Review / trigger
Annual review; update immediately if legal, authority, project, client, or scope requirements change.
Primary references
Plans TOC - Part J; J - Security Threat Response; Plan J114 Missile Projectile Su; E - Security Threat Matrix
Checkpoints
88
Open live checklist
#AreaCheckpoint / RequirementEvidence / Acceptance CriteriaResponsibleFrequency
1Site Threat Risk CategorizationSite categorized by proximity risk level (low/medium/high) to border regions or strategic assets to determine applicable precaution tierRisk categorization record approved by senior management with basis for ratingProject DirectorPrior to mobilization; reviewed annually
2Site Threat Risk CategorizationInsurance and client contract reviewed to confirm force majeure and security-escalation clauses address missile/projectile riskContract review memo confirming applicable clauses identifiedContracts ManagerPrior to contract execution
3Structural Hardening & Design ConsiderationsNew temporary facilities (site offices, labor camps) sited and oriented to minimize exposure to potential debris trajectories where risk assessed as elevatedSiting justification note referencing risk assessmentSite EngineerPrior to installation
4Structural Hardening & Design ConsiderationsGlazing and lightweight cladding in occupied site buildings assessed for shatter/fragmentation risk and mitigation applied (film, blast curtains) where warrantedMitigation installation inspection recordSite EngineerReviewed annually
5Fuel, Chemical & Hazardous Materials ProtectionFuel storage tanks and hazardous material stores assessed for secondary explosion/fire risk in event of nearby projectile impactVulnerability assessment record with separation distances confirmedHSE ManagerReviewed annually
6Fuel, Chemical & Hazardous Materials ProtectionEmergency shutdown procedure for fuel/gas systems established for rapid isolation during a security incidentEmergency shutdown drill record with isolation time loggedSite EngineerSemi-annually
7Personal Protective MeasuresAvailability of ballistic/fragmentation protective equipment assessed and provided to designated personnel in high-risk zones where warranted by risk assessmentPPE issue record and risk-based justification on fileHSE ManagerReviewed annually
8Personal Protective MeasuresSite first-aid kits upgraded with trauma/hemorrhage control supplies (tourniquets, hemostatic dressings) for blast-type injuriesFirst-aid kit inventory checklist confirming trauma supplies presentHSE OfficerMonthly inspection
9Labor Accommodation Security PreparednessLabor accommodation camps included within the site emergency response plan with designated shelter and muster arrangementsLabor camp ERP annex with shelter locations mappedCamp Welfare OfficerReviewed annually
10Labor Accommodation Security PreparednessCamp boss/welfare officer trained to disseminate security alerts to residents outside working hoursTraining record for camp boss on alert dissemination procedureHR ManagerAnnually
11Transportation & Journey ManagementBus/transport routes to and from site reviewed for exposure to known higher-risk corridors during periods of tensionRoute risk review record with alternative routing planLogistics ManagerReviewed during elevated tension
12Transportation & Journey ManagementDrivers briefed on emergency stop/shelter procedure if alert received while workforce is in transitDriver briefing acknowledgement recordLogistics ManagerPrior to elevated alert period and annually
13Insurance Claims & Financial ContinuityProcedure defined for documenting and submitting insurance claims arising from security-related property damage or business interruptionClaims procedure document with required evidence checklistFinance/Insurance CoordinatorReviewed annually
14Insurance Claims & Financial ContinuityPhotographic and video baseline of site assets maintained to support any future damage claim substantiationBaseline documentation archive with date-stamped recordsDocument ControllerQuarterly update
15Supply Chain & Material ContinuityContingency plan established for alternative material/equipment supply routes in case of regional disruption to logisticsContingency supply chain plan with alternative supplier listProcurement ManagerReviewed annually
16Supply Chain & Material ContinuityCritical spare parts and consumables stock levels reviewed to buffer against potential short-term supply interruption during regional tensionStock level review record with reorder point confirmationProcurement ManagerQuarterly
17Site Lighting & Nighttime PreparednessEmergency lighting at shelters and evacuation routes verified functional for use during nighttime security incidents or power lossEmergency lighting test log with battery backup duration recordedFacilities ManagerMonthly
18Site Lighting & Nighttime PreparednessNight shift supervisors briefed on distinct nighttime alert response procedure given reduced visibility and staffingNight shift briefing record signed by attendeesSite SupervisorQuarterly
19Sub-Contractor & Visitor IntegrationSubcontractors' workforce included in security induction and alert notification system prior to site accessSubcontractor induction record including security moduleHSE OfficerPrior to subcontractor mobilization
20Sub-Contractor & Visitor IntegrationVisitor sign-in process includes brief security safety notice covering shelter location and alert signal recognitionVisitor briefing acknowledgement logSecurity OfficerEach visit
21Media, Information Control & Rumor ManagementSingle authorized spokesperson designated for any external/media communication regarding site security incidentsCommunication policy document naming authorized spokespersonProject DirectorReviewed annually
22Media, Information Control & Rumor ManagementGuidance issued to workforce against sharing unverified security information via personal social media/messaging groupsSigned acknowledgement of social media conduct guidanceHR ManagerInduction and annually
23Post-Escalation Return-to-Work ProcedureFormal stand-down and return-to-work procedure defined requiring authority/management clearance before resuming site operations after an alertReturn-to-work authorization record signed by Project DirectorProject DirectorEach occurrence
24Post-Escalation Return-to-Work ProcedureSite inspection for latent damage or hazards conducted before workforce remobilization following any security escalationPost-escalation site inspection checklist signed by Site EngineerSite EngineerEach occurrence
25Continuous Threat Intelligence ReviewSubscription/access maintained to a reputable regional security intelligence advisory service supplementing government alertsSubscription confirmation and periodic advisory receipt logSecurity ManagerOngoing
26Threat Monitoring & Early WarningSite subscribed to NCEMA (National Emergency Crisis and Disasters Management Authority) public alert notifications and regional security advisoriesSubscription confirmation and alert receipt log maintainedHSE ManagerOngoing
27Threat Monitoring & Early WarningDesignated monitoring officer tracks official UAE government channels (NCEMA, Ministry of Interior) for security threat updates during heightened alert periodsMonitoring log with timestamps of checks and any alerts receivedSecurity OfficerContinuous during alert period, otherwise daily
28Threat Monitoring & Early WarningSite management maintains direct communication line with local Police Operations Room for real-time threat updatesContact list verified and test call log on fileSecurity ManagerMonthly test/verification
29Threat Monitoring & Early WarningRadio/mobile alert system in place to relay government emergency broadcast (e.g., sirens, SMS alerts) to all site personnelSystem test log confirming alert reception across site zonesIT/Communications OfficerMonthly
30Threat Monitoring & Early WarningThreat level classification (normal/elevated/high) reviewed daily and communicated to site supervisors during periods of regional tensionDaily threat level briefing record signed by Project ManagerProject ManagerDaily during elevated tension
31Emergency Response Plan & GovernanceSite-specific Missile/Projectile Threat Emergency Response Plan developed and approved, aligned with NCEMA national guidanceApproved ERP document with revision history and sign-offHSE ManagerReviewed annually
32Emergency Response Plan & GovernanceEmergency Response Team (ERT) roles and responsibilities defined for security threat scenarios, including incident commander designationERT organization chart with named personnel and contact detailsProject DirectorReviewed annually
33Emergency Response Plan & GovernanceEmergency Response Plan cross-references Civil Defence and Police emergency procedures applicable to the EmirateReference matrix linking site ERP clauses to Civil Defence/Police SOPsHSE ManagerReviewed annually
34Emergency Response Plan & GovernancePlan defines specific actions for 'shelter-in-place' versus 'evacuate' decisions based on nature of threatDecision-tree flowchart included in ERP and posted at muster pointsHSE ManagerReviewed annually
35Emergency Response Plan & GovernanceBusiness continuity arrangements documented for extended site shutdown due to regional security escalationBusiness continuity plan approved by senior managementProject DirectorReviewed annually
36Emergency Response Plan & GovernanceERP legally and operationally reviewed against latest NCEMA National Emergency Response and Crisis Management Framework updatesReview record referencing framework version and update dateCompliance/Legal OfficerAnnually or upon framework update
37Shelter-in-Place & Protected AreasDesignated hardened shelter/refuge areas identified on site capable of providing protection from projectile/debris hazardsSite plan marking shelter locations verified by structural assessmentSite EngineerPrior to mobilization; reviewed annually
38Shelter-in-Place & Protected AreasShelter areas stocked with emergency supplies (first aid, water, torches, communication device)Shelter inventory checklist completed and signedHSE OfficerMonthly inspection
39Shelter-in-Place & Protected AreasCapacity of shelter areas assessed and confirmed adequate for full site workforce populationCapacity calculation record cross-checked against workforce headcountHSE ManagerReviewed quarterly or upon headcount change
40Shelter-in-Place & Protected AreasClear signage and lighting installed directing personnel to nearest shelter/refuge pointSignage inspection checklist with photographic evidenceHSE OfficerMonthly
41Shelter-in-Place & Protected AreasShelter structural integrity inspected periodically to confirm continued suitability as protective areaStructural inspection report signed by qualified engineerSite EngineerSemi-annually
42Alert Notification & Communication ProtocolsSite-wide alarm/siren system distinguishable from fire alarm established for security threat notificationAlarm distinctiveness test record with staff feedback confirmationHSE ManagerQuarterly test
43Alert Notification & Communication ProtocolsMulti-language (Arabic/English/Urdu/Hindi etc.) emergency announcements prepared for diverse workforceRecorded announcement scripts reviewed for language coverageHR/HSEReviewed annually
44Alert Notification & Communication ProtocolsCommunication tree established to cascade alerts from site management down to individual work crews within defined time targetCommunication tree diagram with tested response time logProject ManagerQuarterly drill
45Alert Notification & Communication ProtocolsBackup communication method (satellite phone/radio) available in case of mobile network disruption during crisisEquipment functionality test logCommunications OfficerMonthly
46Alert Notification & Communication ProtocolsLiaison protocol established with client/consultant and relevant government authority for real-time incident reporting during a security eventLiaison contact matrix with escalation timelines documentedProject DirectorReviewed annually
47Evacuation & Muster ProceduresEvacuation routes for security threat scenarios distinct from standard fire evacuation routes are defined where requiredEvacuation route map annotated for security-specific scenarioHSE ManagerReviewed annually
48Evacuation & Muster ProceduresMuster points assessed for exposure risk and relocated away from glazed facades/open areas if in elevated threat zonesMuster point risk assessment recordHSE OfficerReviewed annually or upon threat escalation
49Evacuation & Muster ProceduresHeadcount and roll-call procedure verified achievable within target time during security evacuation drillsDrill roll-call time log compared against target benchmarkSite SupervisorSemi-annual drill
50Evacuation & Muster ProceduresTransport arrangements pre-planned for mass evacuation of workforce from site to safe accommodation/muster areaTransport mobilization plan with vehicle/driver contact listLogistics ManagerReviewed annually
51Evacuation & Muster ProceduresVulnerable personnel (visitors, contractors unfamiliar with site) accounted for in evacuation headcount procedureVisitor/contractor sign-in log cross-checked during drillsSecurity OfficerEach drill and daily operations
52Incident Response to Projectile/Debris ImpactProcedure defined for immediate area isolation and non-disturbance of impact site pending Police/Civil Defence attendanceWritten SOP for impact site isolation with cordon distances specifiedHSE ManagerReviewed annually
53Incident Response to Projectile/Debris ImpactFirst responders trained in triage for blast/fragmentation injuries as part of enhanced first-aid trainingTraining certificates for first responders covering trauma/blast injury careHSE ManagerAnnually
54Incident Response to Projectile/Debris ImpactEmergency medical response coordination established with nearest hospital/Ambulance service (999) for mass casualty scenariosMOU or coordination letter with medical facility on fileHSE ManagerReviewed annually
55Incident Response to Projectile/Debris ImpactReporting protocol to Civil Defence and Police established for any confirmed or suspected projectile/debris impact on or near siteIncident notification log with authority reference numberSecurity OfficerImmediate, each occurrence
56Incident Response to Projectile/Debris ImpactPost-incident site security established to prevent access to hazardous debris until cleared by authoritiesAccess control log showing restricted zone during clearance operationSecurity ManagerEach occurrence
57Incident Response to Projectile/Debris ImpactDamage assessment procedure implemented following any confirmed impact to determine structural/utility safety before resuming workStructural/utility assessment report signed off by competent engineerSite EngineerEach occurrence
58Workforce Communication & Psychological SupportRegular briefings held to keep workforce informed of security situation and reduce rumor-driven panicBriefing attendance record and content summaryHR ManagerWeekly during elevated tension
59Workforce Communication & Psychological SupportAccess to psychological first aid/counselling support arranged for workforce affected by security incidentsCounselling service agreement and utilization log (anonymized)HR ManagerAvailable ongoing; reviewed after incident
60Workforce Communication & Psychological SupportMultilingual information materials on threat response actions distributed to entire workforceDistribution log confirming receipt across all language groupsHR/HSEPrior to mobilization and upon update
61Workforce Communication & Psychological SupportGrievance/feedback channel available for workforce concerns regarding security risk exposureFeedback log with response and closure trackingHR ManagerOngoing
62Workforce Communication & Psychological SupportAbsenteeism and workforce welfare monitored during periods of regional tension to identify support needsWelfare monitoring report reviewed by HR/HSEHR ManagerWeekly during elevated tension
63Coordination with Government & External AuthoritiesSite registered with local Police/Civil Defence civil protection unit as an active construction site for priority emergency responseRegistration confirmation letter on fileProject ManagerPrior to mobilization; renewed annually
64Coordination with Government & External AuthoritiesEmergency contact list including Police (999/901), Civil Defence (997), Ambulance (998) and NCEMA hotline posted at key locationsPhotograph of posted emergency contact list at site office, gate, and mess hallHSE OfficerMonthly verification
65Coordination with Government & External AuthoritiesCoordination meeting held with local authorities prior to high-risk periods or major events to confirm site-specific security arrangementsMeeting minutes with attendee list and action itemsProject DirectorAhead of identified high-risk periods
66Coordination with Government & External AuthoritiesSite participates in any government-mandated security drills or briefings applicable to the sector/emirateAttendance/participation certificate from government-led drillHSE ManagerAs scheduled by authority
67Coordination with Government & External AuthoritiesCompliance with any Emirate-specific directives (curfews, restricted zones, work stoppages) issued during security escalations tracked and implementedDirective compliance log with implementation date and evidenceProject ManagerImmediate upon directive issuance
68Critical Infrastructure & Asset ProtectionCritical utilities (fuel storage, gas lines, electrical substations) on site assessed for vulnerability to projectile/blast damageVulnerability assessment report with mitigation recommendationsSite EngineerReviewed annually
69Critical Infrastructure & Asset ProtectionPhysical protective measures (blast walls, bunding, shielding) implemented for high-risk assets where recommended by risk assessmentInspection record confirming protective measures installed and maintainedHSE ManagerSemi-annually
70Critical Infrastructure & Asset ProtectionBackup power and water supply arrangements verified to sustain site operations during short-term disruptionBackup system test log with runtime resultsFacilities ManagerQuarterly
71Critical Infrastructure & Asset ProtectionSensitive documents and data backed up off-site/cloud to protect against loss from security-related site disruptionBackup verification log with last successful backup dateIT ManagerWeekly
72Critical Infrastructure & Asset ProtectionInsurance coverage reviewed to confirm inclusion of war/terrorism/political violence risk endorsements relevant to regional threat exposureInsurance policy review record with broker confirmationProject DirectorAnnually
73Training, Drills & Continuous ImprovementMandatory induction training includes site-specific security threat response procedures for all new personnelInduction training record with security module sign-offHR/HSEEach new hire induction
74Training, Drills & Continuous ImprovementFull-scale security emergency drill (simulated missile/projectile alert) conducted with debrief and improvement actions trackedDrill report including scenario, timings, observations and corrective actionsHSE ManagerSemi-annually
75Training, Drills & Continuous ImprovementToolbox talks delivered periodically on recognizing and responding to regional security alerts and shelter proceduresToolbox talk record with date, topic and attendee signaturesSite SupervisorQuarterly
76Training, Drills & Continuous ImprovementAfter-action review conducted following any real security incident or drill to update ERP and checklist accordinglyAfter-action review report with tracked corrective actions and closure datesHSE ManagerAfter each incident/drill
77Training, Drills & Continuous ImprovementManagement review of security preparedness status conducted, incorporating regulatory updates and lessons learnedManagement review minutes with action tracker and next review dateProject DirectorSemi-annually
78Training, Drills & Continuous ImprovementEmergency equipment (shelters, alarms, first aid, comms) audited for functionality and readiness on a scheduled basisEquipment readiness audit checklist signed off by HSE ManagerHSE ManagerQuarterly
79Site Access Control During Heightened ThreatAccess control measures tightened (ID verification, vehicle inspection) during periods of elevated regional security alertEnhanced access control log showing additional checks performedSecurity ManagerDuring elevated alert periods
80Site Access Control During Heightened ThreatNon-essential visitors and deliveries restricted or rescheduled during confirmed high-threat periods per management directiveVisitor/delivery restriction log with directive referenceSecurity ManagerDuring high-threat periods
81Site Access Control During Heightened ThreatPerimeter security patrols increased in frequency during periods of regional tensionPatrol log showing increased frequency and findingsSecurity ManagerDuring elevated tension
82Site Access Control During Heightened ThreatVehicle and material inspection points reinforced to detect suspicious items during heightened alert statusInspection checkpoint log with inspection outcomes recordedSecurity OfficerDuring elevated alert periods
83Site Access Control During Heightened ThreatSite badge/access credential audit conducted to remove inactive or unauthorized personnel access during security escalationAccess credential audit report with revocations loggedSecurity ManagerUpon threat escalation and quarterly
84Records, Reporting & Regulatory ComplianceAll security-related incidents formally reported to Police and Civil Defence per statutory notification timeframesIncident notification record with authority reference number and timestampSecurity ManagerWithin statutory timeframe, each occurrence
85Records, Reporting & Regulatory ComplianceCompliance with any Ministry of Interior or NCEMA circulars regarding construction site security tracked and archivedCircular compliance register with implementation evidenceCompliance OfficerOngoing, upon each circular
86Records, Reporting & Regulatory ComplianceEmergency Response Plan version control maintained with distribution log to all site supervisorsDocument control register showing current ERP version and distribution recordDocument ControllerUpon each revision
87Records, Reporting & Regulatory ComplianceStatistics on drills, alerts received and response times compiled and reviewed at monthly management meetingMonthly security preparedness report presented to managementHSE ManagerMonthly
88Records, Reporting & Regulatory ComplianceThird-party audit or government inspection findings on emergency preparedness tracked to closureAudit finding tracker with corrective action closure evidenceHSE ManagerOngoing until closure

Each checkpoint records Status (Yes / No / N/A), Comments, Corrective Action and Sign-off. Switch to Complete in-app to fill it here, or download the blank version to complete on site.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.