Workbook section 43
Owner
HSE Manager / Document Controller
Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plans TOC - Part E; Plan L143 Scaffold Inspection C; Plan E43 Emergency Drills Exerc
Checkpoints
92
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
11. Legionella Risk Assessment & GovernanceWater hygiene policy statement issued and endorsed by top managementSigned policy statement displayed and communicatedFacilities ManagerAnnually
21. Legionella Risk Assessment & GovernanceRisk assessment covers all buildings/blocks within project scope, not sampled subset onlyBuilding-by-building coverage list cross-checked against asset registerWater Hygiene ManagerAnnually
32. Cold Water Storage TanksTank material and lining verified compatible with potable water use (no lead/unsuitable coatings)Material compliance certificate on fileFacilities EngineerOn installation/annually
42. Cold Water Storage TanksTank capacity assessed against demand to avoid oversizing causing stagnationDemand calculation compared to installed tank volumeFacilities EngineerAnnually
53. Temperature Monitoring RegimeThermostatic mixing valve outlet temperature checked to prevent scald risk while maintaining controlOutlet temperature reading recorded within safe scald-prevention rangePlumbing EngineerAnnually
63. Temperature Monitoring RegimeData-logging temperature sensors (where installed) calibrated and data downloaded for reviewData logger download report reviewed against manual spot checksWater Hygiene TechnicianQuarterly
74. Little-Used Outlets & Dead LegsIsolation valves for decommissioned sections confirmed fully closed with no leak-throughValve isolation verification test recordedFacilities TechnicianOn decommissioning
84. Little-Used Outlets & Dead LegsOutlets in vacant tenancies included in flushing schedule with landlord/tenant coordinationCoordination record and flushing log for vacant unitsFacilities ManagerWeekly during vacancy
95. Cooling Towers & Evaporative SystemsCooling tower pack/fill media condition assessed and replaced when degradedFill media inspection report with replacement date if applicableFacilities EngineerAnnually
105. Cooling Towers & Evaporative SystemsCooling tower located to minimise aerosol drift towards air intakes and public areasSiting assessment or drift study on fileWater Hygiene ManagerOn installation
116. Sampling, Analysis & Laboratory ComplianceSample points selected represent worst-case and representative locations per risk assessmentSampling point rationale documented and matches schematicWater Hygiene ManagerAnnually
126. Sampling, Analysis & Laboratory ComplianceDuplicate/split samples periodically sent to a second laboratory for quality assuranceCross-lab comparison report retainedWater Hygiene ManagerAnnually
137. Building Services Water Systems (Domestic Hot/Cold)Calorifier/water heater sludge and scale removed during service to prevent nutrient buildupDescaling/desludging service record on fileWater Treatment ContractorAnnually
148. Spa Pools, Decorative Fountains & Special Risk SystemsHumidifiers and air washers included in water hygiene monitoring scope where installedHumidifier inspection and disinfection record on fileFacilities EngineerQuarterly
159. Documentation, Records & Regulatory ComplianceWater hygiene programme scope reviewed for alignment with facility management contract deliverablesFM contract SOW cross-checked against programme scopeFacilities ManagerAnnually
1610. Training, Competency & Contractor ManagementSubcontracted water hygiene laboratory/contractor change of personnel notified and competency re-verifiedNotification record and updated competency fileProcurement/Facilities ManagerOn personnel change
171. Legionella Risk Assessment & GovernanceLegionella risk assessment conducted for all water systems on site/facilityWritten risk assessment report available, dated and referencedCompetent Person (Water Hygiene)Annually or on system change
181. Legionella Risk Assessment & GovernanceResponsible person/duty holder for water hygiene formally appointedAppointment letter signed by senior management on fileFacilities ManagerOn appointment
191. Legionella Risk Assessment & GovernanceWater safety plan/scheme of control documented per recognised ACOP L8/HSG274 principlesWater safety plan document available and currentWater Hygiene ManagerAnnually
201. Legionella Risk Assessment & GovernanceRisk assessment reviewed after any significant system modification, shutdown or incidentReview record with date and trigger reason loggedWater Hygiene ManagerOn change/incident
211. Legionella Risk Assessment & GovernanceSchematic diagrams of hot and cold water systems maintained and accurateAs-built schematics available matching current system configurationFacilities EngineerAnnually
221. Legionella Risk Assessment & GovernanceRoles and responsibilities for sampling, monitoring and remedial action clearly assignedRACI matrix or org chart for water hygiene program on fileFacilities ManagerAnnually
231. Legionella Risk Assessment & GovernanceCompetency of assessor verified (qualified water hygiene consultant/City & Guilds or equivalent)Assessor certificate and CV verified against scopeFacilities ManagerPer contract
242. Cold Water Storage TanksCold water storage tanks inspected for cleanliness, integrity and covers/lids secureTank inspection report with photos attachedWater Hygiene TechnicianEvery 6 months
252. Cold Water Storage TanksTanks cleaned and disinfected per approved procedureDisinfection certificate with chlorine dose/contact time recordedWater Hygiene ContractorAnnually
262. Cold Water Storage TanksTank insulation verified to maintain cold water below 20°CTemperature log confirms compliance at tank outletWater Hygiene TechnicianQuarterly
272. Cold Water Storage TanksTank overflow, vents and screens checked for insect/vermin ingress protectionScreen integrity checklist completedFacilities TechnicianEvery 6 months
282. Cold Water Storage TanksWater turnover in tanks verified to prevent stagnation (no dead legs)Flow/turnover assessment record on fileWater Hygiene TechnicianQuarterly
292. Cold Water Storage TanksTank water sampled for microbiological analysis (TVC, Legionella)Lab certificate of analysis shows results within acceptable limitsAccredited LaboratoryQuarterly/Annually per risk
302. Cold Water Storage TanksTank access hatches sealed and locked to prevent unauthorised accessLock/seal integrity checked during inspectionFacilities TechnicianEvery 6 months
312. Cold Water Storage TanksMultiple tank installations checked for balanced flow to avoid stagnant tankFlow balance verification recordedWater Hygiene TechnicianEvery 6 months
323. Temperature Monitoring RegimeHot water calorifier/generator flow temperature maintained at or above 60°CTemperature log shows readings ≥60°C at sourceWater Hygiene TechnicianMonthly
333. Temperature Monitoring RegimeHot water return temperature maintained at or above 50°CTemperature log shows return readings ≥50°CWater Hygiene TechnicianMonthly
343. Temperature Monitoring RegimeCold water temperature at outlets confirmed below 20°C after 2-minute runTemperature log with timestamp and reading recordedWater Hygiene TechnicianMonthly
353. Temperature Monitoring RegimeSentinel taps (nearest and furthest from source) identified and monitored monthlySentinel point list matches schematic and log entriesWater Hygiene TechnicianMonthly
363. Temperature Monitoring RegimeTemperature monitoring records reviewed for anomalies and trendsTrend report generated and reviewed by responsible personWater Hygiene ManagerQuarterly
373. Temperature Monitoring RegimeNon-compliant temperature readings trigger documented corrective actionCorrective action log with close-out date and methodFacilities ManagerAs needed
383. Temperature Monitoring RegimeCalibration of temperature probes/thermometers verified against reference standardCalibration certificate current and traceableWater Hygiene TechnicianAnnually
393. Temperature Monitoring RegimeMixing valves (TMVs) serviced and checked for correct blended temperatureTMV service record with outlet temperature confirmed safePlumbing EngineerAnnually
404. Little-Used Outlets & Dead LegsLittle-used outlets identified and flushed per scheduleFlushing log with outlet ID, date and duration recordedFacilities TechnicianWeekly
414. Little-Used Outlets & Dead LegsDead legs and redundant pipework identified and removed or cappedPipework survey with removal/capping evidenceFacilities EngineerOn identification
424. Little-Used Outlets & Dead LegsFlushing procedure includes precautions against aerosol inhalation (PPE, low flow)PPE and method statement for flushing availableHSE OfficerPer flushing event
434. Little-Used Outlets & Dead LegsShowerheads and hoses descaled/disinfected and inspected for biofilmDescaling/cleaning record with date and outlet referenceFacilities TechnicianQuarterly
444. Little-Used Outlets & Dead LegsVacant/unoccupied areas water systems flushed before reoccupationPre-occupation flushing certificate on fileFacilities ManagerBefore reoccupation
454. Little-Used Outlets & Dead LegsSeasonal/unoccupied buildings flushing programme documented and executedSeasonal flushing schedule and completion log on fileFacilities ManagerMonthly during vacancy
465. Cooling Towers & Evaporative SystemsCooling towers registered with relevant municipal/health authority where requiredRegistration certificate/reference number on fileFacilities ManagerAnnually
475. Cooling Towers & Evaporative SystemsCooling tower water treatment program operating with biocide dosing controlDosing log and biocide residual results recordedWater Treatment ContractorWeekly
485. Cooling Towers & Evaporative SystemsCooling tower basin, fill and drift eliminators inspected for cleanliness and foulingInspection checklist with photographic evidenceWater Hygiene TechnicianMonthly
495. Cooling Towers & Evaporative SystemsCooling water sampled for Legionella and TVC per scheduleCertificate of analysis retained, action level thresholds checkedAccredited LaboratoryMonthly
505. Cooling Towers & Evaporative SystemsEmergency shutdown/shock dosing procedure in place for high Legionella countsDocumented escalation procedure with authority notification stepsWater Hygiene ManagerPer event
515. Cooling Towers & Evaporative SystemsCooling tower shutdown/mothballing procedure includes safe drain-down and disinfectionMothballing record with disinfection certificateFacilities EngineerOn shutdown
525. Cooling Towers & Evaporative SystemsCooling tower system log book maintained with dosing, cleaning and inspection entriesLog book reviewed complete and up to dateWater Treatment ContractorWeekly
536. Sampling, Analysis & Laboratory ComplianceWater samples collected using aseptic technique by trained personnelSampling method statement and technician training recordWater Hygiene TechnicianPer schedule
546. Sampling, Analysis & Laboratory ComplianceSamples analysed by UKAS/ISO 17025 accredited (or locally recognized) laboratoryLab accreditation certificate verified and currentWater Hygiene ManagerAnnually
556. Sampling, Analysis & Laboratory ComplianceSample chain-of-custody documented from collection to lab receiptChain-of-custody form completed and retainedWater Hygiene TechnicianPer sample
566. Sampling, Analysis & Laboratory ComplianceAction levels defined for Legionella count (e.g., >1000 cfu/L requires resample/remedial action)Escalation matrix documented and results comparedWater Hygiene ManagerPer result
576. Sampling, Analysis & Laboratory CompliancePositive Legionella results trigger immediate risk review and remedial action planIncident report with remedial action and re-sampling scheduleWater Hygiene ManagerOn positive result
586. Sampling, Analysis & Laboratory ComplianceSample results trended over time to identify recurring problem outletsTrend analysis report reviewed at management meetingWater Hygiene ManagerQuarterly
597. Building Services Water Systems (Domestic Hot/Cold)Water meters and pressure checked to identify leaks affecting stagnation riskPressure/flow test record on fileFacilities EngineerQuarterly
607. Building Services Water Systems (Domestic Hot/Cold)Booster pump sets and pressure vessels inspected for hygiene and corrosionInspection report with corrosion/hygiene statusFacilities EngineerEvery 6 months
617. Building Services Water Systems (Domestic Hot/Cold)Water softeners and filters serviced and backwashed as per manufacturer guidanceService record with backwash date and filter changeWater Treatment ContractorAs per manufacturer schedule
627. Building Services Water Systems (Domestic Hot/Cold)Point-of-use filters (where installed) changed per manufacturer scheduleFilter change log with date and batch referenceFacilities TechnicianAs per manufacturer schedule
637. Building Services Water Systems (Domestic Hot/Cold)Cross-connection and backflow prevention devices testedBackflow preventer test certificate currentPlumbing EngineerAnnually
647. Building Services Water Systems (Domestic Hot/Cold)Insulation of hot and cold pipework verified intact to maintain temperature differentialInsulation condition survey completedFacilities EngineerAnnually
658. Spa Pools, Decorative Fountains & Special Risk SystemsSpa pools/whirlpools tested for free chlorine/bromine and pH per schedulePool water test log within recommended chemical rangesPool OperatorDaily
668. Spa Pools, Decorative Fountains & Special Risk SystemsSpa pool filters backwashed and balance tanks drained/cleaned per scheduleBackwash and cleaning record maintainedPool Maintenance ContractorWeekly
678. Spa Pools, Decorative Fountains & Special Risk SystemsDecorative fountains/water features risk assessed for aerosol generationFountain-specific risk assessment on fileWater Hygiene ManagerAnnually
688. Spa Pools, Decorative Fountains & Special Risk SystemsEmergency eyewash/safety showers included in water hygiene monitoring scopeFlushing and temperature log for eyewash/shower stationsFacilities TechnicianWeekly
698. Spa Pools, Decorative Fountains & Special Risk SystemsSpa pool water fully drained, cleaned and disinfected per manufacturer/health authority scheduleDrain-clean-disinfect certificate on filePool Maintenance ContractorWeekly
709. Documentation, Records & Regulatory ComplianceWritten scheme of control retained on-site and available for inspectionDocument available in facility management office/EAMSFacilities ManagerOngoing
719. Documentation, Records & Regulatory ComplianceWater hygiene records retained for minimum period per authority/insurer requirementRecord retention log confirms minimum 5-year archiveDocument ControllerOngoing
729. Documentation, Records & Regulatory ComplianceCompliance verified against Dubai Municipality / Abu Dhabi Department of Health water quality and Legionella control guidelines as applicableLocal authority circular reference cited in water safety planHSE ManagerAnnually
739. Documentation, Records & Regulatory ComplianceCompliance verified against ESMA/UAE drinking water standards for potable water qualityESMA standard reference number cited in test scopeWater Hygiene ManagerAnnually
749. Documentation, Records & Regulatory ComplianceThird-party water hygiene audit conducted independent of routine contractorIndependent audit report with findings and closeout trackerHSE ManagerAnnually
759. Documentation, Records & Regulatory ComplianceLegionella outbreak/incident notification procedure aligned with public health authority reporting requirementsNotification procedure document references correct authority contactHSE ManagerPer incident
769. Documentation, Records & Regulatory ComplianceInsurance/liability cover for water hygiene contractor confirmed adequate for scopeInsurance certificate reviewed and filedProcurement/Facilities ManagerAnnually
7710. Training, Competency & Contractor ManagementWater hygiene contractor holds valid trade license and relevant competency certificationLicense and certification verified before contract awardProcurement/Facilities ManagerPer contract
7810. Training, Competency & Contractor ManagementFacilities personnel trained in legionella awareness and safe flushing proceduresTraining attendance record and certificates on fileHSE OfficerAnnually
7910. Training, Competency & Contractor ManagementMethod statement and risk assessment submitted by water hygiene contractor prior to worksMS/RA reviewed and approved before mobilisationHSE ManagerPer task
8010. Training, Competency & Contractor ManagementEmergency contact list for water hygiene issues displayed and currentContact list posted in plant room and control officeFacilities ManagerAnnually
8110. Training, Competency & Contractor ManagementContractor performance reviewed against KPIs for water hygiene programmeKPI scorecard completed and reviewed with contractorFacilities ManagerQuarterly
8211. New/Modified Systems & CommissioningNew water systems commissioned with disinfection prior to first useCommissioning disinfection certificate on fileCommissioning EngineerPre-handover
8311. New/Modified Systems & CommissioningPre-handover water sampling conducted and clear results obtained before occupationCertificate of analysis clear of Legionella before handoverWater Hygiene ManagerPre-handover
8411. New/Modified Systems & CommissioningTemporary water supplies during construction assessed for stagnation riskTemporary supply risk assessment and flushing plan availableSite EngineerPer project phase
8511. New/Modified Systems & CommissioningSystem modifications (pipework changes, new outlets) risk-assessed before commissioningModification risk assessment signed off prior to useWater Hygiene ManagerPer modification
8611. New/Modified Systems & CommissioningAs-built drawings updated and issued to facilities team post-commissioningUpdated drawings received and filed in O&M manualCommissioning EngineerPost-handover
8712. Emergency Response & Outbreak ManagementLegionella outbreak response plan documented with roles and escalation stepsOutbreak response plan available and communicated to key staffWater Hygiene ManagerAnnually
8812. Emergency Response & Outbreak ManagementEmergency shock chlorination/disinfection procedure available for rapid deploymentProcedure document with required materials and PPE listedWater Hygiene ContractorAnnually
8912. Emergency Response & Outbreak ManagementPublic health authority and occupier notification protocol established for suspected casesNotification protocol with correct authority contact detailsHSE ManagerAnnually
9012. Emergency Response & Outbreak ManagementPost-incident review conducted with corrective/preventive actions tracked to closurePost-incident report with CAPA closeout evidenceHSE ManagerPost-incident
9112. Emergency Response & Outbreak ManagementCommunication plan for building occupants during remedial works establishedOccupant notice/communication record on fileFacilities ManagerPer incident
9212. Emergency Response & Outbreak ManagementStandby/backup water hygiene contractor arrangement in place for emergency responseStandby contractor agreement or call-off contract availableFacilities ManagerAnnually

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.