Part G — Equipment & Plant
Portable Electrical Checklist
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update on legal, authority, project or client change
Checkpoints
90
Writing or reviewing the risk assessment behind this checklist? Read the MSRA meaning in safety — Method Statement Risk Assessment guide for the full definition, UAE regulations, roles and scoring method.
| # | Area | Checkpoint / Requirement | Evidence / Acceptance Criteria | Responsible | Frequency |
|---|---|---|---|---|---|
| 1 | Procurement and Equipment Standards | Only equipment bearing recognized certification mark (ESMA/UL/CE) procured for site use | Certification mark verified on nameplate at goods receipt | HSE Officer | On receipt |
| 2 | Procurement and Equipment Standards | New equipment registered in asset register with baseline PAT test before first use | Baseline test certificate issued prior to deployment | HSE Officer | Before first use |
| 3 | Procurement and Equipment Standards | Equipment specification matches task voltage and environmental requirements | Technical datasheet cross-checked against task risk assessment | Site Supervisor | Before procurement |
| 4 | Earthing and Bonding | Earth continuity test conducted and result within acceptable resistance limit | Earth continuity test result recorded on PAT certificate | HSE Officer | As per PAT schedule |
| 5 | Earthing and Bonding | Equipotential bonding verified for equipment in wet or metal-frame work areas | Bonding conductor continuity checked and logged | Electrical Supervisor | Weekly |
| 6 | Earthing and Bonding | Site main earthing system inspected and earth electrode resistance tested | Earth electrode test certificate current and within limits | Electrical Supervisor | Quarterly |
| 7 | Insulation Resistance Testing | Insulation resistance test performed as part of PAT regime for double-insulated equipment | Insulation resistance value recorded meets minimum threshold | HSE Officer | As per PAT schedule |
| 8 | Insulation Resistance Testing | Equipment failing insulation resistance test withdrawn and repaired by competent person | Repair record and re-test certificate filed before return to service | HSE Officer | As needed |
| 9 | Lock Out Tag Out (LOTO) Procedures | Isolation and lockout applied before maintenance on portable equipment | LOTO permit completed with lock/tag applied to isolation point | Electrical Supervisor | Before maintenance |
| 10 | Lock Out Tag Out (LOTO) Procedures | Only authorized personnel hold keys/combinations to lockout devices | Key control register maintained and restricted to competent persons | Electrical Supervisor | Ongoing |
| 11 | Circuit Protection and Overcurrent Devices | Fuses and circuit breakers rated correctly for connected equipment load | Fuse/breaker rating cross-checked against equipment nameplate current | Electrical Supervisor | Weekly |
| 12 | Circuit Protection and Overcurrent Devices | Distribution board circuit breakers tested for correct trip operation | Trip test conducted and result logged in maintenance record | Electrical Supervisor | Monthly |
| 13 | Hand Tool Specific Requirements | Hand-held power tools fitted with dead-man/trigger switch functioning correctly | Function test confirms tool stops when trigger released | Equipment User | Before each use |
| 14 | Hand Tool Specific Requirements | Guards fitted to grinders, saws and cutting tools and not removed/bypassed | Visual inspection confirms guard present and correctly adjusted | Equipment User | Before each use |
| 15 | Hand Tool Specific Requirements | Vibration-reducing tools used where prolonged use exceeds exposure action value | HAVS risk assessment reviewed, low-vibration tools issued where required | HSE Officer | Before task |
| 16 | Site Lighting Equipment | Portable site lighting (festoon/floodlights) rated for outdoor/wet use | IP rating of lighting equipment confirmed suitable for location | HSE Officer | Weekly |
| 17 | Site Lighting Equipment | Lighting cables suspended clear of walkways and vehicle routes | Visual inspection confirms cables elevated or protected | Site Supervisor | Daily |
| 18 | Battery Charging Stations | Battery charging area segregated with fire extinguisher and ventilation provided | Charging station inspection confirms segregation and fire equipment present | HSE Officer | Weekly |
| 19 | Battery Charging Stations | Lithium-ion battery chargers monitored and not left unattended overnight without safeguards | Charging station risk assessment confirms monitoring/safeguard controls | HSE Officer | Weekly |
| 20 | Contractor and Subcontractor Equipment | Subcontractor-owned portable equipment verified for valid PAT certificate before use on site | Certificate checked at gate/security prior to equipment entering site | HSE Officer | On entry |
| 21 | Contractor and Subcontractor Equipment | Subcontractor equipment registered on main contractor's asset register for traceability | Cross-reference log linking subcontractor equipment to main register | HSE Officer | On entry |
| 22 | Temporary Works Electrical Supply | Temporary electrical installations designed and signed off by competent electrical engineer | Temporary works design certificate on file | Electrical Supervisor | Before installation |
| 23 | Temporary Works Electrical Supply | Temporary supply cables protected from vehicle and mechanical damage | Cable protection (ducting/ramps) inspected along route | HSE Officer | Weekly |
| 24 | Confined Space Electrical Use | Portable equipment used in confined spaces powered at reduced/extra-low voltage | Confined space permit specifies voltage class used | HSE Officer | Before task |
| 25 | Confined Space Electrical Use | Ventilation equipment used in confined space electrically isolated from flammable source ignition risk | Equipment classification checked against confined space atmosphere test results | HSE Officer | Before task |
| 26 | Static and Dust Hazard Control | Anti-static precautions applied for equipment used in dust-generating environments | Bonding/earthing straps installed and inspected | HSE Officer | Weekly |
| 27 | Static and Dust Hazard Control | Equipment cooling vents kept clear of dust accumulation to prevent overheating | Visual inspection confirms vents clean and unobstructed | Equipment User | Daily |
| 28 | Seasonal and Weather-Related Controls | Equipment inspected for condensation/moisture ingress after storage in humid conditions | Pre-use inspection includes moisture check after storage period | Equipment User | Before use |
| 29 | Seasonal and Weather-Related Controls | Outdoor equipment covered/protected during sandstorms and heavy rain events | Weather protection measures confirmed in place before adverse weather | Site Supervisor | As needed |
| 30 | Training and Competency Records | Electrical Supervisor holds valid competency certification for site electrical safety oversight | Competency certificate on file, scope matches supervisory duties | HSE Manager | Before assignment |
| 31 | Training and Competency Records | Refresher training on portable electrical safety conducted annually for all users | Training attendance register with annual renewal dates | HSE Officer | Annually |
| 32 | Audit and Continuous Improvement | Portable electrical equipment audit findings trended for recurring defect types | Trend analysis report reviewed by HSE Manager | HSE Manager | Quarterly |
| 33 | Audit and Continuous Improvement | Corrective actions from previous audits verified closed before next audit cycle | Audit closure verification record cross-checked against CAPA log | HSE Officer | Quarterly |
| 34 | Audit and Continuous Improvement | Benchmarking against industry best practice (ADOSH-SF, OSHAD) conducted periodically | Benchmarking report on file with identified improvement actions | HSE Manager | Annually |
| 35 | Emergency Response for Electrical Incidents | Electrical shock first aid procedure displayed and understood by site first aiders | First aid procedure poster displayed, first aiders briefed | HSE Officer | Once per site |
| 36 | Emergency Response for Electrical Incidents | Emergency shutdown drill conducted for main electrical distribution system | Drill record with response time and lessons learned documented | Electrical Supervisor | Annually |
| 37 | Emergency Response for Electrical Incidents | Arc flash risk assessment conducted for equipment with exposed live parts during maintenance | Arc flash assessment report with PPE category assigned | Electrical Supervisor | Before maintenance |
| 38 | Documentation Retention and Traceability | Historical PAT and inspection records retained for minimum regulatory retention period | Archive of records accessible and retained per site document control procedure | HSE Officer | Ongoing |
| 39 | Documentation Retention and Traceability | Equipment decommissioning and disposal records cross-referenced to asset register closure | Disposal certificate matched to asset register entry closure | HSE Officer | As needed |
| 40 | Documentation and Testing Regime | Portable Appliance Testing (PAT) certificate current for all equipment on site | PAT test label with pass date and re-test due date visible on each item | HSE Officer | As per PAT schedule |
| 41 | Documentation and Testing Regime | PAT re-test frequency assigned per equipment risk category (110V tools, site equipment) | Testing register shows risk-based intervals (3/6/12 months) per DEWA/ADDC guidance | HSE Officer | As scheduled |
| 42 | Documentation and Testing Regime | Register of all portable electrical equipment maintained and updated | Asset register with unique ID, location, last test date, next due date | HSE Officer | Monthly |
| 43 | Documentation and Testing Regime | Third-party competent person conducts PAT testing | Certificate/qualification of PAT tester on file | HSE Officer | Per contract |
| 44 | Documentation and Testing Regime | Equipment failing PAT immediately removed from service | Failed item tagged 'Out of Service' and quarantined from work area | HSE Officer | Immediate |
| 45 | Visual Inspection Before Use | User visual inspection of plug, cable and casing conducted before each use | Signed daily/weekly user checklist, no visible damage found | Equipment User | Before each use |
| 46 | Visual Inspection Before Use | Plug top intact with no cracks, and correctly wired/fused | Visual check of plug casing and fuse rating matches equipment nameplate | Equipment User | Before each use |
| 47 | Visual Inspection Before Use | Cable sheath free from cuts, abrasion, exposed conductors or joints | Cable inspected along full length, no taped or spliced repairs present | Equipment User | Before each use |
| 48 | Visual Inspection Before Use | Casing of tool/appliance free from cracks or damage exposing internal parts | Visual inspection confirms enclosure integrity | Equipment User | Before each use |
| 49 | Visual Inspection Before Use | Inspection tag/color-coding system current for the quarter | Color-coded tag matches current site testing cycle color | HSE Officer | Quarterly |
| 50 | Voltage Reduction and Site Supply | 110V center-tapped-to-earth (CTE) equipment used for site power tools | Equipment rated plate confirms 110V CTE, transformer present on site | HSE Officer | Continuous |
| 51 | Voltage Reduction and Site Supply | Step-down transformers positioned on stable, dry surface away from water | Visual inspection of transformer location and mounting | HSE Officer | Weekly |
| 52 | Voltage Reduction and Site Supply | Extra-low voltage (below 50V) used in confined/wet locations where required | Task risk assessment confirms voltage selection for wet/confined work | Site Supervisor | Before task |
| 53 | Voltage Reduction and Site Supply | 230V equipment restricted to authorized fixed installations only, not general site use | Site electrical policy enforced, spot checks conducted | HSE Officer | Weekly |
| 54 | Residual Current Device (RCD) Protection | All portable equipment connected via RCD protection (30mA) | RCD device present at distribution board or in-line, rating confirmed 30mA | HSE Officer | Continuous |
| 55 | Residual Current Device (RCD) Protection | RCD push-button test performed and trip time verified | Test button pressed, device trips immediately, result logged | Equipment User | Before each use |
| 56 | Residual Current Device (RCD) Protection | RCD test log maintained for each distribution board/socket outlet | Test log with date, RCD ID, and pass/fail result | HSE Officer | Weekly |
| 57 | Residual Current Device (RCD) Protection | Faulty or non-tripping RCD replaced immediately and circuit isolated | Replacement record and isolation confirmation logged | Electrical Supervisor | Immediate |
| 58 | Cable and Lead Management | Extension leads fully uncoiled during use to prevent overheating | Visual check confirms lead not coiled/wound on reel while energized | Equipment User | Before each use |
| 59 | Cable and Lead Management | Cables routed to avoid trip hazards, sharp edges and pinch points | Cable routing inspected, protected by cable ramps/covers where crossing walkways | HSE Officer | Daily |
| 60 | Cable and Lead Management | Cables suspended or elevated in wet/flooded areas, not laid in standing water | Visual inspection of cable routing in wet trade areas | Site Supervisor | Daily |
| 61 | Cable and Lead Management | Cable joints/connectors are industrial rated (IP44 minimum) and not taped repairs | Connector inspection confirms correct IP-rated coupler used | HSE Officer | Weekly |
| 62 | Cable and Lead Management | Cable reels/leads not overloaded beyond rated current capacity | Load calculation checked against cable/reel rating for connected equipment | Equipment User | Before use |
| 63 | Socket Outlets and Distribution | Distribution boards (temporary power) IP-rated for site conditions and weatherproof | IP rating (IP44/IP65) confirmed appropriate for exposure, enclosure closed | HSE Officer | Weekly |
| 64 | Socket Outlets and Distribution | Socket outlets not overloaded via multi-way adaptors/daisy-chaining | Visual inspection confirms single connection per outlet or approved distribution unit | HSE Officer | Weekly |
| 65 | Socket Outlets and Distribution | Distribution boards secured, labelled and locked to prevent unauthorized access | Board locked/enclosed, circuit labelling legible and current | Electrical Supervisor | Weekly |
| 66 | Socket Outlets and Distribution | Distribution boards elevated off ground and protected from water ingress/vehicle damage | Visual inspection of mounting height and physical protection barriers | HSE Officer | Weekly |
| 67 | Equipment Suitability and Environment | Equipment IP rating suitable for area of use (wet, dusty, hazardous) | Nameplate IP rating cross-checked against area classification | Site Supervisor | Before task |
| 68 | Equipment Suitability and Environment | Equipment used in flammable/hazardous atmosphere is intrinsically safe/ATEX rated where required | ATEX certification verified against hot work/flammable area permit | HSE Officer | Before task |
| 69 | Equipment Suitability and Environment | Tools stored in dry, secure location when not in use | Storage area inspection confirms equipment off ground and covered | Equipment User | Daily |
| 70 | Equipment Suitability and Environment | Equipment not used beyond manufacturer's environmental operating limits (temperature/humidity) | Manufacturer datasheet limits checked against site conditions | Equipment User | Before use |
| 71 | User Competency and Awareness | Operators trained in safe use of specific portable electrical equipment | Training record/competency certificate on file for equipment type | HSE Officer | Before first use |
| 72 | User Competency and Awareness | Toolbox talk delivered on electrical safety and reporting of damaged equipment | Toolbox talk attendance register signed | Site Supervisor | Monthly |
| 73 | User Competency and Awareness | Users aware of isolation procedure and location of emergency shut-off | Verbal/written confirmation during induction, tested via spot check | Site Supervisor | Once per site |
| 74 | User Competency and Awareness | Users instructed not to attempt repairs on damaged equipment themselves | Statement acknowledged in induction pack, disciplinary policy referenced | HSE Officer | Once per site |
| 75 | Defect Reporting and Corrective Action | Damaged/defective equipment reported immediately and removed from service | Defect report logged, equipment tagged 'Danger - Do Not Use' | Equipment User | Immediate |
| 76 | Defect Reporting and Corrective Action | Near-miss/incident involving electrical equipment investigated | Incident report completed with root cause and corrective action | HSE Officer | Within 24 hours |
| 77 | Defect Reporting and Corrective Action | Repaired equipment re-tested (PAT) before return to service | Post-repair PAT certificate issued prior to reissue | HSE Officer | Before return to service |
| 78 | Defect Reporting and Corrective Action | Non-compliant equipment disposed of or permanently withdrawn if beyond repair | Disposal/write-off record maintained in asset register | HSE Officer | As needed |
| 79 | Generator and Temporary Power Supply | Generators supplying portable equipment earthed correctly with earth rod/electrode tested | Earth continuity/resistance test result recorded within acceptable limits | Electrical Supervisor | Weekly |
| 80 | Generator and Temporary Power Supply | Generator fuel storage and refuelling area separated from electrical distribution points | Visual inspection of fuel storage distance and spill containment | HSE Officer | Weekly |
| 81 | Generator and Temporary Power Supply | Generator output protected by RCD before supplying portable equipment | RCD unit fitted between generator output and distribution, tested | Electrical Supervisor | Weekly |
| 82 | Generator and Temporary Power Supply | Generator noise and exhaust routed away from occupied work areas | Location assessment confirms exhaust direction and noise barrier placement | HSE Officer | Weekly |
| 83 | Hazardous and Wet Location Controls | Equipment used near water features/wash-down areas is rated IPX4 or higher | IP rating verified against wet area risk assessment | Site Supervisor | Before task |
| 84 | Hazardous and Wet Location Controls | Confined space electrical equipment intrinsically safe or battery-operated where flammable atmosphere present | Confined space entry permit cross-references equipment safety rating | HSE Officer | Before task |
| 85 | Hazardous and Wet Location Controls | Metal-bodied equipment double insulated or earthed when used outdoors/wet conditions | Equipment class (Class I/II) confirmed suitable, earth continuity tested | Equipment User | Before task |
| 86 | Emergency Preparedness and Audit | Fire extinguisher (CO2/dry powder) located near main distribution boards | Extinguisher present, inspected, in-date service tag | HSE Officer | Monthly |
| 87 | Emergency Preparedness and Audit | Emergency isolation procedure displayed at distribution board | Laminated isolation procedure posted and legible | Electrical Supervisor | Once per site |
| 88 | Emergency Preparedness and Audit | Monthly electrical safety inspection of site distribution and portable equipment conducted | Inspection report signed by competent electrical supervisor | Electrical Supervisor | Monthly |
| 89 | Emergency Preparedness and Audit | Equipment register cross-checked against physical site inventory | Reconciliation report showing no untested/unregistered equipment in use | HSE Officer | Monthly |
| 90 | Emergency Preparedness and Audit | Audit findings closed out with corrective action tracking | CAPA log with closure evidence and sign-off | HSE Manager | Monthly |
Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.