Workbook · Part H

H

High-Risk Construction Activities

Progress dashboard

0 of 49 items complete · saved locally to this browser

0%
Complete
0
In progress
0
Blocked
0
Overdue
0
Due ≤14d
0

Document Control

Reference
HSE-MAN-H-HIGH-RISK
Version
Rev. 0 — Draft for review
Owner
Corporate / Project HSE Manager
Approving authority
Managing Director / Project Director
Review frequency
Annual and after high-risk incident, authority/client change, method change or project scope change

Plans (24)

#TitleOwnerStatusPriority
70Plan H70 Lifting Safety ProgramRelevant process owner / HSE leadIntegratedSee plan sheet
71Plan H71 Crane Hoist and RigginRelevant process owner / HSE leadIntegratedSee plan sheet
72Plan H72 Lifting Sling ConfigurRelevant process owner / HSE leadIntegratedSee plan sheet
73Plan H73 Work at Height ProgramRelevant process owner / HSE leadIntegratedSee plan sheet
74Plan H74 Fall Protection and ReRelevant process owner / HSE leadIntegratedSee plan sheet
75Plan H75 Full Body Harness InspRelevant process owner / HSE leadIntegratedSee plan sheet
76Plan H76 Scaffolding Safety ProRelevant process owner / HSE leadIntegratedSee plan sheet
77Plan H77 Formwork Falsework andRelevant process owner / HSE leadIntegratedSee plan sheet
78Plan H78 Excavation and TrenchiRelevant process owner / HSE leadIntegratedSee plan sheet
79Plan H79 Underground and OverheRelevant process owner / HSE leadIntegratedSee plan sheet
80Plan H80 Confined Space Entry PRelevant process owner / HSE leadIntegratedSee plan sheet
81Plan H81 Electrical Safety ProgRelevant process owner / HSE leadIntegratedSee plan sheet
82Plan H82 Lockout Tagout and Iso (ISO 9001 Quality / ISO 14001 Environmental / ISO 45001 OH&S)Relevant process owner / HSE leadIntegratedSee plan sheet
83Plan H83 Welding Cutting and HoRelevant process owner / HSE leadIntegratedSee plan sheet
84Plan H84 Concrete Pouring PumpiRelevant process owner / HSE leadIntegratedSee plan sheet
85Plan H85 Rebar Steel Fixing andRelevant process owner / HSE leadIntegratedSee plan sheet
86Plan H86 Masonry Blockwork PlasRelevant process owner / HSE leadIntegratedSee plan sheet
87Plan H87 Waterproofing CoatingRelevant process owner / HSE leadIntegratedSee plan sheet
88Plan H88 Demolition DismantlingRelevant process owner / HSE leadIntegratedSee plan sheet
89Plan H89 Roof Works and FragileRelevant process owner / HSE leadIntegratedSee plan sheet
90Plan H90 Road Works and Work AdRelevant process owner / HSE leadIntegratedSee plan sheet
91Plan H91 Work Over or Near WateRelevant process owner / HSE leadIntegratedSee plan sheet
92Plan H92 Night Work and LowVisiRelevant process owner / HSE leadIntegratedSee plan sheet
93Plan H93 Lone Working and RemotRelevant process owner / HSE leadIntegratedSee plan sheet

Registers, Matrices & Checklists (25)

  • High Risk Permit Matrix
  • Lifting Controls
  • Crane Rigging Controls
  • Sling Selection Matrix
  • Work at Height Matrix
  • Fall Rescue Readiness
  • Harness Inspection Criteria
  • Scaffold Control Register
  • Temporary Works Controls
  • Excavation Controls
  • Utility Strike Prevention
  • Confined Space Controls
  • Electrical Safety Controls
  • LOTO Isolation Steps
  • Hot Work Controls
  • Concrete Pumping Controls
  • Steel Rebar Controls
  • Finishing Works Controls
  • Coating Spray Controls
  • Demolition Strip-Out Contro
  • Roof Fragile Surface Contro
  • Traffic Work Controls
  • Water Interface Controls
  • Night Work Controls
  • Lone Remote Work Controls

Visualisation Dashboard available

This part ships with editable charts and a visual dashboard aggregating its register data.

Item tracker

ItemStatusDue dateNotes
Plan H70 Lifting Safety Program
plan
Plan H71 Crane Hoist and Riggin
plan
Plan H72 Lifting Sling Configur
plan
Plan H73 Work at Height Program
plan
Plan H74 Fall Protection and Re
plan
Plan H75 Full Body Harness Insp
plan
Plan H76 Scaffolding Safety Pro
plan
Plan H77 Formwork Falsework and
plan
Plan H78 Excavation and Trenchi
plan
Plan H79 Underground and Overhe
plan
Plan H80 Confined Space Entry P
plan
Plan H81 Electrical Safety Prog
plan
Plan H82 Lockout Tagout and Iso (ISO 9001 Quality / ISO 14001 Environmental / ISO 45001 OH&S)
plan
Plan H83 Welding Cutting and Ho
plan
Plan H84 Concrete Pouring Pumpi
plan
Plan H85 Rebar Steel Fixing and
plan
Plan H86 Masonry Blockwork Plas
plan
Plan H87 Waterproofing Coating
plan
Plan H88 Demolition Dismantling
plan
Plan H89 Roof Works and Fragile
plan
Plan H90 Road Works and Work Ad
plan
Plan H91 Work Over or Near Wate
plan
Plan H92 Night Work and LowVisi
plan
Plan H93 Lone Working and Remot
plan
High Risk Permit Matrix
register
Lifting Controls
register
Crane Rigging Controls
register
Sling Selection Matrix
register
Work at Height Matrix
register
Fall Rescue Readiness
register
Harness Inspection Criteria
register
Scaffold Control Register
register
Temporary Works Controls
register
Excavation Controls
register
Utility Strike Prevention
register
Confined Space Controls
register
Electrical Safety Controls
register
LOTO Isolation Steps
register
Hot Work Controls
register
Concrete Pumping Controls
register
Steel Rebar Controls
register
Finishing Works Controls
register
Coating Spray Controls
register
Demolition Strip-Out Contro
register
Roof Fragile Surface Contro
register
Traffic Work Controls
register
Water Interface Controls
register
Night Work Controls
register
Lone Remote Work Controls
register