturer schedule with filter condition checkedMaintenance log and filter replacement recordPlant Maintenance TeamMonthly
57Dust suppression - engineering controlsWater bowsers/misting units deployed on haul roads and demolition areas to suppress fugitive dustDust suppression deployment logSite EngineerDaily
58Dust suppression - engineering controlsEnclosed or partially enclosed cutting booths used for repetitive stone/tile cutting operations where feasibleBooth inspection and ventilation checkHSE OfficerWeekly
59Dust suppression - engineering controlsStockpiles of sand, aggregate and spoil covered or sprayed to minimise wind-blown dustVisual inspection of stockpile coveringSite SupervisorDaily
60Administrative controls and work practicesDry sweeping of silica-containing dust prohibited; vacuum with HEPA filter or wet methods used insteadHousekeeping method observationHSE OfficerDaily
61Administrative controls and work practicesJob rotation applied to limit individual worker duration of exposure to high-dust tasksRotation schedule / task allocation recordSite SupervisorDaily
62Administrative controls and work practicesExclusion zones established around dry-cutting and demolition dust-generating activitiesBarricading and signage inspectionHSE OfficerDaily
63Administrative controls and work practicesSilica awareness toolbox talk delivered covering health effects and control measures before task commencementToolbox talk attendance recordHSE OfficerBefore task start
64Administrative controls and work practicesCompressed air blow-down for cleaning dusty surfaces or clothing prohibited on siteSite rule communicated, spot-check complianceHSE OfficerWeekly
65Respiratory protective equipment (RPE)RPE selected matches assessed exposure level, minimum P2/FFP3 or powered air-purifying respirator for high exposure tasksRPE selection matrix referenced against exposure assessmentHSE ManagerBefore task start
66Respiratory protective equipment (RPE)Face-fit testing conducted for all workers issued tight-fitting RPE, repeated if facial characteristics changeFit test certificate on file per workerHSE OfficerAnnually / on change
67Respiratory protective equipment (RPE)Workers clean-shaven in RPE seal area to ensure effective face sealVisual inspection at RPE issue pointSupervisorDaily
68Respiratory protective equipment (RPE)RPE filters replaced per manufacturer guidance or when breathing resistance increasesFilter change logWorker / StorekeeperAs required
69Respiratory protective equipment (RPE)RPE stored in clean, sealed containers when not in use, inspected for damage before each usePre-use inspection checklistWorkerDaily
70Vibration exposure - hand-arm vibration (HAV)HAV risk assessment completed for tasks using powered hand tools (breakers, grinders, drills, compactors)HAV risk assessment documentHSE ManagerBefore task start
71Vibration exposure - hand-arm vibration (HAV)Vibration magnitude data obtained from tool manufacturer or measurement used to calculate daily exposure (A(8))Tool vibration data sheet / exposure calculation recordHSE OfficerBefore task start
72Vibration exposure - hand-arm vibration (HAV)Daily HAV exposure action value (2.5 m/s2 A(8)) and limit value (5.0 m/s2 A(8)) trigger points defined and monitoredExposure points system (trigger time) tracking sheetHSE OfficerDaily
73Vibration exposure - hand-arm vibration (HAV)Trigger-time logs maintained per worker to track cumulative daily exposure against limit valuesIndividual trigger-time log sheetSite SupervisorDaily
74Vibration exposure - hand-arm vibration (HAV)Low-vibration tool selection prioritised during procurement for high-frequency-use equipmentProcurement specification referencing vibration limitsProcurement/HSE ManagerBefore purchase
75HAV control measures and toolingAnti-vibration gloves and tool handle damping provided for tasks exceeding exposure action valuePPE issue record and glove inspectionStorekeeperBefore task start
76HAV control measures and toolingJob rotation and task time limits applied to keep individual exposure below daily limit valueRotation roster cross-checked with trigger-time logSite SupervisorDaily
77HAV control measures and toolingPowered tools maintained (bearings, mounts, blades) to manufacturer schedule to prevent excess vibration from wearTool maintenance/service recordPlant Maintenance TeamMonthly
78HAV control measures and toolingWorkers briefed to keep hands warm and avoid excessive grip force to reduce vibration injury riskToolbox talk record on HAV mitigationHSE OfficerBefore task start
79HAV control measures and toolingHealth surveillance (Tier 1/2 HAVS questionnaire and examination) provided for workers above action valueHealth surveillance recordOccupational Health PhysicianAnnually
80Housekeeping and general dust managementSite roads and hard-standing areas swept/vacuumed regularly using dust-suppressing methodsHousekeeping schedule and inspection logSite SupervisorDaily
81Housekeeping and general dust managementDemolition and cutting waste dampened before loading and transport to prevent dust plumesVisual check during loading operationsSite SupervisorDaily
82Housekeeping and general dust managementVehicle wheel washing facility used at site exit to prevent trackout of dust onto public roadsWheel wash log / photographic recordEnvironmental OfficerDaily
83Housekeeping and general dust managementDust monitoring at site boundary conducted where works are near sensitive receptors, per EAD/Dubai Municipality requirementsBoundary dust monitoring report (PM10) vs limitEnvironmental ConsultantMonthly
84Housekeeping and general dust managementComplaints regarding dust nuisance logged, investigated and closed with corrective actionComplaint register and CAPA closure recordEnvironmental OfficerAs occurs
85Training, records and management reviewSupervisors trained to recognise signs of overexposure to dust and vibration and to escalate concernsSupervisor training certificateTraining CoordinatorAnnually
86Training, records and management reviewExposure monitoring records, health surveillance results and control effectiveness reviewed at management levelManagement review minutes referencing exposure dataHSE ManagerQuarterly
87Training, records and management reviewCorrective actions from monitoring results tracked to closure within defined timeframeCAPA tracker with closure evidenceHSE ManagerAs occurs
88Training, records and management reviewRecords of RCS and HAV monitoring retained for minimum statutory period for occupational health recordsDocument control register showing retention periodDocument ControllerOngoing

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.