Part H — High-Risk Works

Utility strike prevention

Workbook section 79
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plans TOC - Part H; H - Utility Strike Prevention; Plan H79 Underground and Overhe
Checkpoints
87
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Pre-Excavation PlanningUtility owner site walk-down conducted jointly with DEWA/Etisalat representative prior to deep excavation near critical assetsJoint site walk-down minutes signed by authority representativeProject EngineerPrior to deep excavation
2Pre-Excavation PlanningHistorical strike/incident data for the area reviewed with local municipality records before planning excavation routeHistorical incident review reportHSE ManagerPrior to excavation
3Pre-Excavation PlanningUtility crossing points identified and cross-referenced with MEP shop drawings for clash detectionClash detection report with utility overlayDesign CoordinatorPrior to excavation
4Pre-Excavation PlanningStandby authority representative requested for excavation within critical high-voltage cable corridorsAuthority attendance confirmation recordProject ManagerPrior to excavation near HV cables
5Pre-Excavation PlanningExcavation sequence plan reviewed to ensure deepest/most critical utility crossings are exposed first under supervisionApproved excavation sequence drawingSite EngineerPrior to excavation
6Pre-Excavation PlanningWeather and ground condition suitability checked before deploying GPR survey equipmentGPR pre-survey condition checklistUtility Survey EngineerPrior to each GPR survey
7Excavation MarkingUtility marking re-verified and refreshed after rainfall or site disturbance that may erase paint markersRe-marking inspection log with date and photosSite SupervisorAfter rainfall/disturbance
8Excavation MarkingMarker posts installed at utility crossing points along open trench length for ongoing visibilityMarker post installation photographic recordSite SupervisorPrior to trench opening
9Excavation MarkingUtility marking legend cross-checked with authority-issued colour code standard to avoid misinterpretationLegend verification checklist signed by HSE OfficerHSE OfficerPrior to excavation
10Excavation MarkingExposed utility sections physically supported/slung to prevent sagging or damage during adjacent excavationSupport/sling installation inspection recordSite EngineerDuring excavation near exposed utility
11Overhead Line PrecautionsInsulated barrier matting or covers installed on exposed low-voltage conductors within reach of site personnelInsulated cover installation inspection recordElectrical SupervisorPrior to works near LV conductors
12Overhead Line PrecautionsHeight of tallest mobile plant checked against overhead line clearance chart before mobilisation to site zonePlant height verification log against clearance chartPlant SupervisorPrior to plant mobilisation
13Overhead Line PrecautionsSpotter positioned with direct line of sight and radio contact with operator during works beneath overhead linesSpotter deployment record with radio check logSite SupervisorEach shift near overhead lines
14Overhead Line PrecautionsWarning signage indicating overhead line hazard erected at approach points to the work areaSignage placement inspection photoHSE OfficerPrior to works commencement
15Mechanical Excavation ControlsExcavation exclusion zone barricaded and signposted to prevent unauthorised plant entryBarricade and signage inspection recordSite SupervisorDaily
16Mechanical Excavation ControlsExcavator operator holds valid competency card specific to utility-sensitive excavation worksValid operator competency card on fileHSE ManagerPrior to deployment
17Mechanical Excavation ControlsDaily pre-excavation briefing conducted covering known utility locations and depth for that day's work frontSigned daily briefing recordSite SupervisorDaily
18Mechanical Excavation ControlsExcavation work halted and area made safe when visibility or lighting conditions compromise utility identificationWork stoppage log with justification recordedSite SupervisorAs required
19Mechanical Excavation ControlsTrench box/shoring installed does not obstruct visual verification of exposed utility linesShoring installation inspection checklistSite EngineerPrior to shoring installation
20Emergency ResponseUtility strike drill scenario includes simulated authority notification call to verify contact list accuracyDrill report with call verification logHSE ManagerSemi-annually
21Emergency ResponseSite emergency vehicle access route to excavation area kept clear and unobstructed at all timesAccess route inspection checklistSite SupervisorDaily
22Emergency ResponseDesignated first responder trained in gas leak/electrical strike specific emergency actionsFirst responder training certificateHSE ManagerPrior to excavation works
23Emergency ResponsePost-incident investigation procedure defines timeline for root cause analysis following any utility strikeInvestigation procedure document with defined timelinesHSE ManagerPrior to excavation works
24Documentation & RecordsPhotographic evidence of exposed utilities retained in project record prior to backfillingPhotographic record archive linked to excavation permit numberSite EngineerPrior to backfilling
25Documentation & RecordsUtility clash resolution register maintained tracking design changes arising from field-exposed utilitiesClash resolution register with close-out statusDesign CoordinatorOngoing / Monthly review
26Documentation & RecordsSubcontractor excavation activities cross-verified against master utility strike prevention logMaster log with subcontractor entries reconciledHSE ManagerWeekly
27Training & CompetencyNew site personnel receive utility strike awareness induction before working near excavation zonesInduction training record with utility awareness moduleHSE OfficerPrior to site access
28Training & CompetencyBanksman/spotter competency for utility-sensitive excavation verified through practical assessmentPractical assessment recordHSE ManagerPrior to assignment
29Training & CompetencyToolbox talk topics on utility strike prevention rotated to cover different utility types across the project durationToolbox talk topic schedule and attendance recordsSite SupervisorWeekly
30Utility CoordinationUtility diversion works coordinated with authority-approved contractor and inspected prior to backfill acceptanceAuthority inspection sign-off for diverted utilityProject EngineerUpon utility diversion completion
31Utility CoordinationTemporary utility support (electrical cable ducting, water pipe cradling) inspected weekly for integrity during prolonged exposureWeekly temporary support inspection checklistSite EngineerWeekly
32Utility CoordinationThird-party utility works within site boundary coordinated through a single point of contact to avoid duplicate excavationCoordination meeting minutes with single point of contact confirmedProject ManagerWeekly
33Utility CoordinationUtility isolation/permit-to-work obtained from authority before any planned utility diversion or tie-in workAuthority-issued isolation permitProject EngineerPrior to diversion/tie-in work
34Risk AssessmentTask-specific risk assessment updated when excavation depth or utility proximity changes from original planRevised risk assessment with revision date and approvalHSE ManagerUpon scope change
35Risk AssessmentHigh-risk excavation activities (within 1m of high-voltage cable or gas main) subject to additional management approval before startSenior management approval record for high-risk excavationProject ManagerPrior to high-risk excavation
36Risk AssessmentGround conditions (made ground, previous excavation records) assessed for likelihood of undocumented servicesGround condition assessment reportGeotechnical EngineerPrior to excavation
37Risk AssessmentBuried structure/utility risk register reviewed and updated at project HSE committee meetingHSE committee meeting minutes referencing utility risk registerHSE ManagerMonthly
38Plant & EquipmentVacuum excavation unit inspected and certified fit for use prior to deployment near sensitive utilitiesEquipment inspection certificatePlant SupervisorPrior to deployment
39Plant & EquipmentCAT & Genny locator equipment calibration verified against manufacturer scheduleCalibration certificate on fileUtility Survey EngineerAs per calibration schedule
40Plant & EquipmentExcavator fitted with proximity alarm/sensor when operating within defined utility exclusion bufferProximity alarm functional test recordPlant SupervisorDaily
41Plant & EquipmentInsulated hand tools provided and used for hand excavation near live electrical servicesInsulated tool inspection and issue recordSite SupervisorPrior to hand excavation
42Backfill & ReinstatementBackfill material and compaction method verified as non-damaging to reinstated utility prior to placementBackfill method compliance checklistSite EngineerPrior to backfilling
43Backfill & ReinstatementReinstated utility line tested/inspected by authority or competent person before final backfill layer placedAuthority/competent person inspection sign-offProject EngineerPrior to final backfill
44Backfill & ReinstatementSurface reinstatement (road, footpath) restored to authority specification following utility exposure worksReinstatement completion certificateSite EngineerUpon completion
45Backfill & ReinstatementSettlement monitoring conducted over reinstated excavation areas near critical utilitiesSettlement monitoring survey logLand SurveyorMonthly post-reinstatement
46CommunicationDaily excavation activity coordinated with site logistics to prevent conflicting works over marked utility corridorsDaily logistics coordination logSite SupervisorDaily
47CommunicationUtility strike prevention performance discussed at weekly project HSE meeting with corrective actions trackedWeekly HSE meeting minutes with action trackerHSE ManagerWeekly
48CommunicationSign language/visual cue protocol established for banksman-operator communication in high-noise excavation zonesCommunication protocol briefing recordSite SupervisorPrior to excavation works
49CommunicationAuthority hotline test call performed periodically to confirm emergency contact responsivenessTest call log with response time recordedHSE ManagerQuarterly
50Audit & ReviewInternal audit of utility strike prevention controls conducted across all active excavation frontsInternal audit report with findings and closure statusHSE ManagerMonthly
51Audit & ReviewThird-party HSE audit includes specific verification of utility strike prevention complianceThird-party audit report section on utility controlsHSE ManagerQuarterly
52Audit & ReviewCorrective actions from utility strike audits tracked to closure with verified evidence before sign-offCorrective action tracker with closure evidenceHSE ManagerMonthly
53Pre-Excavation PlanningStatutory authority utility drawings obtained (DEWA, Etisalat/du, Empower/Tabreed, Salik, sewerage) prior to any excavationNOC and as-built drawings register with authority stamp on fileProject EngineerPrior to excavation
54Pre-Excavation PlanningExcavation permit/dig permit issued and approved by relevant authority (RTA/DM/Trakhees/DEWA) before breaking groundSigned dig permit with validity dates displayed at siteHSE ManagerPrior to excavation
55Pre-Excavation PlanningUtility clearance/NOC cross-checked against actual site conditions using GPR (ground penetrating radar) surveyGPR survey report with utility overlay markupsUtility Survey EngineerPrior to excavation
56Pre-Excavation PlanningCable/pipe locator (CAT & Genny) scan conducted and results marked on ground prior to mechanical excavationLocator scan log with photographs of marked routesSite SupervisorPrior to each excavation
57Pre-Excavation PlanningExcavation method statement includes utility strike emergency response procedure and authority emergency contactsApproved method statement with attached authority hotline listHSE ManagerPrior to excavation
58Pre-Excavation PlanningToolbox talk conducted on buried services risks before start of excavation worksSigned toolbox talk attendance sheetSite SupervisorDaily before excavation
59Pre-Excavation PlanningTrial pits (hand-dug/vacuum excavation) conducted within 0.5m of marked services before mechanical diggingTrial pit log with depth and location of exposed services recordedUtility Survey EngineerPrior to mechanical excavation
60Pre-Excavation PlanningBanksman/spotter assigned to supervise excavator operations near identified utility corridorsBanksman appointment letter and daily assignment recordSite SupervisorDaily during excavation
61Excavation MarkingPhysical marking (paint, flags, stakes) of underground utility alignment maintained and visible throughout worksSite photographs showing marking conditionSite SupervisorDaily
62Excavation MarkingColour-coded marker system used consistent with utility type (electrical, water, telecom, gas, sewer)Marking legend reference sheet posted at siteHSE OfficerWeekly
63Excavation MarkingBuried service depth and offset recorded against approved drawings for verificationSurvey verification report signed by surveyorLand SurveyorPrior to excavation
64Excavation MarkingWarning tape/mesh installed above shallow utilities prior to backfillingBackfill inspection photo showing tape placementSite EngineerPrior to backfilling
65Overhead Line PrecautionsOverhead power line clearance distances verified against DEWA safety clearance table for plant/crane operationsClearance calculation sheet referencing DEWA regulationHSE ManagerPrior to lifting operations
66Overhead Line PrecautionsGoal posts/height restriction barriers erected under overhead lines where plant movement is requiredBarrier installation photo and inspection recordSite SupervisorPrior to works commencement
67Overhead Line PrecautionsDEWA line de-energisation or diversion request submitted where required clearance cannot be maintainedApproved DEWA outage/diversion confirmation letterProject ManagerPrior to works near live lines
68Overhead Line PrecautionsCrane and boom equipment operators briefed on overhead line locations and minimum approach distancesSigned briefing record with site plan attachedCrane Operator/SupervisorPrior to each lift
69Overhead Line PrecautionsNon-conductive tag lines used when working plant/equipment near overhead electrical servicesEquipment inspection checklist noting tag line provisionRigger/Lifting SupervisorPrior to each lift
70Mechanical Excavation ControlsMechanical excavation restricted to areas outside utility exclusion zone unless authorised by permitPermit-to-dig with defined exclusion zone mapHSE ManagerEach excavation activity
71Mechanical Excavation ControlsExcavator bucket teeth condition and edge type verified suitable for proximity digging near servicesDaily plant inspection checklistPlant OperatorDaily
72Mechanical Excavation ControlsHand digging/vacuum excavation mandated within safety zone (typically 0.5m-1m) of confirmed utility locationMethod statement compliance recordSite SupervisorEach excavation near utility
73Mechanical Excavation ControlsExcavation depth monitored and compared to recorded utility depth to prevent inadvertent strikeExcavation depth log with utility depth cross-referenceSite EngineerContinuous during excavation
74Mechanical Excavation ControlsStop-work authority exercised immediately upon unexpected discovery of unmarked serviceIncident/near-miss report with photographsSite SupervisorAs required
75Emergency ResponseUtility strike emergency response plan displayed at site office and excavation work frontDisplayed emergency response poster with authority contact numbersHSE OfficerContinuous
76Emergency ResponseEmergency shut-off/isolation procedure rehearsed for gas, water or electrical strike scenariosEmergency drill record for utility strike scenarioHSE ManagerSemi-annually
77Emergency ResponseUtility strike incident reporting protocol includes immediate notification to DEWA/Etisalat/authority within stipulated timeframeIncident notification log with timestampsHSE ManagerAs required
78Emergency ResponseFirst aid and firefighting equipment available at excavation work front for gas/electrical strike responseEquipment inspection checklist at excavation siteSite SupervisorDaily
79Emergency ResponseArea isolation and evacuation procedure established for utility strike involving hazardous releaseEvacuation plan with assembly point designated near excavationHSE ManagerPrior to excavation
80Documentation & RecordsAs-built utility records updated and submitted to authority following exposure/relocation of servicesUpdated as-built drawing submission acknowledgementProject EngineerUpon utility exposure
81Documentation & RecordsUtility strike near-miss and incident register maintained and reviewed for trend analysisNear-miss register with monthly review minutesHSE ManagerMonthly
82Documentation & RecordsExcavation permit closed out with as-executed verification of backfill and reinstatementClosed permit with reinstatement inspection sign-offSite EngineerUpon completion
83Documentation & RecordsCompetency certificates for GPR/CAT scan operators verified and kept currentValid competency/training certificates on fileHSE ManagerAnnually / upon renewal
84Documentation & RecordsLessons learned from utility strike incidents communicated across project sitesLessons learned bulletin distribution recordHSE ManagerFollowing each incident
85Training & CompetencyExcavation supervisors trained on authority-specific dig permit requirements (RTA, DM, Trakhees, DEWA)Training attendance record and certificateTraining CoordinatorPrior to assignment
86Training & CompetencyPlant operators certified for excavator operation with utility awareness module includedOperator competency certificateHSE ManagerPrior to deployment
87Training & CompetencyRefresher training conducted following any utility strike incident on site or within the organisationRefresher training recordHSE ManagerPost-incident

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.