Plans TOC - Part E; Plan L139 Corrective Action Reg; Plan E39 Medical Emergency Firs
Checkpoints
88
| # | Area | Checkpoint / Requirement | Evidence / Acceptance Criteria | Responsible | Frequency |
|---|---|---|---|---|---|
| 1 | Ramadan Working Hours & Scheduling | Reduced daily working hours applied (2 hours less) per UAE Labour Law during Ramadan. | Approved revised roster/timesheet showing reduced hours signed by HR/PM. | HR Manager | Annually (Ramadan) |
| 2 | Ramadan Working Hours & Scheduling | Site start and finish times adjusted to avoid peak heat and fasting fatigue hours. | Updated site schedule notice posted at gate and mess hall. | Site Manager | Annually (Ramadan) |
| 3 | Ramadan Working Hours & Scheduling | Overtime for fasting workers minimized and only permitted with medical fitness confirmation. | Overtime approval log with HSE sign-off. | HSE Manager | Weekly during Ramadan |
| 4 | Ramadan Working Hours & Scheduling | Work schedule communicated to all subcontractors and workforce prior to Ramadan start. | Toolbox talk attendance sheet and circulated memo. | Site Manager | Once before Ramadan |
| 5 | Ramadan Working Hours & Scheduling | Shift patterns reviewed to allow rest before Iftar and after Suhoor. | Revised shift roster with rest windows documented. | HR Manager | Annually (Ramadan) |
| 6 | Ramadan Working Hours & Scheduling | Critical/high-risk tasks scheduled during cooler, lower-fatigue hours (early morning). | Task schedule showing high-risk activities before 11:00. | Project Engineer | Daily during Ramadan |
| 7 | Ramadan Working Hours & Scheduling | Friday and prayer time schedule adjustments documented and communicated. | Prayer break schedule posted on notice board. | Site Manager | Weekly during Ramadan |
| 8 | Ramadan Working Hours & Scheduling | Ramadan working hours policy approved by senior management before circulation. | Approved policy document with signature and date. | Project Manager | Once before Ramadan |
| 9 | Ramadan Working Hours & Scheduling | Subcontractor compliance with reduced working hours verified through timesheet audits. | Subcontractor timesheet audit report. | HSE Manager | Weekly during Ramadan |
| 10 | MOHRE Midday Break Compliance | Midday break (12:30–15:00) observed for outdoor workers from 15 June to 15 September, overlapping Ramadan where applicable. | MOHRE circular displayed; compliance checklist signed daily. | HSE Officer | Daily (midday break season) |
| 11 | MOHRE Midday Break Compliance | No outdoor manual work performed during mandated midday break hours. | Site patrol log confirming no active outdoor work during break. | HSE Officer | Daily (midday break season) |
| 12 | MOHRE Midday Break Compliance | Midday break notice displayed in English, Arabic and other common languages at site entrance. | Photograph of multilingual notice board. | HSE Officer | Once, verified daily |
| 13 | MOHRE Midday Break Compliance | Exemptions (indoor, air-conditioned or emergency works) documented with justification. | Exemption register with reasons and approvals. | HSE Manager | As needed |
| 14 | MOHRE Midday Break Compliance | MOHRE midday break violations tracked with zero non-conformance target. | Inspection record with no violations logged. | HSE Manager | Daily (midday break season) |
| 15 | MOHRE Midday Break Compliance | Labour accommodation and site staff aware of midday break rules via induction. | Induction training record referencing midday break policy. | HSE Officer | Per new joiner |
| 16 | MOHRE Midday Break Compliance | Coordination with MOHRE inspectors during surprise site visits documented. | Visit log and corrective action closure records. | HSE Manager | As occurs |
| 17 | MOHRE Midday Break Compliance | Site records retained for MOHRE inspection demonstrating midday break compliance history. | Filed compliance records for current and prior seasons. | HSE Manager | Ongoing |
| 18 | Fasting Worker Health Screening | Pre-Ramadan health screening conducted for workers with chronic conditions (diabetes, hypertension). | Screening register with medical clearance status. | Site Nurse/Medic | Before Ramadan start |
| 19 | Fasting Worker Health Screening | Workers self-declare fitness to fast for physically demanding tasks. | Signed self-declaration forms on file. | HR Manager | Before Ramadan start |
| 20 | Fasting Worker Health Screening | High-risk workers (elderly, medically unfit) reassigned to lighter duties during fasting hours. | Reassignment log approved by site medic and supervisor. | Site Nurse/Medic | Ongoing during Ramadan |
| 21 | Fasting Worker Health Screening | Medical clinic/first aid room stocked for dehydration and hypoglycemia cases. | Clinic inventory checklist showing oral rehydration salts, glucose tablets. | Site Nurse/Medic | Weekly during Ramadan |
| 22 | Fasting Worker Health Screening | Workers trained to recognize signs of dehydration, heat exhaustion and low blood sugar. | Toolbox talk record and attendance sheet. | HSE Officer | Once before Ramadan |
| 23 | Fasting Worker Health Screening | Emergency response plan updated to address fasting-related medical emergencies. | Updated ERP document with Ramadan annex. | HSE Manager | Before Ramadan start |
| 24 | Fasting Worker Health Screening | Medical records maintained confidentially for workers under health monitoring. | Confidential medical file register. | Site Nurse/Medic | Ongoing during Ramadan |
| 25 | Fasting Worker Health Screening | Pregnant or breastfeeding workers assessed individually for fasting-related work adjustments. | Individual assessment and accommodation record. | Site Nurse/Medic | As needed |
| 26 | Fasting Worker Health Screening | List of workers exempted from fasting-related task restrictions kept updated and confidential. | Updated exemption list secured with HR. | HR Manager | Weekly during Ramadan |
| 27 | Fatigue Risk Assessment & Management | Fatigue risk assessment updated specifically for Ramadan working conditions. | Signed and dated fatigue risk assessment document. | HSE Manager | Before Ramadan start |
| 28 | Fatigue Risk Assessment & Management | High-risk tasks (working at height, crane ops, driving) restricted during peak fatigue periods. | Task restriction schedule and permit annotations. | HSE Manager | Daily during Ramadan |
| 29 | Fatigue Risk Assessment & Management | Fatigue monitoring rounds conducted by supervisors during afternoon shifts. | Supervisor fatigue observation log. | Site Supervisor | Daily during Ramadan |
| 30 | Fatigue Risk Assessment & Management | Rest breaks increased in frequency though shorter, allowing recovery without exertion. | Rest break schedule with frequency and duration recorded. | Site Supervisor | Daily during Ramadan |
| 31 | Fatigue Risk Assessment & Management | Fatigue reporting mechanism available for workers to flag exhaustion without penalty. | Fatigue incident/near-miss report log. | HSE Officer | Ongoing during Ramadan |
| 32 | Fatigue Risk Assessment & Management | Driving duties for fasting workers limited, with alternate drivers arranged where possible. | Driver roster showing rotation and rest allowance. | Transport Coordinator | Daily during Ramadan |
| 33 | Fatigue Risk Assessment & Management | Fatigue-related incidents investigated and root causes linked to Ramadan schedule reviewed. | Incident investigation report with corrective actions. | HSE Manager | As occurs |
| 34 | Fatigue Risk Assessment & Management | Buddy system implemented for high-risk work to monitor fatigue signs in real time. | Buddy system assignment sheet. | Site Supervisor | Daily during Ramadan |
| 35 | Fatigue Risk Assessment & Management | Fatigue-related task handover briefings conducted between shifts to flag ongoing risks. | Shift handover log with fatigue notes. | Site Supervisor | Daily during Ramadan |
| 36 | Fatigue Risk Assessment & Management | Cumulative fatigue tracked across the week to prevent build-up towards Ramadan's later days. | Weekly cumulative fatigue tracking sheet. | HSE Manager | Weekly during Ramadan |
| 37 | Fatigue Risk Assessment & Management | Night shift workers given adjusted sleep/rest schedule to offset fasting fatigue. | Night shift rest schedule document. | Site Supervisor | Daily during Ramadan |
| 38 | Heat Stress Prevention | Heat stress risk assessment conducted considering fasting (no water intake) plus high temperatures. | Signed heat stress risk assessment. | HSE Manager | Before Ramadan start |
| 39 | Heat Stress Prevention | Wet Bulb Globe Temperature (WBGT) monitored and work adjusted accordingly. | WBGT monitoring log with readings and actions taken. | HSE Officer | Hourly during peak heat |
| 40 | Heat Stress Prevention | Shaded rest areas provided near work fronts for fasting workers. | Site layout drawing showing shaded rest area locations. | Site Manager | Verified daily |
| 41 | Heat Stress Prevention | Cooling measures (fans, misting, cooling vests) provided for outdoor fasting workers. | Equipment issue register and photographic evidence. | HSE Officer | Daily during Ramadan |
| 42 | Heat Stress Prevention | Heat illness emergency procedure posted and understood by first aiders. | Signed acknowledgement from trained first aiders. | Site Nurse/Medic | Before Ramadan start |
| 43 | Heat Stress Prevention | Work-rest cycles adjusted per heat stress index specific to fasting conditions. | Work-rest cycle chart displayed at site office. | HSE Manager | Daily during Ramadan |
| 44 | Heat Stress Prevention | Non-fasting hydration reminders and cooling breaks maintained for non-Muslim workforce. | Hydration station log and break records. | HSE Officer | Daily during Ramadan |
| 45 | Heat Stress Prevention | Sunscreen and protective clothing provided for prolonged outdoor exposure during fasting hours. | PPE issue register for sun protection items. | HSE Officer | Once before Ramadan |
| 46 | Heat Stress Prevention | Portable shade structures relocated to follow work fronts as site progresses. | Shade structure relocation log. | Site Manager | Weekly during Ramadan |
| 47 | Heat Stress Prevention | Heat stress case reporting includes near-miss dizziness or fainting events for trend analysis. | Heat stress case log with categorization. | Site Nurse/Medic | Ongoing during Ramadan |
| 48 | Nutrition, Hydration & Suhoor/Iftar Facilities | Iftar meals provided on time at accommodation/site as per schedule. | Catering delivery log with timestamps. | Camp Boss | Daily during Ramadan |
| 49 | Nutrition, Hydration & Suhoor/Iftar Facilities | Suhoor meal facilities and timing arranged to ensure adequate pre-dawn nutrition. | Suhoor service schedule and attendance record. | Camp Boss | Daily during Ramadan |
| 50 | Nutrition, Hydration & Suhoor/Iftar Facilities | Nutrition guidance provided to workers on balanced Suhoor/Iftar meals for sustained energy. | Awareness poster/handout distribution record. | Site Nurse/Medic | Once before Ramadan |
| 51 | Nutrition, Hydration & Suhoor/Iftar Facilities | Water and electrolyte provisions available immediately after sunset for rapid rehydration. | Water/electrolyte stock and distribution log. | Camp Boss | Daily during Ramadan |
| 52 | Nutrition, Hydration & Suhoor/Iftar Facilities | Iftar and Suhoor areas maintained hygienically as per food safety standards. | Food safety inspection checklist. | Camp Boss | Daily during Ramadan |
| 53 | Nutrition, Hydration & Suhoor/Iftar Facilities | Prayer breaks (Maghrib for Iftar) accommodated within work schedule without penalty. | Prayer break log signed by supervisor. | Site Supervisor | Daily during Ramadan |
| 54 | Nutrition, Hydration & Suhoor/Iftar Facilities | Dates and water distributed on-site immediately at Maghrib for workers still on shift. | Iftar distribution log with time and quantity. | Camp Boss | Daily during Ramadan |
| 55 | Nutrition, Hydration & Suhoor/Iftar Facilities | Kitchen and catering staff briefed on food safety requirements specific to Ramadan meal timing. | Catering staff briefing record. | Camp Boss | Once before Ramadan |
| 56 | Traffic, Machinery & High-Risk Operations | Vehicle and mobile plant operators assessed for fatigue before shift assignment. | Pre-shift fitness declaration for operators. | Plant Supervisor | Daily during Ramadan |
| 57 | Traffic, Machinery & High-Risk Operations | Crane and lifting operations restricted to non-peak fatigue hours where feasible. | Lift plan with scheduled timing noted. | Lifting Supervisor | Per lift during Ramadan |
| 58 | Traffic, Machinery & High-Risk Operations | Journey management plan updated to limit driving during late afternoon fatigue window. | Approved journey management plan. | Transport Coordinator | Before Ramadan start |
| 59 | Traffic, Machinery & High-Risk Operations | Reversing and manoeuvring supervision increased during low-alertness periods. | Banksman deployment log. | Site Supervisor | Daily during Ramadan |
| 60 | Traffic, Machinery & High-Risk Operations | Permit to work system flags Ramadan fatigue considerations for high-risk permits. | PTW form with Ramadan fatigue checkbox completed. | HSE Officer | Per permit during Ramadan |
| 61 | Traffic, Machinery & High-Risk Operations | Machine operators rotated more frequently to manage sustained attention demands. | Operator rotation schedule. | Plant Supervisor | Daily during Ramadan |
| 62 | Traffic, Machinery & High-Risk Operations | Confined space entry work deferred or extra supervision applied during fasting fatigue periods. | Confined space permit with additional controls noted. | HSE Officer | Per permit during Ramadan |
| 63 | Traffic, Machinery & High-Risk Operations | Working at height tasks reviewed for scheduling outside high-fatigue afternoon window. | Height work schedule with timing adjustment. | HSE Officer | Daily during Ramadan |
| 64 | Training, Awareness & Communication | Ramadan-specific HSE toolbox talk delivered to entire workforce before start of month. | Toolbox talk record with topics and attendee signatures. | HSE Officer | Once before Ramadan |
| 65 | Training, Awareness & Communication | Supervisors briefed on fatigue and heat stress warning signs and escalation process. | Supervisor briefing attendance sheet. | HSE Manager | Once before Ramadan |
| 66 | Training, Awareness & Communication | Multilingual awareness materials on fatigue, hydration and midday break distributed. | Distribution record with language versions listed. | HSE Officer | Once before Ramadan |
| 67 | Training, Awareness & Communication | Emergency contact numbers and nearest clinic information communicated to workforce. | Posted emergency contact list at site notice board. | HSE Officer | Once before Ramadan |
| 68 | Training, Awareness & Communication | Feedback sessions held with workers to capture concerns on Ramadan working arrangements. | Meeting minutes with worker feedback and actions. | HR Manager | Weekly during Ramadan |
| 69 | Training, Awareness & Communication | Non-Muslim workforce briefed on schedule changes and respectful conduct expectations. | Briefing attendance sheet. | HR Manager | Once before Ramadan |
| 70 | Training, Awareness & Communication | Ramadan HSE induction updated annually to reflect current MOHRE guidance. | Updated induction material with revision date. | HSE Manager | Annually before Ramadan |
| 71 | Training, Awareness & Communication | Visual signage on fatigue and heat stress symptoms posted at strategic site locations. | Photographic evidence of posted signage. | HSE Officer | Once before Ramadan |
| 72 | Training, Awareness & Communication | Cultural sensitivity training reinforced for supervisors managing mixed fasting/non-fasting crews. | Training attendance record. | HR Manager | Once before Ramadan |
| 73 | Accommodation & Rest Facilities | Labour accommodation air-conditioning verified functional for daytime rest of night-shift/fasting workers. | AC maintenance and inspection checklist. | Camp Boss | Weekly during Ramadan |
| 74 | Accommodation & Rest Facilities | Rest rooms/quiet areas designated for workers needing recovery breaks during shift. | Facility inspection checklist confirming rest room availability. | Camp Boss | Weekly during Ramadan |
| 75 | Accommodation & Rest Facilities | Bedding and sleeping arrangements checked to support adequate daytime rest for night workers. | Accommodation inspection report. | Camp Boss | Weekly during Ramadan |
| 76 | Accommodation & Rest Facilities | Noise levels at accommodation controlled to protect daytime sleep of fasting/night-shift workers. | Noise complaint log and mitigation actions. | Camp Boss | Weekly during Ramadan |
| 77 | Accommodation & Rest Facilities | Transport to/from site adjusted to reduce workers' time away from rest before Iftar. | Transport schedule and timing log. | Transport Coordinator | Daily during Ramadan |
| 78 | Accommodation & Rest Facilities | Drinking water and electrolyte stations available at accommodation for immediate post-sunset use. | Accommodation hydration station inspection log. | Camp Boss | Daily during Ramadan |
| 79 | Accommodation & Rest Facilities | Medical staff on-call at accommodation during early morning Suhoor and night hours. | On-call medical roster. | Site Nurse/Medic | Daily during Ramadan |
| 80 | Monitoring, Reporting & Continuous Improvement | Daily HSE walk-around includes specific Ramadan fatigue and heat stress observations. | Daily HSE inspection report with Ramadan section completed. | HSE Officer | Daily during Ramadan |
| 81 | Monitoring, Reporting & Continuous Improvement | Weekly Ramadan HSE performance review meeting held with management and subcontractors. | Meeting minutes and action tracker. | HSE Manager | Weekly during Ramadan |
| 82 | Monitoring, Reporting & Continuous Improvement | Incident and near-miss statistics analyzed for Ramadan-period trends compared to baseline. | Statistical trend report. | HSE Manager | Weekly during Ramadan |
| 83 | Monitoring, Reporting & Continuous Improvement | Corrective actions from midday break/heat stress inspections tracked to closure. | Corrective action tracker with closure evidence. | HSE Officer | Ongoing during Ramadan |
| 84 | Monitoring, Reporting & Continuous Improvement | Post-Ramadan lessons learned review conducted to improve future year planning. | Lessons learned report with recommendations. | HSE Manager | Once after Ramadan |
| 85 | Monitoring, Reporting & Continuous Improvement | Management of change process followed for any mid-Ramadan schedule adjustments. | MOC form with approvals. | Project Manager | As needed |
| 86 | Monitoring, Reporting & Continuous Improvement | Audit of Ramadan HSE arrangements conducted by senior management or third party. | Audit report with findings and closure status. | HSE Manager | Once during Ramadan |
| 87 | Monitoring, Reporting & Continuous Improvement | Ramadan HSE KPIs (incidents, heat cases, compliance rate) reported to senior management. | Monthly KPI report submitted to management. | HSE Manager | Weekly during Ramadan |
| 88 | Monitoring, Reporting & Continuous Improvement | Benchmarking against previous years' Ramadan HSE performance conducted. | Year-on-year comparison report. | HSE Manager | Once after Ramadan |
Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.