## Abu Dhabi City Municipality — Circular No. 001/2021, Safety requirement for tower cranes

The circular’s first page is titled **“Safety requirement for tower cranes”** and applies to consultants, contractors, and developers working in the building and construction sector in Abu Dhabi City. It explicitly states the following requirements:

| Control area | Browser-verified finding |
|---|---|
| Permit | A permit to install the tower crane must be obtained from Abu Dhabi City Municipality for all types of cranes, including self-erecting cranes, in accordance with approved MEPS drawings. |
| Erection | The erection company and technical inspection provider must confirm that the erection permit was issued and installation follows approved drawings and specifications. |
| Site boundary | Tower cranes must be erected wholly within the project plot boundary. All lifting-operational crane parts, including counterweight and boom, must not exceed the project fence/plot limit. |
| Multi-crane interface | Tower cranes must be located so as not to create collision risk with other cranes in all operating configurations. |
| Maintenance | Monthly inspection and maintenance are to be carried out by a specialized third-party maintenance company, following manufacturer recommendations and considering age and condition; reports must be available on request. |
| Pre-use inspection | Daily and weekly inspection must be conducted by a competent person; reports must be available on request. |

Source: [DMT / Abu Dhabi City Municipality Circular No. 001/2021](https://www.dmt.gov.ae/-/media/Project/DMT/ADM/AboutUs/EHS/Circulars/Tower-crane-Circular-Jan-2021.pdf), viewed 24 August 2026.

> Note: Further requirements visible only on page 2 have not yet been used as verified findings in this log. The final package will distinguish this circular’s specific mandatory controls from requirements that require direct authority confirmation.

## UAE Government workplace safety portal

The UAE Government workplace safety URL was opened but did not render textual content in the available browser view. It should not be treated as the sole evidence for any detailed requirement. The final package will cite direct legislation and accessible official authority sources.

Source: [UAE Government — Health and safety at workplace](https://u.ae/en/information-and-services/jobs/workplace-regulations/health-and-safety-at-workplace), accessed 24 August 2026.

## Abu Dhabi City Municipality — Circular No. 001/2021, page 2

The second page of the circular was visually reviewed and adds the following explicit requirements:

| Control area | Browser-verified finding |
|---|---|
| Independent examination and competency | All cranes are to be inspected by an approved third party company every year, and all lifting gears every six months. Crane operators and riggers must undergo third-party competence training every year and internal refresher training every quarter. |
| Collision protection | An anti-collision system must be installed when two tower cranes or more work in the same radius; zoning systems must be installed where applicable. |
| Older crane NDT | Old cranes of 15 years and above must be inspected by NDT to confirm that they remain safe for operation. |
| Aviation lighting | Aviation lights must be installed on all tower cranes in line with Abu Dhabi Airports Authority requirements. |

Source: [DMT / Abu Dhabi City Municipality Circular No. 001/2021](https://www.dmt.gov.ae/-/media/Project/DMT/ADM/AboutUs/EHS/Circulars/Tower-crane-Circular-Jan-2021.pdf), page 2, viewed 24 August 2026.

## Dubai Civil Aviation Authority — crane-operation service

The official DCAA crane-operation service URL was opened. The public browser view did not render the service details beyond the site shell; therefore, the final package will state the DCAA approval requirement as an authority-verification item and will not reproduce unverified height, lighting, or submission thresholds from secondary sources.

Source: [DCAA — Use Cranes](https://www.dcaa.gov.ae/services/building-constructions/use-cranes), accessed 24 August 2026.

## Extracted official-source findings

| Source | Verified finding used in final package | Evidence boundary |
|---|---|---|
| MoIAT / ENAS ETR 06 | Tower cranes are within Class A1 powered lifting machines. The document defines inspection-body competence and sets a 12-month mandatory inspection frequency for Class A1 and a six-month interval for Class C lifting accessories. It specifies certificate contents and says authorities may reject incomplete third-party certificates. It also notes full NDT every two years during normal inspection and a 25% SWL reduction for tower cranes aged 20 years. | ETR 06 is dated 11 August 2014. The project team must check current authority acceptance and whether a more recent condition or circular applies. |
| Sharjah City Municipality service catalogue | The service is explicitly for requesting issuance or renewal of a tower-crane permit to install and use a tower crane and equipment within site boundaries. | Public extract did not expose document checklist or technical conditions; confirm them directly with SCM. |
| Trakhees guideline G20 | Requires RA for mechanical lifts; SLI over 1 tonne; anti-collision where two or more cranes may collide; anemometer on highest crane; manufacturer wind limit; 12-month equipment testing and six-month lifting-accessory examination; certification for crane operator, signaller and slinger by approved third parties; recorded weekly service inspection; lifting manager and supervisor for critical lifts; radio communication if no line of sight or crane exceeds 35 m ground-to-cab; tested climbing frames; emergency procedure. | Apply only where Trakhees is the governing authority, or as a sound control benchmark if the local authority accepts it. |
| Ajman Municipality service catalogue | AJ municipality offers a compliance-with-environmental-and-safety-requirements certificate service for facilities requested by local or federal authorities. | The page is not a crane-specific approval instrument; it does not validate a specific crane permit, inspection frequency, operator licence, or wind limit. |
| Ras Al Khaimah Municipality ZP07 | Arrangement and Mobilization Permit can authorize preparation tasks including bringing in cranes or heavy machinery before the building permit is secured. Required inputs include site plan, trade licence and site-service clearance NOCs; activities must remain inside plot boundaries; validity is 12 months. | This source is about mobilization, not the whole tower-crane lifecycle. A separate construction/structural and HSE approval may still apply. |
| Umm Al Quwain service catalogue | Building-permit service requires contractor licence, NOCs including Civil Defence and utilities where necessary, location inspection form, reports/drawings and engineering approval. | No publicly accessible UAQ tower-crane service specification was located; verify crane-specific submission and inspection expectations with Engineering Affairs and Civil Defence. |

Sources were extracted on 24 August 2026 from the relevant official authority URLs.