Plans TOC - Part E; Plan L143 Scaffold Inspection C; Plan E43 Emergency Drills Exerc
Checkpoints
92
| # | Area | Checkpoint / Requirement | Evidence / Acceptance Criteria | Responsible | Frequency |
|---|---|---|---|---|---|
| 1 | 1. Legionella Risk Assessment & Governance | Water hygiene policy statement issued and endorsed by top management | Signed policy statement displayed and communicated | Facilities Manager | Annually |
| 2 | 1. Legionella Risk Assessment & Governance | Risk assessment covers all buildings/blocks within project scope, not sampled subset only | Building-by-building coverage list cross-checked against asset register | Water Hygiene Manager | Annually |
| 3 | 2. Cold Water Storage Tanks | Tank material and lining verified compatible with potable water use (no lead/unsuitable coatings) | Material compliance certificate on file | Facilities Engineer | On installation/annually |
| 4 | 2. Cold Water Storage Tanks | Tank capacity assessed against demand to avoid oversizing causing stagnation | Demand calculation compared to installed tank volume | Facilities Engineer | Annually |
| 5 | 3. Temperature Monitoring Regime | Thermostatic mixing valve outlet temperature checked to prevent scald risk while maintaining control | Outlet temperature reading recorded within safe scald-prevention range | Plumbing Engineer | Annually |
| 6 | 3. Temperature Monitoring Regime | Data-logging temperature sensors (where installed) calibrated and data downloaded for review | Data logger download report reviewed against manual spot checks | Water Hygiene Technician | Quarterly |
| 7 | 4. Little-Used Outlets & Dead Legs | Isolation valves for decommissioned sections confirmed fully closed with no leak-through | Valve isolation verification test recorded | Facilities Technician | On decommissioning |
| 8 | 4. Little-Used Outlets & Dead Legs | Outlets in vacant tenancies included in flushing schedule with landlord/tenant coordination | Coordination record and flushing log for vacant units | Facilities Manager | Weekly during vacancy |
| 9 | 5. Cooling Towers & Evaporative Systems | Cooling tower pack/fill media condition assessed and replaced when degraded | Fill media inspection report with replacement date if applicable | Facilities Engineer | Annually |
| 10 | 5. Cooling Towers & Evaporative Systems | Cooling tower located to minimise aerosol drift towards air intakes and public areas | Siting assessment or drift study on file | Water Hygiene Manager | On installation |
| 11 | 6. Sampling, Analysis & Laboratory Compliance | Sample points selected represent worst-case and representative locations per risk assessment | Sampling point rationale documented and matches schematic | Water Hygiene Manager | Annually |
| 12 | 6. Sampling, Analysis & Laboratory Compliance | Duplicate/split samples periodically sent to a second laboratory for quality assurance | Cross-lab comparison report retained | Water Hygiene Manager | Annually |
| 13 | 7. Building Services Water Systems (Domestic Hot/Cold) | Calorifier/water heater sludge and scale removed during service to prevent nutrient buildup | Descaling/desludging service record on file | Water Treatment Contractor | Annually |
| 14 | 8. Spa Pools, Decorative Fountains & Special Risk Systems | Humidifiers and air washers included in water hygiene monitoring scope where installed | Humidifier inspection and disinfection record on file | Facilities Engineer | Quarterly |
| 15 | 9. Documentation, Records & Regulatory Compliance | Water hygiene programme scope reviewed for alignment with facility management contract deliverables | FM contract SOW cross-checked against programme scope | Facilities Manager | Annually |
| 16 | 10. Training, Competency & Contractor Management | Subcontracted water hygiene laboratory/contractor change of personnel notified and competency re-verified | Notification record and updated competency file | Procurement/Facilities Manager | On personnel change |
| 17 | 1. Legionella Risk Assessment & Governance | Legionella risk assessment conducted for all water systems on site/facility | Written risk assessment report available, dated and referenced | Competent Person (Water Hygiene) | Annually or on system change |
| 18 | 1. Legionella Risk Assessment & Governance | Responsible person/duty holder for water hygiene formally appointed | Appointment letter signed by senior management on file | Facilities Manager | On appointment |
| 19 | 1. Legionella Risk Assessment & Governance | Water safety plan/scheme of control documented per recognised ACOP L8/HSG274 principles | Water safety plan document available and current | Water Hygiene Manager | Annually |
| 20 | 1. Legionella Risk Assessment & Governance | Risk assessment reviewed after any significant system modification, shutdown or incident | Review record with date and trigger reason logged | Water Hygiene Manager | On change/incident |
| 21 | 1. Legionella Risk Assessment & Governance | Schematic diagrams of hot and cold water systems maintained and accurate | As-built schematics available matching current system configuration | Facilities Engineer | Annually |
| 22 | 1. Legionella Risk Assessment & Governance | Roles and responsibilities for sampling, monitoring and remedial action clearly assigned | RACI matrix or org chart for water hygiene program on file | Facilities Manager | Annually |
| 23 | 1. Legionella Risk Assessment & Governance | Competency of assessor verified (qualified water hygiene consultant/City & Guilds or equivalent) | Assessor certificate and CV verified against scope | Facilities Manager | Per contract |
| 24 | 2. Cold Water Storage Tanks | Cold water storage tanks inspected for cleanliness, integrity and covers/lids secure | Tank inspection report with photos attached | Water Hygiene Technician | Every 6 months |
| 25 | 2. Cold Water Storage Tanks | Tanks cleaned and disinfected per approved procedure | Disinfection certificate with chlorine dose/contact time recorded | Water Hygiene Contractor | Annually |
| 26 | 2. Cold Water Storage Tanks | Tank insulation verified to maintain cold water below 20°C | Temperature log confirms compliance at tank outlet | Water Hygiene Technician | Quarterly |
| 27 | 2. Cold Water Storage Tanks | Tank overflow, vents and screens checked for insect/vermin ingress protection | Screen integrity checklist completed | Facilities Technician | Every 6 months |
| 28 | 2. Cold Water Storage Tanks | Water turnover in tanks verified to prevent stagnation (no dead legs) | Flow/turnover assessment record on file | Water Hygiene Technician | Quarterly |
| 29 | 2. Cold Water Storage Tanks | Tank water sampled for microbiological analysis (TVC, Legionella) | Lab certificate of analysis shows results within acceptable limits | Accredited Laboratory | Quarterly/Annually per risk |
| 30 | 2. Cold Water Storage Tanks | Tank access hatches sealed and locked to prevent unauthorised access | Lock/seal integrity checked during inspection | Facilities Technician | Every 6 months |
| 31 | 2. Cold Water Storage Tanks | Multiple tank installations checked for balanced flow to avoid stagnant tank | Flow balance verification recorded | Water Hygiene Technician | Every 6 months |
| 32 | 3. Temperature Monitoring Regime | Hot water calorifier/generator flow temperature maintained at or above 60°C | Temperature log shows readings ≥60°C at source | Water Hygiene Technician | Monthly |
| 33 | 3. Temperature Monitoring Regime | Hot water return temperature maintained at or above 50°C | Temperature log shows return readings ≥50°C | Water Hygiene Technician | Monthly |
| 34 | 3. Temperature Monitoring Regime | Cold water temperature at outlets confirmed below 20°C after 2-minute run | Temperature log with timestamp and reading recorded | Water Hygiene Technician | Monthly |
| 35 | 3. Temperature Monitoring Regime | Sentinel taps (nearest and furthest from source) identified and monitored monthly | Sentinel point list matches schematic and log entries | Water Hygiene Technician | Monthly |
| 36 | 3. Temperature Monitoring Regime | Temperature monitoring records reviewed for anomalies and trends | Trend report generated and reviewed by responsible person | Water Hygiene Manager | Quarterly |
| 37 | 3. Temperature Monitoring Regime | Non-compliant temperature readings trigger documented corrective action | Corrective action log with close-out date and method | Facilities Manager | As needed |
| 38 | 3. Temperature Monitoring Regime | Calibration of temperature probes/thermometers verified against reference standard | Calibration certificate current and traceable | Water Hygiene Technician | Annually |
| 39 | 3. Temperature Monitoring Regime | Mixing valves (TMVs) serviced and checked for correct blended temperature | TMV service record with outlet temperature confirmed safe | Plumbing Engineer | Annually |
| 40 | 4. Little-Used Outlets & Dead Legs | Little-used outlets identified and flushed per schedule | Flushing log with outlet ID, date and duration recorded | Facilities Technician | Weekly |
| 41 | 4. Little-Used Outlets & Dead Legs | Dead legs and redundant pipework identified and removed or capped | Pipework survey with removal/capping evidence | Facilities Engineer | On identification |
| 42 | 4. Little-Used Outlets & Dead Legs | Flushing procedure includes precautions against aerosol inhalation (PPE, low flow) | PPE and method statement for flushing available | HSE Officer | Per flushing event |
| 43 | 4. Little-Used Outlets & Dead Legs | Showerheads and hoses descaled/disinfected and inspected for biofilm | Descaling/cleaning record with date and outlet reference | Facilities Technician | Quarterly |
| 44 | 4. Little-Used Outlets & Dead Legs | Vacant/unoccupied areas water systems flushed before reoccupation | Pre-occupation flushing certificate on file | Facilities Manager | Before reoccupation |
| 45 | 4. Little-Used Outlets & Dead Legs | Seasonal/unoccupied buildings flushing programme documented and executed | Seasonal flushing schedule and completion log on file | Facilities Manager | Monthly during vacancy |
| 46 | 5. Cooling Towers & Evaporative Systems | Cooling towers registered with relevant municipal/health authority where required | Registration certificate/reference number on file | Facilities Manager | Annually |
| 47 | 5. Cooling Towers & Evaporative Systems | Cooling tower water treatment program operating with biocide dosing control | Dosing log and biocide residual results recorded | Water Treatment Contractor | Weekly |
| 48 | 5. Cooling Towers & Evaporative Systems | Cooling tower basin, fill and drift eliminators inspected for cleanliness and fouling | Inspection checklist with photographic evidence | Water Hygiene Technician | Monthly |
| 49 | 5. Cooling Towers & Evaporative Systems | Cooling water sampled for Legionella and TVC per schedule | Certificate of analysis retained, action level thresholds checked | Accredited Laboratory | Monthly |
| 50 | 5. Cooling Towers & Evaporative Systems | Emergency shutdown/shock dosing procedure in place for high Legionella counts | Documented escalation procedure with authority notification steps | Water Hygiene Manager | Per event |
| 51 | 5. Cooling Towers & Evaporative Systems | Cooling tower shutdown/mothballing procedure includes safe drain-down and disinfection | Mothballing record with disinfection certificate | Facilities Engineer | On shutdown |
| 52 | 5. Cooling Towers & Evaporative Systems | Cooling tower system log book maintained with dosing, cleaning and inspection entries | Log book reviewed complete and up to date | Water Treatment Contractor | Weekly |
| 53 | 6. Sampling, Analysis & Laboratory Compliance | Water samples collected using aseptic technique by trained personnel | Sampling method statement and technician training record | Water Hygiene Technician | Per schedule |
| 54 | 6. Sampling, Analysis & Laboratory Compliance | Samples analysed by UKAS/ISO 17025 accredited (or locally recognized) laboratory | Lab accreditation certificate verified and current | Water Hygiene Manager | Annually |
| 55 | 6. Sampling, Analysis & Laboratory Compliance | Sample chain-of-custody documented from collection to lab receipt | Chain-of-custody form completed and retained | Water Hygiene Technician | Per sample |
| 56 | 6. Sampling, Analysis & Laboratory Compliance | Action levels defined for Legionella count (e.g., >1000 cfu/L requires resample/remedial action) | Escalation matrix documented and results compared | Water Hygiene Manager | Per result |
| 57 | 6. Sampling, Analysis & Laboratory Compliance | Positive Legionella results trigger immediate risk review and remedial action plan | Incident report with remedial action and re-sampling schedule | Water Hygiene Manager | On positive result |
| 58 | 6. Sampling, Analysis & Laboratory Compliance | Sample results trended over time to identify recurring problem outlets | Trend analysis report reviewed at management meeting | Water Hygiene Manager | Quarterly |
| 59 | 7. Building Services Water Systems (Domestic Hot/Cold) | Water meters and pressure checked to identify leaks affecting stagnation risk | Pressure/flow test record on file | Facilities Engineer | Quarterly |
| 60 | 7. Building Services Water Systems (Domestic Hot/Cold) | Booster pump sets and pressure vessels inspected for hygiene and corrosion | Inspection report with corrosion/hygiene status | Facilities Engineer | Every 6 months |
| 61 | 7. Building Services Water Systems (Domestic Hot/Cold) | Water softeners and filters serviced and backwashed as per manufacturer guidance | Service record with backwash date and filter change | Water Treatment Contractor | As per manufacturer schedule |
| 62 | 7. Building Services Water Systems (Domestic Hot/Cold) | Point-of-use filters (where installed) changed per manufacturer schedule | Filter change log with date and batch reference | Facilities Technician | As per manufacturer schedule |
| 63 | 7. Building Services Water Systems (Domestic Hot/Cold) | Cross-connection and backflow prevention devices tested | Backflow preventer test certificate current | Plumbing Engineer | Annually |
| 64 | 7. Building Services Water Systems (Domestic Hot/Cold) | Insulation of hot and cold pipework verified intact to maintain temperature differential | Insulation condition survey completed | Facilities Engineer | Annually |
| 65 | 8. Spa Pools, Decorative Fountains & Special Risk Systems | Spa pools/whirlpools tested for free chlorine/bromine and pH per schedule | Pool water test log within recommended chemical ranges | Pool Operator | Daily |
| 66 | 8. Spa Pools, Decorative Fountains & Special Risk Systems | Spa pool filters backwashed and balance tanks drained/cleaned per schedule | Backwash and cleaning record maintained | Pool Maintenance Contractor | Weekly |
| 67 | 8. Spa Pools, Decorative Fountains & Special Risk Systems | Decorative fountains/water features risk assessed for aerosol generation | Fountain-specific risk assessment on file | Water Hygiene Manager | Annually |
| 68 | 8. Spa Pools, Decorative Fountains & Special Risk Systems | Emergency eyewash/safety showers included in water hygiene monitoring scope | Flushing and temperature log for eyewash/shower stations | Facilities Technician | Weekly |
| 69 | 8. Spa Pools, Decorative Fountains & Special Risk Systems | Spa pool water fully drained, cleaned and disinfected per manufacturer/health authority schedule | Drain-clean-disinfect certificate on file | Pool Maintenance Contractor | Weekly |
| 70 | 9. Documentation, Records & Regulatory Compliance | Written scheme of control retained on-site and available for inspection | Document available in facility management office/EAMS | Facilities Manager | Ongoing |
| 71 | 9. Documentation, Records & Regulatory Compliance | Water hygiene records retained for minimum period per authority/insurer requirement | Record retention log confirms minimum 5-year archive | Document Controller | Ongoing |
| 72 | 9. Documentation, Records & Regulatory Compliance | Compliance verified against Dubai Municipality / Abu Dhabi Department of Health water quality and Legionella control guidelines as applicable | Local authority circular reference cited in water safety plan | HSE Manager | Annually |
| 73 | 9. Documentation, Records & Regulatory Compliance | Compliance verified against ESMA/UAE drinking water standards for potable water quality | ESMA standard reference number cited in test scope | Water Hygiene Manager | Annually |
| 74 | 9. Documentation, Records & Regulatory Compliance | Third-party water hygiene audit conducted independent of routine contractor | Independent audit report with findings and closeout tracker | HSE Manager | Annually |
| 75 | 9. Documentation, Records & Regulatory Compliance | Legionella outbreak/incident notification procedure aligned with public health authority reporting requirements | Notification procedure document references correct authority contact | HSE Manager | Per incident |
| 76 | 9. Documentation, Records & Regulatory Compliance | Insurance/liability cover for water hygiene contractor confirmed adequate for scope | Insurance certificate reviewed and filed | Procurement/Facilities Manager | Annually |
| 77 | 10. Training, Competency & Contractor Management | Water hygiene contractor holds valid trade license and relevant competency certification | License and certification verified before contract award | Procurement/Facilities Manager | Per contract |
| 78 | 10. Training, Competency & Contractor Management | Facilities personnel trained in legionella awareness and safe flushing procedures | Training attendance record and certificates on file | HSE Officer | Annually |
| 79 | 10. Training, Competency & Contractor Management | Method statement and risk assessment submitted by water hygiene contractor prior to works | MS/RA reviewed and approved before mobilisation | HSE Manager | Per task |
| 80 | 10. Training, Competency & Contractor Management | Emergency contact list for water hygiene issues displayed and current | Contact list posted in plant room and control office | Facilities Manager | Annually |
| 81 | 10. Training, Competency & Contractor Management | Contractor performance reviewed against KPIs for water hygiene programme | KPI scorecard completed and reviewed with contractor | Facilities Manager | Quarterly |
| 82 | 11. New/Modified Systems & Commissioning | New water systems commissioned with disinfection prior to first use | Commissioning disinfection certificate on file | Commissioning Engineer | Pre-handover |
| 83 | 11. New/Modified Systems & Commissioning | Pre-handover water sampling conducted and clear results obtained before occupation | Certificate of analysis clear of Legionella before handover | Water Hygiene Manager | Pre-handover |
| 84 | 11. New/Modified Systems & Commissioning | Temporary water supplies during construction assessed for stagnation risk | Temporary supply risk assessment and flushing plan available | Site Engineer | Per project phase |
| 85 | 11. New/Modified Systems & Commissioning | System modifications (pipework changes, new outlets) risk-assessed before commissioning | Modification risk assessment signed off prior to use | Water Hygiene Manager | Per modification |
| 86 | 11. New/Modified Systems & Commissioning | As-built drawings updated and issued to facilities team post-commissioning | Updated drawings received and filed in O&M manual | Commissioning Engineer | Post-handover |
| 87 | 12. Emergency Response & Outbreak Management | Legionella outbreak response plan documented with roles and escalation steps | Outbreak response plan available and communicated to key staff | Water Hygiene Manager | Annually |
| 88 | 12. Emergency Response & Outbreak Management | Emergency shock chlorination/disinfection procedure available for rapid deployment | Procedure document with required materials and PPE listed | Water Hygiene Contractor | Annually |
| 89 | 12. Emergency Response & Outbreak Management | Public health authority and occupier notification protocol established for suspected cases | Notification protocol with correct authority contact details | HSE Manager | Annually |
| 90 | 12. Emergency Response & Outbreak Management | Post-incident review conducted with corrective/preventive actions tracked to closure | Post-incident report with CAPA closeout evidence | HSE Manager | Post-incident |
| 91 | 12. Emergency Response & Outbreak Management | Communication plan for building occupants during remedial works established | Occupant notice/communication record on file | Facilities Manager | Per incident |
| 92 | 12. Emergency Response & Outbreak Management | Standby/backup water hygiene contractor arrangement in place for emergency response | Standby contractor agreement or call-off contract available | Facilities Manager | Annually |
Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.